EMD Value
₹25,000
Closing Date
14 Jul 2022, 4:00 pmClosed
Executive Engineer ED-II JPDCL Jammu
Office of the Executive Engineer ED-II JPDCL Jammu
Rate contract for Augmentation of Distribution Substation Transformers ranging from 25 KVA to 400 KVA installed at different locations within the jurisdiction of Electric Division-II Jammu during the FY 2022-23 (Key material like Poles and Transform
2022_PDD_174398_1
Enit 18 of 2022 dated 16-06-2022
Open Tender
Electrical Works
Turn-key
60 days
Within Jurisdiction of the XEN ED- II JPDCL Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer ED II JPDCL Jammu
₹25,000
13 Sept 2022
17 Jun 2022
15 Jul 2022
17 Jun 2022
14 Jul 2022
17 Jun 2022
17 Jun 2022 - 12 Jul 2022
Amount
Augmentation of 11/0.433kV, 25KVA to 63KVA , 3-phase Distribution Substation
Installation, Testing & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer including Transportation from Divisional Store at Miran Sahib to erection site. (11/0.433kV, 63 KVA , 3-phase Distribution Transformer shall be provided by the Department)
Erection of 9 Mtr Long ST Pole (ST-410 SP33) including Transportation from Divisional Store at Miran Sahib to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. (9 Mtr Long ST Pole ST-410 SP33 shall be provided by the Department)
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set
Providing & Fixing of PVC Cable 120 mm² alongwith 12 Nos Al. Thimble of 120 mm²
Providing & Fixing of LT Distribution Box with100 Amp MCCB for incomer & switch fuse unit for Out Going Ckt.
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum /pole
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Dismantling and Write Back of dismantled 25 KVA Distribution Transformer and allied material to Divisional store at Miran Sahib which includes labour and mechanical carriage charges involved
Description of Work / Item(s)
Amount
Augmentation of 11/0.433kV, 63 KVA to 100 KVA , 3-phase Distribution Substation
Installation, Testing & commissioning of 11/0.433 KV, 100 KVA 3-Phase Distribution Transformer including Transportation from Divisional Store at Miran Sahib to erection site. (11/0.433kV, 100 KVA , 3-phase Distribution Transformer shall be provided by the Department)
Erection of 9 Mtr Long ST Pole (ST-410 SP33) including Transportation from Divisional Store at Miran Sahib to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. (9 Mtr Long ST Pole ST-410 SP33 shall be provided by the Department)
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of PVC Cable 185 mm² alongwith 12 Nos Al. Thimble of 185 mm²
Providing & Fixing of LT Distribution Box for 100kVA DTR with 160A MCCB for incomer & SFU's for Outgoing Circuits including Busbar arrangements for Phases & Neutral of EC Grade Aluminium,PVC Insulated Sleeved Busbar of required load handling capacity with colour code for Phases and Neutral differentiation, including Aluminium thimbles of required sizes for proper termination etc.
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Dismantling and Write Back of dismantled 63 KVA Distribution Transformer and allied material to Divisional store at Miran Sahib which includes labour and mechanical carriage charges involved
Description of Work / Item(s)
Amount
Augmentation of 11/0.433kV, 100 KVA to 250 KVA , 3-phase Distribution Substation
Installation, Testing & commissioning of 11/0.433 KV, 250 KVA 3-Phase Distribution Transformer including Transportation from Divisional Store at Miran Sahib to erection site. (11/0.433kV, 250 KVA , 3-phase Distribution Transformer shall be provided by the Department)
Erection of 9 Mtr Long ST Pole (ST-410 SP33) including Transportation from Divisional Store at Miran Sahib to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. (9 Mtr Long ST Pole ST-410 SP33 shall be provided by the Department)
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Providing & Fixing of Single Phase PVC Cable 240 mm² ,1.1K V Grade, PVC Insulated Stranded Un-Armoured FRLS type alongwith Al. Thimbles for 240 mm² Cable termination with four colored PVC Tapings to distinguish the LT Phases and the Neutral. (2 Ckt)
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing & Fixing of Pole mounted LT Distribution Box for 250 KVA DTR with 2 No. Triple Pole MCCB of 300 Amp with adjustable overload release of (80-100%) for incomer & & switch fuse unit for Out Going 2No Ckts. including Busbar arrangements for Phases & Neutral of EC Grade Aluminium,PVC Insulated Sleeved Busbar of required load handling capacity with colour code for Phases and Neutral differentiation, including Aluminium thimbles of required sizes for proper termination etc.
