Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹1.9 L+₹18,135 (10.7%)Rejected-AOC 4 49 KTC NAGAR 1 ST STREET TUTICORIN 02 | TUTICORIN | TAMIL NADU | 626202 | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹1.2 L
EMD Value
₹1,200
Closing Date
29 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
Arresting of oil leakage in Generator Transformer 4 Y phase in Unit 4 during annual overhaul 2020 2021
2020_EB_167210_1
SE/ES/TTPS/126/2020-21
Open Tender
Electrical Works
Item Rate
60 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,200
Yes
5 Aug 2020
6 Jun 2020
30 Jun 2020
6 Jun 2020
29 Jun 2020
6 Jun 2020
90 days
Charges for shifting the department filter machine & extension of power supply: Charges for Transportation of department filter machine from its shed to the work spot at repair bay and providing power supply connection, Checking ideal running and performance of the machine and providing lighting arrangement. Disconnection of power supply, removal of lighting arrangement and shifting the filter machine to its shed after completion of work.
Draining of 4000 Litres Transformer oil from the Generator Transformer into Spare Oil Tank and recirculation : Charges for Draining of Transformer oil from main tank of GT to storage tanks and Hot oil circulation.
Charges for Dismantling and Assembling the equalizing pipe lines, inspection cover in the LV chamber 6 Nos and LV turret fixes in Generator Transformer 4 "Y phase"
Charges for Dismantling the LV flexible links between LV bushing and LV winding of the Generator Transformer 4 "Y phase"
Charges for Dismantling the LV turret, LV Bushings, superficial cleaning of LV bushings and replacement of new gaskets and reassembling in GT.
Filling the transformer with 4000 Ltrs. of treated oil : Charges for Flushing the Transformer core/ winding and filling up of oil into the Transformer. (84MVA single phase Generator Transformer)
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in GT.
Charges for hot oil circulation in the transformer, radiator tanks and conservator tank and for cooling cycle : Charges for Vacuum pulling, Oil filling and hot oil circulation (main tank, radiators & combined circulation) up to reaching of parameters to the satisfactory level in GT.
Charges for Transportation of the 10 KL oil storage tank from repair bay to transformer yard IV & return back to its original position.
Supply of new RC 70 Grade CORTICA Make neoprine cork gaskets of various sizes for replacement in Generator transformer : 1Mtr X 1 Mtr X 6 mm thick = 4 Nos.
D.R.ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .