| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC SHOP NO 14 VIRAL APARTMENT OPP SHOPPERS STOP S V ROAD ANDHERI W MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | ₹2.3 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.2 Cr+₹88.1 L (38.5%)Rejected-Finance 001 HPS MARKET KANPUR GANDHI CHAURAHA RAEBARELI UTTAR PRADESH 229206 UDYAM UP 62 0025959 | RAE BARELI | UTTAR PRADESH | 229206 | ₹3.2 Cr+₹88.1 L (38.5%) | L2 | Rejected-Finance Being L2 |
| Sl No | Description | Qty | Unit | Shree Enterprises L2 | Bharat Construction Company (Bombay) L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge | 250 | CuM | 400 ₹1,00,000 Lowest | 1,269 ₹3,17,250 |
| 2.00 | Dismantling of RCC works carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge | 500 | CuM | 1,450 ₹7,25,000 Lowest | 1,890 ₹9,45,000 |
| 3.00 | Dismantling manually / by mechanical means including stacking of serviceable materials and disposal of unserviceable materilas within 200 m lead as per direction of Engineer-in-charge
(a)WBM Road | 500 | CuM | 400 ₹2,00,000 Lowest | 639 ₹3,19,500 |
| 4.00 | Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead
(a)Bituminous Road | 20 | CuM | 400 ₹8,000 Lowest | 1,818 ₹36,360 |
| 5.00 | Demolishing Stone rubble masonry (In cement mortar) manually / by mechanical means carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge | 20 | CuM | 300 ₹6,000 Lowest | 1,441 ₹28,820 |
| 6.00 | Dismantling and stacking within 100 m lead fencing posts or struts including all earth work and dismantling of concrete etc
"T" or "L" iron or pipe | 50 | Nos | 100 ₹5,000 Lowest | 126 ₹6,300 |
| 7.00 | Dismantling and stacking within 100 m lead fencing posts or struts including all earth work and dismantling of concrete etc
R.C.C Post | 50 | Nos | 100 ₹5,000 Lowest | 549 ₹27,450 |
| 8.00 | Dismantling barbed wire / flexible wire rope in fencing including making rolls and stacking within 100 m lead | 120 | Kg | 20 ₹2,400 Lowest | 72 ₹8,640 |
| 9.00 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead | 1 | MT | 10,000 ₹10,000 Lowest | 22,500 ₹22,500 |
| 10.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
(a) From 0.00 to 1.50 m depth from Average Ground Level | 1,400 | CuM | 800 ₹11,20,000 | 459 ₹6,42,600 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹6.8 L
Closing Date
17 Nov 2025, 3:00 pmClosed
Chief Engineer
CED, BARC, Trombay, Mumbai.
Construction of RCC Roads, RCC Drain, fencing, and Precast Box Culvert for diversion of Electrical, Mechanical and other services for Proposed Administrative Complex and other locations at North Site, BARC, Trombay, Mumbai.
2025_BARC_880598_1
BARC/CED/ET/42/2025-2026 Dated 08/10/2025
Open Tender
Civil Works
Item Rate
274 days
North Site, BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹6.8 L
CED, BARC, Trombay, Mumbai.
18 Mar 2026
10 Oct 2025
19 Nov 2025
10 Oct 2025
17 Nov 2025
6 Nov 2025
10 Oct 2025 - 24 Oct 2025
30 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge | 250 | CuM | - | - |
| 2 | Dismantling of RCC works carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge | 500 | CuM | - | - |
| 3 | Dismantling manually / by mechanical means including stacking of serviceable materials and disposal of unserviceable materilas within 200 m lead as per direction of Engineer-in-charge
(a)WBM Road | 500 | CuM | - | - |
| 4 | Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead
(a)Bituminous Road | 20 | CuM | - | - |
| 5 | Demolishing Stone rubble masonry (In cement mortar) manually / by mechanical means carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge | 20 | CuM | - | - |
| 6 | Dismantling and stacking within 100 m lead fencing posts or struts including all earth work and dismantling of concrete etc
"T" or "L" iron or pipe | 50 | Nos | - | - |
| 7 | Dismantling and stacking within 100 m lead fencing posts or struts including all earth work and dismantling of concrete etc
R.C.C Post | 50 | Nos | - | - |
| 8 | Dismantling barbed wire / flexible wire rope in fencing including making rolls and stacking within 100 m lead | 120 | Kg | - | - |
| 9 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead | 1 | MT | - | - |
| 10 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
(a) From 0.00 to 1.50 m depth from Average Ground Level | 1,400 | CuM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.24 MB
ProformaofScheduleET42.pdf
Tender Documents • 0.30 MB
SecheduleAET42.pdf
Tender Documents • 0.22 MB
TechnicalbidET42.xls
Tender Documents • 0.07 MB
Drawing.pdf
Tender Documents • 0.39 MB
BOQ_925587.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .