Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹2,917.44 (1.53%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹5,834.88 (3.06%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
10 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_316305_6
e.NIT No. 50 REW UDHAMPUR of 2026.27 Dated 16.07.2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,880
14 Aug 2026
17 Jul 2026
11 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earh Work in trench Excavation by mechanical Means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge. | 6.22 | Sqm | 256.85 | ₹1,597.61 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 7.7 | Cum | 5,733.6 | ₹44,148.72 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: | 35.53 | Cum | 2,793.8 | ₹99,263.71 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 26.94 | Sqm | 286.35 | ₹7,714.27 |
| 6 | Excavation /supplying and flling of local earth | 101.65 | Sqm | 276.6 | ₹28,116.39 |
| 7 | Carriage of sand | 3.62 | Cum | 796.3 | ₹2,882.61 |
| 8 | Carriage of Bajri | 7.25 | Cum | 200.74 | ₹1,455.37 |
| 9 | Carriage of stones | 29.25 | Cum | 215.98 | ₹6,317.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1030691.xls
BOQ • 0.24 MB
extensionfinal.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .