Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | ₹4.1 L | 1 | Accepted-AOC Quoted less |
| 2 | 2₹4.2 LRejected-Finance | ₹4.2 L | 2 | Rejected-Finance Quoted More |
| Sl No | Description | Qty | Unit | RAMASAMY M L2 | PMS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Air Blower Induction Moter Labour Charges For Dismantling rewinding Bearing New Bearing Changing Inslouding Load Test 15 Hp | 1 | Nos | 16,000 ₹16,000 | 15,400 ₹15,400 |
| 2.00 | Labour Charges for dismantling and reassembling non clog sewer motor pump set from UGD well with the help of safety accessiores in un heyganic condition including load test. 7.50 HP | 1 | Nos | 6,000 ₹6,000 | 5,500 ₹5,500 |
| 3.00 | 15 Hp | 1 | Nos | 9,000 ₹9,000 | 8,500 ₹8,500 |
| 4.00 | 20 HP | 1 | Nos | 10,500 ₹10,500 | 10,000 ₹10,000 |
| 5.00 | 35.00 HP | 1 | Nos | 17,000 ₹17,000 | 16,400 ₹16,400 |
| 6.00 | Rewinding of HP induction non clog sewer sub motor pump with including removal of materials to be deducted, Including insulation class'F' electrically grade round copper winding wire heat product sleeues and warnished by epoxy body moisture and chemical proff varnishing with cleaning of winding core slots and reparing the core sa per student including replacement of terminal block 7.50 HP | 1 | Nos | 15,500 ₹15,500 | 15,200 ₹15,200 |
| 7.00 | 15 Hp | 1 | Nos | 23,000 ₹23,000 | 22,700 ₹22,700 |
| 8.00 | 20 HP | 1 | Nos | 25,000 ₹25,000 | 24,000 ₹24,000 |
| 9.00 | 35.00 HP | 1 | Nos | 36,000 ₹36,000 | 38,500 ₹38,500 |
| 10.00 | Providing top and bottom shile suitable for all HP model inducting non clog sewerage submersibile motor pump leak proff of sewer water in the UGD well for the conncetivity point of carbon and stainless steel etc 7.50 HP | 1 | Nos | 15,800 ₹15,800 | 15,700 ₹15,700 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Jan 2026, 3:00 pmClosed
The Commissioner
municipal office,Municipal office road,Mettur
Repairing and reconditioning of non clog submersible motor
2026_MAWS_644449_1
1389/2025/E1
Open Tender
Civil Works
Municipal office
please refer tender notice
2 documents required · 2 mandatory
₹0
₹5,000
13 Feb 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
Air Blower Induction Moter Labour Charges For Dismantling rewinding Bearing New Bearing Changing Inslouding Load Test 15 Hp
Labour Charges for dismantling and reassembling non clog sewer motor pump set from UGD well with the help of safety accessiores in un heyganic condition including load test. 7.50 HP
Rewinding of HP induction non clog sewer sub motor pump with including removal of materials to be deducted, Including insulation class'F' electrically grade round copper winding wire heat product sleeues and warnished by epoxy body moisture and chemical proff varnishing with cleaning of winding core slots and reparing the core sa per student including replacement of terminal block 7.50 HP
Providing top and bottom shile suitable for all HP model inducting non clog sewerage submersibile motor pump leak proff of sewer water in the UGD well for the conncetivity point of carbon and stainless steel etc 7.50 HP
Providing top and bottom bearing suitable for all HP model inducting non clog sewerage submersibile motor pump leak proff of sewer water in the UGD well for the conncetivity point of carbon and stainless steel etc 7.50 HP
Providing Nitrill quality O' Rings suitable for arreasting the seweage water enter winding oil chamber to the non clog seweage sub motor and cable inter kit and replacing od oil O'ring 7.50 HP
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_772303.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_772303.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid