| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.2 L+₹2,361.23 (1.98%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.3 L+₹6,029.28 (5.05%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.3 L+₹10,923.29 (9.16%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | U.Abhishekwaran Contractor L3 | Karunanithi V L4 | P PICHANDI L2 | AIM INFRA L1 |
|---|---|---|---|---|---|---|---|
| 1.00Arcot Block | |||||||
| 2.00Constrcution of New Pump Room at Mandhaveli Street in Narayanapuram H/O Puttuthakku panchayat in Arcot Block Ranipet District | |||||||
| 3.00 | Earth work excavation and depositing on bank with initial lead and lift in Hard stiff clay,stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS 20B | 6 | Cum | 150 ₹900 Lowest | 320 ₹1,920 | 280 ₹1,680 | 263.78 ₹1,582.68 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc | 0.6 | Cum | 5,000 ₹3,000 Lowest | 5,599.6 ₹3,359.76 | 5,300 ₹3,180 | 6,099.6 ₹3,659.76 |
| 5.00 | RR Masonry in CM 1:5 mix using good stone including cost and conveyance and all labour charges etc complete | 0.95 | Cum | 600 ₹570 Lowest | 6,087.51 ₹5,783.13 | 6,080.51 ₹5,776.48 | 5,287.51 ₹5,023.13 |
| 6.00 | Brick work in CM 1:5 mix using good stone including cost and conveyance and all labour charges etc complete | 4.03 | Cum | 900 ₹3,627 Lowest | 6,087.51 ₹24,532.67 | 6,080 ₹24,502.4 | 4,887.51 ₹19,696.67 |
| 7.00 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges | 8.8 | Sqm | 340 ₹2,992 Lowest | 1,095 ₹9,636 | 700 ₹6,160 | 1,095 ₹9,636 |
| 8.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc complete | 0.16 | MT | 1,500 ₹234 Lowest | 91,944.7 ₹14,343.37 | 91,930.7 ₹14,341.19 | 83,000 ₹12,948 |
| 9.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc complete | 0.69 | Cum | 400 ₹276 Lowest | 8,577.64 ₹5,918.57 | 8,570.64 ₹5,913.74 | 8,577.64 ₹5,918.57 |
| 10.00 | Towards cost and supply of steel door including cost and conveyance and all labour charges etc complete | 1.53 | Sqm | 300 ₹459 Lowest | 4,927.6 ₹7,539.23 | 4,927.6 ₹7,539.23 | 4,927.6 ₹7,539.23 |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
22 Dec 2025, 3:00 pmClosed
Arcot BDO Office
Arcot BDO Office
Constrcution of New Pump Room at Mandhaveli Street in Narayanapuram H/O Puttuthakku panchayat in Arcot Block Ranipet District
2025_RDTN_632154_1
B1/1838/2025
Open Tender
Civil Works
Item Rate
30 days
Arcot BDO Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,300
17 Oct 2026
15 Dec 2025
22 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
Amount
Arcot Block
Constrcution of New Pump Room at Mandhaveli Street in Narayanapuram H/O Puttuthakku panchayat in Arcot Block Ranipet District
Earth work excavation and depositing on bank with initial lead and lift in Hard stiff clay,stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS 20B
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc
RR Masonry in CM 1:5 mix using good stone including cost and conveyance and all labour charges etc complete
Brick work in CM 1:5 mix using good stone including cost and conveyance and all labour charges etc complete
Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges
Supply and fabrication of steel including cost and conveyance and all labour charges etc complete
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc complete
Towards cost and supply of steel door including cost and conveyance and all labour charges etc complete
Plastering with CM 1:3, 10mm thick including cost and conveyance and all labour charges etc complete
Plastering with CM 1:5, 12mm thick including cost and conveyance and all labour charges etc complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance
Painting two coats using plastic emulsion including cost and conveyance and all labour charges etc complete
Painting two coats using Enamel paint including cost and conveyance and all labour charges etc complete
7/20 Service Wire
Provision for Light Point
Provision for Plug Point
Supply and fixing of 32 Amps DP Switch of 500 V with metal clad with fuse and neutral (Side Handle) on suitable TW Board , with earth connection only SD 143
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 20mm dia GI pipe (Class 'B')
Supply and fixing of TNEB meter Board suitable for 32A Single Phase service connection with 3 Nos. 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat)
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
P PICHANDI (BID ID -1540638)
U.Abhishekwaran Contractor (BID ID -1541557)
Karunanithi V (BID ID -1540792)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TB.pdf
Tender Documents • 0.37 MB
BOQ_756249.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .