Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -18.10% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹980.28 (0.40%)Admitted-Fee/PreQual/Technical/Finance | -17.77% | ₹2.4 L+₹980.28 (0.40%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.6 L+₹21,090.93 (8.67%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹2.6 L+₹21,090.93 (8.67%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹8,910
Closing Date
7 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
slab over drain at pri mohallah at Pringroo
2026_RDPR_323141_6
NIT NO 107 OF 2026-27 GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹8,910
17 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
2 Sept 2026 - 2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, stacking Laying & spreading GSB to specified lines ,grades and cross section including watering dressing and consolidation with power roller (8-10)ton capacity Complete as per relevant clause of MORTH specifications including scarifyng of existing road surface with costs & carriages of all materials involved upto site of work complete job. | - | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 3 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, and similar works. | - | kgs | 1 | - |
| 4 | Carriage of sand aggregates by MT 10 Kms | 1 | Cum | - | - |
| 5 | Add provision for Citizen Information board & photographs | - | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1086805.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .