Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | 1 | Accepted-AOC Ok | |
| 2 | 2₹5.4 L+₹27,329 (5.31%)Rejected-Finance | 2 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | SRI SOUNTHARI TRADERS AND BUILDERS L2 | R Saravanan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton soil, hard red, earth mixed with 50% fair sized boulders and hard gravelly soil and depositing on bank with initialed and lift as per SS 20A inclusive of shoring strutting waling and bailing out water where ever necessary forming protective bunds, coffer dams and including refilling charges around and all other incidental charges etc., complete complying with standard specification for foundation SS. No. 23 SSRB. | 99 | m3 | 190 ₹18,810 | 184 ₹18,216 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labors etc complete. | 16 | m3 | 5,800 ₹92,800 | 5,725 ₹91,600 Lowest |
| 3.00 | Centering for sides and soffiots including necessary supports and strutting as directed by the departmetal officers. Rate for 10m2 for the following items (RCC floor slab, Rectangular/ Square, Tee/ Ell beams. Lintels. | 247 | m2 | 560 ₹1,38,320 | 459.5 ₹1,13,496.5 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (One part cement, Two part sand and four part of aggregate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | 34 | m3 | 7,100 ₹2,41,400 | 7,099 ₹2,41,366 Lowest |
| 5.00 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications | 200 | Kg | 90 ₹18,000 | 88.5 ₹17,700 Lowest |
| 6.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site. | 2.5 | m3 | 8,710 ₹21,775 | 8,703 ₹21,757.5 Lowest |
| 7.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 60 | m2 | 180 ₹10,800 | 174 ₹10,440 Lowest |
Tender Value
₹6.3 L
EMD Value
₹6,300
Closing Date
14 Aug 2025, 3:00 pmClosed
Executive Officer, Ananthapuram Town Panchayat
Office of the Town Panchayat, Ananthapuarm
Construction of Drain With Culvert
2025_DTP_590931_1
104/2025-3
Open Tender
Civil Works
Works
Ananthapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,300
Yes
25 Aug 2025
9 Aug 2025
14 Aug 2025
9 Aug 2025
14 Aug 2025
9 Aug 2025
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton soil, hard red, earth mixed with 50% fair sized boulders and hard gravelly soil and depositing on bank with initialed and lift as per SS 20A inclusive of shoring strutting waling and bailing out water where ever necessary forming protective bunds, coffer dams and including refilling charges around and all other incidental charges etc., complete complying with standard specification for foundation SS. No. 23 SSRB.
Plain Cement Concrete 1:4:8 mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labors etc complete.
Centering for sides and soffiots including necessary supports and strutting as directed by the departmetal officers. Rate for 10m2 for the following items (RCC floor slab, Rectangular/ Square, Tee/ Ell beams. Lintels.
Plain Cement Concrete 1:2:4 Mix (One part cement, Two part sand and four part of aggregate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.
Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
SRI SOUNTHARI TRADERS AND BUILDERS (BID ID -1429380)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .