Loading…
Loading…
Tender Value
₹50.4 L
EMD Value
₹1.0 L
Closing Date
2 Sept 2026, 12:00 pm
SE ECTC AGRA
220 KV S/S Sikandra, Agra
Civil Works For Construction Of 01 No. 245 KV Bus Coupler Bay at 220 KV S/S Sikandra, Distt- Agra.
2026_UPCTL_1174106_1
Tender No-07/ECTC/A/2026-27
Open Tender
Civil Works
Percentage
180 days
220 KV S/S Sikandra
Please refer the tender document
2 documents required · 2 mandatory
₹5,900
EE ECTD AGRA
₹1.0 L
1 Aug 2026
1 Aug 2026
3 Sept 2026
1 Aug 2026
2 Sept 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (CSI No. 2.31) | - | Sqm | 13.42 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (SOR 2.8.1) | - | CuM | 198.47 | - |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.( sor 2.25 a) | - | CuM | 469.04 | - |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials for All kind of soil (CSI 2.26.1) | - | CuM | 96.68 | - |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)(SOR 4.1.8) | - | CuM | 5,193.99 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns (SOR 4.3.1) | - | Sqm | 299.01 | - |
| 7 | Supply and filling in plinth with sand under floors,including watering,ramming,consolidating and dressing complete.( SOR NO.2.27 ) | - | CuM | 1,619.31 | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(SOR 4.1.2 ) | - | CuM | 6,359.7 | - |
| 9 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (SOR 5.1.2) | - | CuM | 6,897.17 | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(CSI 5.3) | - | CuM | 8,772.67 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
T7.pdf
Tender Documents • 2.56 MB
Tender Booklet.pdf
Tender Documents • 0.57 MB
BOQ_2205761.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].