| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹45.9 L+₹1.3 L (2.88%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹47.4 L+₹2.8 L (6.31%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
19 Sept 2022, 6:00 pmClosed
Garrison Engineer(N) Mamun
Garrison Engineer(N) Mamun PIN-145001
REPAIRS TO STEEL FURNITURE INCLUDING PAINTING AND RECANNING ETC UNDER GE (NORTH) MAMUN
2022_MES_546661_1
GE(N)/M-07/2022-23
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer(N) Mamun
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Garrison Engineer(N) Mamun
₹92,000
1 Nov 2022
22 Aug 2022
1 Oct 2022
22 Aug 2022
19 Sept 2022
7 Sept 2022
Amount
Repair to Almirah large steel with replacement of following items(components) with new material complete and all as specified ( Drg No:FD-1031 & 67(M)):-
Shelf made out of MS sheet one mm thick
All as per srl item No 1.01 but fixing only loose/hanging shelves.
CP handles with washers (As per sample)
Locks brass with duplicate keys. (The locks shall be of GI with six brass levers, (As per sample)
Legs made out of 1mm thick MS sheet
Base made out of MS sheet 20 gauge
MS hinges 75mm long (as approved by GE), fixed by welding
MS round bar (locking rod) 10mm dia with brass bush fitting
M&L for scrubbing down all old painted steel surface, preparation of surface with denting where required, applying putty etc and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to Almirah Medium steel with replacement of following items(components) with new material complete and all as specified ( FD-67 & 1032/1031):-
Shelf made out of MS sheet 1mm thick
All as per srl item No 2.01 but fixing only loose/hanging shelves.
CP handles with washers (As per sample)
Locks brass with duplicate keys. (The locks shall be of GI with six brass levers, (As per sample)
Leg made out of 1mm thick MS sheet
Base made out of MS sheet 20 gauge
MS hinges 75mm long (as approved by GE) by welding
M&L for scrubbing down all old painted steel surface, preparation of surface with denting where required, applying putty etc and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to locker steel with replacement of following items (components) with new material complete and all as specified (FD- 243 & 257):-
Shelf made out of MS sheet 1 mm and fixing with rivetting on locker steel
All as per item srl No 3.01 but fixing only loose/hanging shutter.
CP handles 100mm long.
CP hasp & staples 75mm long
MS hinge 75mm long (as approved by GE) by welding
Leg made out of 1mm thick MS sheet
Base/shelves made out of MS sheet 1 mm
M&L for scrubbing down all old painted steel surface, preparation of surface with denting where required, applying putty etc and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to table office clerk steel with replacement of following items (components) with new material and labour complete and all as specified ( FD-84 (M), FD-1004):-
Table top size 4’x2’-6” made out of 18mm thick HDHMR Board (high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
Drawer with 1mm thick MS sheet (with denting/welding or any other means to enable all the three drawer to work smoothly).
Locks with new GI locks with brass lever with duplicate keys.
PVC shoes
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to Teapoy verandah steel with replacement of following items (components) with new material and labour complete and all as specified ( FD-383, 255):-
Top with new top of size 3'X1.6' made out of 18 mm thick HDHMR Board(high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
PVC shoes
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to table office officer steel with replacement of following items (components) with new material and labour complete and all as specified (FD-84 (M), FD-1003):-
Top size 5’x3’ made out of 18mm thick HDHMR Board (high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
Drawer with 1mm thick MS sheet including the repairing the sliding surface of the drawer by smoothing the portion, denting/welding or any other means to enable all the three drawers to work smoothly
Locks with new brass lever locks with duplicate keys.
PVC shoe
PVC recessed Handle
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
PVC recessed Handle
Top size 3'x2' made out of 18mm thick HDHMR Board(high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
Drawer with 1mm thick MS sheet including the repairing the sliding surface of the drawer by smoothing the portion, denting/welding or any other means to enable all the drawers to work smoothly
GI lock with brass lever with duplicate keys.
PVC shoe
PVC recessed Handle
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to table 3'x2' steel with out drawer with replacement of following items (components) with new material and labour complete and all as specified (FD-1007):-
Table top with new top size 3'x2' made out of 18mm thick HDHMR Board(high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
PVC shoe
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to CHAIR COMPUTER with replacement of following items (components) with new material and labour complete and all as specified (FD/E6/MAP/01):-
Removing existing u/s seat foam and tapestry cloth and S & F new seat with the provision of plywood commercial 12mm, foam 3" and tapestry cloth not less than 350/- mtr all as per drg
Back with the new foam 2" and tapestry cloth (not less than 350/- mtr)
PVC moulded back frame with screws and PVC lipping
Hydraulic system (as per sample)
Castor wheel (as per sample)
PVC hand rest (as per sample)
Repair to table dinning ORs aluminum top with replacement of following items (components) with new material and labour complete and all as specified ( FD-165 ):-
Top made out of 18mm thick BWR plywood commercial covered with 0.88 mm thick aluminium sheet with 5” over lapping with s/s screws
MS square 25mm 16 gauge in frame including stiffener duly welded.
