Tender Value
₹3.8 L
EMD Value
₹3,800
Closing Date
24 Aug 2021, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Construction of a Pocket store room for Oil and handling division on the southern side of CPU building in MTPS-II.
2021_EB_207773_1
SE/Civil/MTPS-II/OT-26/2021-22
Open Tender
Civil Works - Others
Works
60 days
Mettur Dam-6
Tender Specification
2 documents required · 2 mandatory
₹0
₹3,800
Yes
27 Aug 2021
11 Aug 2021
25 Aug 2021
11 Aug 2021
24 Aug 2021
11 Aug 2021
Amount
Brick work in CM 1:4 using fly ash bricks as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P, etc., complete.
Providing and placing of RCC 1:1½:3 using 20mm HBG metal as directed by the Engineer at site, including cost of all materials, labours, lead, lift, shuttering, curing, etc,complete but excluding cost of reinforcement.A)For Grade beam
Providing and placing of RCC 1:1½:3 using 20mm HBG metal as directed by the Engineer at site, including cost of all materials, labours, lead, lift, shuttering, curing, etc,complete but excluding cost of reinforcement.B)For lintel beam, Sunshade & Roof slab
Supplying, fabricating and placing in position of RTS/MS rod for RCC works as directed by the Engineer at site including cost of steel, labour charges, binding wire, lead, lift, etc., complete.
Providing PCC 1:4:8 using 40 mm HBG metal for flooring as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, transport, etc. complete.
Plastering in C.M 1:3, 10 mm thick for Ceiling surfaces including cost of all materials, scaffolding charges, Labour charges, curing, T&P, Lead, Lift, etc., complete.
Plastering in CM 1:5, 12mm thick for wall surfaces including cost of all materials, scaffolding charges, Labour charges, curing, T&P, Lead, Lift, etc. complete.
Supplying, fabricating and fixing in position of MS fully paneled door of double leaf of required size using, 40X40X6mm MS Angles for door frame, 30X30X5mm MS Angles for shutter frame by adopting 5Nos. horizontally, 2Nos. vertically, shutter covered with 18 Gauge MS sheet, finished neatly as directed by the Engineer at site, including cost of all materials,painting two coats with enamel paint over a coat of primer providing locking arrangements, holdfast, hinges, labour, lead, lift, etc., complete.
Supplying and fixing in position of partly glazed mild steel windows of required size using 23x18x18x3mm 'Z' section for window main frame, 46x23x20x3mm 'J' section for intermediate frame, 23x18x18x 3mm 'Z' section for shutter frame with 4 leaves top leaves glazed with 4mm thick plain glass, bottom leaves panaled with M.S sheet of 18 gauge with 10mm square bar grill at 100mm c/c, 4 Nos of hold fasts, handle pulleys, latches with locking arrangements, including cost of fabrication, transporting, lifting and fixing, embedding the hold fasts in walls rigidly with concrete PCC 1:1½:3, painting two coats with enamel paint over a coat of primer, cost of all material, labour charges, lead, lift, T&P, etc., complete.
Floor finishing with CM 1:3, 20mm thick including cost of all materials, labour charges, curing, lead, lift etc., complete.
Supplying and fixing in position of 110mm dia. PVC pipe (4Kg/cm2) of approved make and quality with ISI monogram as directed by the Engineer in charge for Downfall Pipes including cost of all materials, all specials such as Tees, Elbow, Shoes, Clamps, Bends and screws, gratings etc., making holes in masonry / concrete, restoring the disturbed area to original condition, making water tight jointing with no leakage, labour, scaffolding, lead, Lift, etc., complete.
Providing one course of best pressed tiles of size 230x230x20mm as weathering course for roof slab embedded in 12mm thick Cement mortar 1:3 mixed with crude oil @ 10% by weight of cement over a bed of brick jelly in pure slacked lime in the ratio of 32:12.50 (32 parts of Brick jelly to 12.5 part of lime) to an average thickness of 80mm laid with required slope well beaten with wooden mallet and pointed with the same oiled mortar including cost of all materials, Labour,curing, Lead, Lift, etc., complete.
White washing with two coats of white cement for wall surface including cost of all materials, scaffolding, labour, lead, lift etc., complete.
Providing two coats of Oil bound distember of approved quality and colour over one coat of primer to the interior wall surfaces as directed by the Engineer at site, including cost of all materials, labour charges, scaffolding charges, lead, lift etc., complete.
Colour washing with two coats of cement paint over a coat of white cement for the exterior wall surfaces including cost of all materials, scaffolding, labour, curing, lead, lift, etc., complete.
Kuppusamy and Co
CKV ENGINEERING
SURIYA ENGINEERING CONTRACTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .