| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹365.7 CrAdmitted-Finance | ₹365.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹391.6 CrAdmitted-Finance | ₹391.6 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per PQ |
| Sl No | Description | Qty | Unit | SCON Projects Pvt ltd L2 | SATHLOKHAR SYNERGYS E&C GLOBAL LIMITED L1 |
|---|---|---|---|---|---|
| 1.00CIVIL AND STRUCTURAL WORKS | |||||
| 1.01EARTH WORKS: | |||||
| 1.02 | Clearing Light jungle including uprooting of trunk vegetation,grass,brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 36,625 | Sqm | 22.8 ₹9,85,359 | 15 ₹6,48,262.5 Lowest |
| 1.03 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the PMC/Employer and clearing and levelling the site, etc., complete complying with standard specification.The item shall include necessary civil works required for ensuring retention of full depth of excavation. | 13,483.92 | Cum | 218.4 ₹34,74,967.99 | 154 ₹24,50,297.94 Lowest |
| 1.04 | Up to 2.40m Depth | 2,696.74 | Cum | 258 ₹8,20,995.53 | 154 ₹4,90,051.59 Lowest |
| 1.05 | Up to 3.40m Depth | 6,741.86 | Cum | 321.6 ₹25,58,454.97 | 252 ₹20,04,759.49 Lowest |
| 1.06 | Up to 4.40m Depth | 4,477.3 | Cum | 406.8 ₹21,49,211.46 | 333 ₹17,59,310.26 Lowest |
| 1.07 | Up to 5.40m Depth | 850.46 | Cum | 492 ₹4,93,743.06 Lowest | 572 ₹5,74,026.48 |
| 1.08 | Up to 6.40m Depth | 510.27 | Cum | 568.8 ₹3,42,485.06 Lowest | 648 ₹3,90,172.85 |
| 1.09 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the PMC/Employer with an initial lead of 10 mts and initial lift of 2 mts. and including necessary backfilling in layers of not more than 15 cm thick well rammed, watered and consolidated, clearing and levelling the site, etc., complete complying with standard specification. | 4,274 | Cum | 297.6 ₹15,00,892.03 Lowest | 344 ₹17,34,902.08 |
Tender Value
Refer Docs
EMD Value
₹1.5 Cr
Closing Date
16 Feb 2026, 3:00 pmClosed
The Managing Director
TIDEL Park Ltd No.4, Rajiv Gandhi Salai, Taramani, Chennai 600113
Construction of IT Office Commercial Mixed Use Building Including Civil Construction Electrical HTLT HVAC Elevators IBMS FPS PHE Structural Facade Landscaping STP WTP and Other Allied Development Works at Hosur Krishnagiri TN
2026_TIDEC_643782_1
TIDEL/2025-26/21
Open Tender
Construction Works
Item Rate
730 days
Hosur, Krishnagiri District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.5 Cr
TIDEL Park Chennai
20 Feb 2026
14 Jan 2026
17 Feb 2026
14 Jan 2026
16 Feb 2026
7 Feb 2026
14 Jan 2026 - 23 Jan 2026
23 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL AND STRUCTURAL WORKS | - | - | - | - |
| - | EARTH WORKS: | - | - | - | - |
| - | Clearing Light jungle including uprooting of trunk vegetation,grass,brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 36,625 | Sqm | - | - |
| - | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the PMC/Employer and clearing and levelling the site, etc., complete complying with standard specification.The item shall include necessary civil works required for ensuring retention of full depth of excavation. | 13,483.92 | Cum | - | - |
| - | Up to 2.40m Depth | 2,696.74 | Cum | - | - |
| - | Up to 3.40m Depth | 6,741.86 | Cum | - | - |
| - | Up to 4.40m Depth | 4,477.3 | Cum | - | - |
| - | Up to 5.40m Depth | 850.46 | Cum | - | - |
| - | Up to 6.40m Depth | 510.27 | Cum | - | - |
| - | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the PMC/Employer with an initial lead of 10 mts and initial lift of 2 mts. and including necessary backfilling in layers of not more than 15 cm thick well rammed, watered and consolidated, clearing and levelling the site, etc., complete complying with standard specification. | 4,274 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.52 MB
VolumeIPQC.pdf
Tender Documents • 1.97 MB
VolumeIIConditionsofContract.pdf
Tender Documents • 2.69 MB
VOL5AArchitecturalDrawings.pdf
Tender Documents • 36.90 MB
VOL5CHVACFIREDrawings.pdf
Tender Documents • 30.36 MB
VOL5DMEPELVDrawings1.pdf
Tender Documents • 29.60 MB
VOL5EPHEDrawings.pdf
Additional Documents • 35.35 MB
VOL5BSTRUCTUREELECTRICALDrawings.pdf
Tender Documents • 37.43 MB
VolumeIIITechnicalSpec.pdf
Tender Documents • 22.30 MB
BOQ_771804.xls
BOQ • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].