M&L for welding upto 2.5mm long welding to steel frame with electric welding and smoothing the welding portion, scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to chair steel tubular with arms with replacement of following items (components) with new material and labour complete and all as specified ( FD-75 ):-
Seat made out of sheesham wood duly polished and canned with 2mm wide cane, (fixed with nuts and bolts) including welding MS flat 25 x 3mm 02 Nos (front & back) beneath the seat
All as per item No 11.01 but back of chair tubular steel with arms.
PVC shoes, PVC Caps
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to Table 3'x3' Steel with replacement of following items (components) with new material and labour complete and all as specified ( FD-1009 ):-
Table top with new top size 3'x3' made out of 18mm thick HDHMR Board(high density high moisture resistance) with glossy matt finish, 6mm thick teak wood beading alround the top duly French polished.
PVC shoes
M&L for scrubbing down all old painted steel surface, preparation of surface and spray painting with two coats of synthetic enamel paint (Olive Green) shade over a coat of metal primer, complete all as specified and directed.
Repair to BOOK CASE STEEL with replacement of following items (components) with new material and labour complete and all as specified ( FD-1028 ):-
Glass shutters made out of 1mm thick MS sheet with glass 3mm thick
CP handles 100mm
Locks brass
Leg made out of 1mm thick MS sheet
M&L for scrubbing down all old painted steel surface, preparation of surface to obtain smooth after denting where required, applying putty etc and spray painting with two coats of synthetic enamel paint (Steel Grey) shade over a coat of metal primer, complete all as specified and directed.
Repair to Chair Writing Steel Cushioned with replacement of following items (components) with new material and labour complete and all as specified ( FD/E6/ MAP/12 ):-
Seat (U foam) covered with tapestry cloth of market rate not less than Rs. 350/- per mtr Make : Sleepwell/Kurlon or equivalent as approved
All as per item 14.01 but Back
Hand rest made of black intergal skin polyurethane reinforced with MS insert
Repair to Desk with replacement of following items (components) with new material and labour complete and all as specified ( FD-107 (M) ):-
Box made out of prelaminated particle board18mm extrerior quality alround 4mm thick TW beading over all, size 1270x530x840mm
MS tube 25mm dia cut and duly welded (as per sample), joint made smooth and applying one coat of red oxide primer.
Rubber bush (as per sample)
All exposed steel surfaces to be painted with two coats of synthetic enamel paint to the required finish after preparation of surface by sand papering, removing of old filth to smooth surface complete all as specified and directed.
Repair to Rack Adjustable 6 Tier with replacement of following items (components) with new material and labour complete and all as specified (FD-1038 ):-
Shelf made out of 1.00mm thick MS sheet
Spray painting with two coats of synthetic enamal paint Olive Green over a coat of metal primer after scrubbing all the old paint preparation of surface & denting where required, applying putty etc. complete all as specified and directed.
Repair to Bed Hard Steel with replacement of following items (components) with new material and labour complete and all as specified ( FD/E6/MAP/8 (R) ):-
Plywood top 12mm thick both side commercial. Make of plywwod: Century Ply /Green ply/Kit ply)
Head board 18mm thick
Foot hoard 18mm thick
Spray painting with two coats of synthetic enamal Black paint over a coat of metal primer after scrubbing all the old paint preparation of surface complete all as specified and directed.
Repair to Charpoy IP Hard Top with replacement of following items (components) with new material and labour complete and all as specified ( FD/MAP-II/01):-
Top 12mm thick BWP Grade IS-710 both side commercial. (Make of plywwod : Century Ply /Green ply/Kit ply)
Spray painting with two coats of synthetic enamal paint Black over a coat of metal primer after scrubbing all the old paint preparation of surface complete all as specified and directed.
FD-19/FD-359/ FD256/FD-19 : Chair Verandha
Removing old worn out cane plastic of chair verandha preparing surfaces by applying sand papering and painting the same with two coats of white syn enamel paint (1st quality over a coat of red oxide primer complete all as all as shown on drgs and as approved by GE.
Recanning of chair verandha prepared under ser No 19.01 above with cane plastic 4mm wide half round white clour canned as per mat pattern complete all as spd and shwn on drg. Cane plastic arms shall not be provided even if shown on drg.
Removing exiting old unsv PVC shoes and Supply and Fixing PVC shoes supirior quality as directed .
Welding to steel conduit pipe of chair verandah uniformly around the broken point/welding of joints where required as by Gas Welding specified and directed .
Replacement of old unserviceable existing legs of chair verandah and replacing with new 'U' type (made to shape all as shown in drg) duly fixed with welding as specified and directed.
Deduct Total amount of SCH 'A' SECTION-II (SCH OF CREDIT) Rs 43,985.50 (to be deducted from Schedule ‘A’ (BOQ) to arrive at the Contract Sum)
vivek and co
M/S Ajay Saini
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .