Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -0.30% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹4,721.12 (1.86%)Admitted-Finance | +1.55% | ₹2.6 L+₹4,721.12 (1.86%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹6,253.26 (2.46%)Admitted-Finance | +2.16% | ₹2.6 L+₹6,253.26 (2.46%) | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,080
Closing Date
14 Aug 2026, 6:00 pmClosed
Executive Enginner REW jammu
Executive Enginner REW jammu
Laying of Slab Work of Bowli and other allied works near Mata Mandir w.no.4,Pyt Bandral Khurd Block Akhnoor Under scheme DDC District Capex Budget for the year 2026-27 (Pyt Level)
2026_RDPR_318822_1
e-NIT No. 343 REWJ of 2026-27 dated 31-07-2026
Open Tender
Civil Works
Percentage
Executive Enginner REW jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,080
9 Sept 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manually means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. Cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: AKOS | 4 | cum | 479.3 | ₹1,917.2 |
| 2 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 17.5 | cum | 5,733.6 | ₹1,00,338 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.83 | cum | 7,788.4 | ₹6,464.37 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 30 | kg | 123.2 | ₹3,696 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 0.43 | cum | 7,877.4 | ₹3,387.28 |
| 6 | Providing and laying rectified Glazed Ceramic floor tiles of size
300x300 mm or more (thickness to be specified by the manufacturer), of
1st quality conforming to IS : 15622, of approved make, laid on 20 mm
thick cement mortar 1:4 (1Cement : 4 Coarse sand), including grouting
the joints with white cement and matching pigments etc., complete.
In colour such as White, Ivory, Grey, Fume Red Brown | 80 | sqm | 1,222.3 | ₹97,784 |
| 7 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete.Welded | 110 | Kg | 138.2 | ₹15,202 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 61.2 | sqm | 286.35 | ₹17,524.62 |
| 9 | Providing Galavanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mm | 16.5 | sqm | 250 | ₹4,125 |
| 10 | Carriage of Sand avg. 6 km lead by MT | 1.73 | cum | 216.4 | ₹374.37 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1052760.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .