Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹7,780
Closing Date
17 Sept 2026, 6:00 pm5d left
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Constt. of Public Shed of Shamshanghat at Balah Panchayat Magowali Part B (Wno 4 and 5) Panchayat Magowali Block Suchetgarh under District Capex Budget PRI for the year 2026-27(BLOCK LEVEL)
2026_RDPR_324305_1
eNIT 566 REWJ of 2026-27 dated 11-09-2026
Open Tender
Civil Works
Percentage
30 days
Executive Engineer REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹7,780
11 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation by manual means in trenches for foundations, drains, pipes, cable etc(Not Exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soil. | 10.88 | cum | 479.3 | ₹5,214.78 |
| 2 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher) | 1.36 | Cum | 4,826.5 | ₹6,564.04 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto Plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.69 | Cum | 7,788.4 | ₹36,527.6 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.87 | Cum | 9,395.7 | ₹17,569.96 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.03 | Cum | 9,821.85 | ₹78,869.46 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 13.13 | Qtls | 12,320 | ₹1,61,761.6 |
| 7 | Centring and shuttering including strutting, propping etc and removal of form for foundations, footings, bases of column etc. for mass concrete | 40.15 | sqm | 286.35 | ₹11,496.67 |
| 8 | Centring and shuttering including strutting, propping etc and removal of form . for COLOUMNS | 21.19 | sqm | 742.55 | ₹15,734.63 |
| 9 | Centring and shuttering including strutting, propping etc and removal of form . for suspended floors | 41.82 | sqm | 718.2 | ₹30,035.12 |
| 10 | Centring and shuttering including strutting, propping etc and removal of form . Edges of Slab under 20 cms | 27.44 | m | 262.2 | ₹7,194.77 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1093844.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .