Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.8 L
Closing Date
25 Sept 2021, 6:55 pmClosed
Executive Engineer REW Div. Poonch
Office of The Executive Engineer REW Div. Poonch
Please refer to BOQ
2021_RDPR_138430_1
e-NIT No. 54 of REW Poonch dated 08-09-2021
Open Tender
Civil Works
Item Rate
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer REW Div. Poonch
Exempted
8 Oct 2021
8 Sept 2021
27 Sept 2021
8 Sept 2021
25 Sept 2021
8 Sept 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with P/L of Hand Packed Stone (Plum), (20%) for cement concrete, excluding carriage of Stone (Plum)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Columns, pillars, piers, abutments, posts and struts.
Lintel, beams, plinth beams, girders, bressumers and cantilevers
Suspended floors, roofs, landings, balconies and access platforms.
Edges of slabs and breaks in floors and walls, Under 20 cm wide
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand), with Extra for brick work in superstructure above plinth level upto floor five level
Carriage of sand and bajri with average distance of 45 km by MT and 200 m by HL
Carriage of stone with average distance of 500 m by HL
Carriage of bricks with average distance of 230 km ny MT and 200 m by HL
Carriage of cement andSteel with average distance of 9KM by MT and 200 m by HL
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
Mohd Ibrahim
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .