Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance H NO 2198 GOKULWADI SANQUELIM GOA | NORTH GOA | GOA | 403001 | -20.00% | ₹9.7 L | L1 | Admitted-Finance |
| 2 | L2₹10.2 LAdmitted-Finance | -16.00% | ₹10.2 L | L2 | Admitted-Finance |
| 3 | L3₹12.3 LAdmitted-Finance DEULWADA PALE BICHOLIM GOA | NORTH GOA | GOA | 403001 | +2.00% | ₹12.3 L | L3 | Admitted-Finance |
Tender Value
₹12.1 L
EMD Value
₹24,186
Closing Date
19 Jun 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji - Goa
Construction of compound wall, gutter and providing and laying pavers near Navdurga temple at Deulwada in V.P. Surla, of Z.P. Pale Constituency.
2026_ZP_29752_1
NGZP/02/2026-27/38/218/L29
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,186
14 Jul 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: | |||||
| 1.01 | Hard soil | 369 | m2 | 66 | ₹24,354 |
| 2Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. | |||||
| 2.01 | All kinds of soil | 70.5 | m3 | 291 | ₹20,515.5 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 66.9 | m3 | 2,211 | ₹1,47,915.9 |
| 4Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 4.01 | All works upto plinth level | 61.4 | m3 | 6,635 | ₹4,07,389 |
| 5Centering & shuttering including Strutting, Propping & removal of forms for | |||||
| 5.01 | Foundations, footings, bases for columns and mass concrete. | 70 | m2 | 407 | ₹28,490 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 7.2 | m3 | 5,186 | ₹37,339.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_30176.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].