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Dismantling and Write Back of dismantled 100 KVA Distribution Transformer and allied material to Divisional store at Miran Sahib which includes labour and mechanical carriage charges involved
Description of Work / Item(s)
Amount
Augmentation of 11/0.433kV, 250 KVA to 400 KVA , 3-phase Distribution Substation
Installation, Testing & commissioning of 11/0.433 KV, 400 KVA 3-Phase Distribution Transformer including Transportation from Divisional Store at Miran Sahib to erection site. (11/0.433kV, 400 KVA , 3-phase Distribution Transformer shall be provided by the Department)
Erection of 9 Mtr Long ST Pole (ST-410 SP33) including Transportation from Divisional Store at Miran Sahib to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. (9 Mtr Long ST Pole ST-410 SP33 shall be provided by the Department)
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Providing & Fixing of Single Phase PVC Cable 400 mm² ,1.1K V Grade, PVC Insulated Stranded Un-Armoured FRLS type alongwith Al. Thimbles for 400 mm² Cable termination with four colored PVC Tapings to distinguish the LT Phases and the Neutral. (2 Ckt)
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing & Fixing of Pole mounted LT Distribution Box for 400 KVA DTR with 2 No. Triple Pole MCCB of 400 Amp with adjustable overload release of (80-100%) for incomer & & switch fuse unit for Out Going 2No Ckts. including Busbar arrangements for Phases & Neutral of EC Grade Aluminium,PVC Insulated Sleeved Busbar of required load handling capacity with colour code for Phases and Neutral differentiation, including Aluminium thimbles of required sizes for proper termination etc.
Construction of Concrete-Cement (1:2:4) Platform (8x8x3) & 3feet below ground level ) for 400 KVA SubStation along with the mesh fencing (with two coats of metal oxide & Al. Paint) around the Periphery. (complete Job)
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Dismantling and Write Back of dismantled 250 KVA Distribution Transformer and allied material to Divisional store at Miran Sahib which includes labour and mechanical carriage charges involved
Description of Work / Item(s)
Amount
Augmentation of 11/0.433kV, 400 KVA to 630 KVA , 3-phase Distribution Substation
Installation, Testing & commissioning of 11/0.433 KV, 630 KVA 3-Phase Distribution Transformer including Transportation from Divisional Store at Miran Sahib to erection site. (11/0.433kV, 630 KVA , 3-phase Distribution Transformer shall be provided by the Department)
Erection of 9 Mtr Long ST Pole (ST-410 SP33) including Transportation from Divisional Store at Miran Sahib to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. (9 Mtr Long ST Pole ST-410 SP33 shall be provided by the Department)
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Providing & Fixing of Single Phase PVC Cable 400 mm² ,1.1K V Grade, PVC Insulated Stranded Un-Armoured FRLS type alongwith Al. Thimbles for 400 mm² Cable termination with four colored PVC Tapings to distinguish the LT Phases and the Neutral. (2 Ckt)
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing & Fixing of LT Distribution Box with 2No 630Amp Triple Pole MCCB for incomer with adjustable overload release of (80-100%) & switch fuse unit for Out Going 2No Ckts. including Busbar arrangements for Phases & Neutral of EC Grade Aluminium,PVC Insulated Sleeved Busbar of required load handling capacity with colour code for Phases and Neutral differentiation, including Aluminium thimbles of required sizes for proper termination etc.
Construction of Concrete-Cement (1:2:4) Platform (8x8x3) & 3feet below ground level ) for 630 KVA SubStation along with the mesh fencing (with two coats of metal oxide & Al. Paint) around the Periphery. (complete Job)
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Dismantling and Write Back of dismantled 400 KVA Distribution Transformer and allied material to Divisional store at Miran Sahib which includes labour and mechanical carriage charges involved
M/S NEW TRIKUTA TECHNOCRATES
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
JASMEET SINGH
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
JASMEET SINGH
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
JASMEET SINGH
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
M/S NEW TRIKUTA TECHNOCRATES
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .