| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC | L1 | Accepted-AOC Admitted being L1 | |
| 2 | L2₹43.8 L+₹2.5 L (6.09%)Rejected-Finance FLAT NO 201 GREEN VALLEY CHS PLOT NO 26 SECTOR 19 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance Not admitted being L2 | |
| 3 | L3₹44.3 L+₹3.0 L (7.35%)Rejected-Finance | L3 | Rejected-Finance Not admitted being L3 | |
| 4 | L4₹46.7 L+₹5.5 L (13.2%)Rejected-Finance 0001D ATM HOUSE AIR FORCE NEENA THAPA GORAKHPUR UTTAR PRADESH 273008 UDYAM UP 32 0054752 | GORAKHPUR | UTTAR PRADESH | 273008 | L4 | Rejected-Finance Not admitted being L4 | |
| 5 | L5₹47.1 L+₹5.8 L (14.1%)Rejected-Finance 1501 BHAGWATI EMINENCE SAVITRIBAI PHULE MARG BESIDES R R PATIL GARDEN SECTION 13 NERUL E NAVI MUMBAI | RAIGAD | MAHARASHTRA | 400702 | L5 | Rejected-Finance Not admitted being L5 |
| Sl No | Description | Qty | Unit | M.K Enterprises L2 | Nexus Infratech L3 | SREE HARITHA ASSOCIATES L5 | R A Electric Co. L1 | M/S Royal Enterprises L7 | BALAJI TRADERS L6 | Om Sai Enterprises L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Exacavation in trenches n etc. 1.5m wide n exc 1.5m depth and getting out in hard / dense soil including trimming bottom surface to require level and slope complete all as directed by Engr-in-Charge.
Note:- Taking up pipe with fitting, special valves etc. from trench shall be measured and paid separately. | 200 | Cum | 229 ₹45,800 Lowest | 493 ₹98,600 | 475 ₹95,000 | 380 ₹76,000 | 550 ₹1,10,000 | 685 ₹1,37,000 | 480 ₹96,000 |
| 2.00 | Returning , filling in including spreading, levelling , watering & well ramming in layers n.exc 25cm including making good disturbed surface to original levels complete all as specified and directed | 190 | Cum | 109 ₹20,710 | 100 ₹19,000 | 80 ₹15,200 | 60 ₹11,400 Lowest | 150 ₹28,500 | 135 ₹25,650 | 75 ₹14,250 |
| 3.00 | Removal of exacavation material to a distance n exc 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed | 10 | Cum | 139 ₹1,390 | 100 ₹1,000 | 275 ₹2,750 | 70 ₹700 Lowest | 330 ₹3,300 | 315 ₹3,150 | 295 ₹2,950 |
| 4.00 | Deploying labour with tools for removing grass, shrubs, trimming branches of trees in water supply installation and water reservoir and shifting of debris to a distance of 50 mtr away from site complete all as directed by Engineer -in-Charge | 450 | Sqm | 9 ₹4,050 | 7 ₹3,150 | 4 ₹1,800 Lowest | 10 ₹4,500 | 10 ₹4,500 | 12 ₹5,400 | 5 ₹2,250 |
| 5.00 | Taking out cast iron / ductile iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead for the following size of pipes:-
Note :- Excavation and earth work required shall be measured and paid separately under relevant items.
(a). 200mm bore | 20 | RM | 79 ₹1,580 | 72 ₹1,440 | 85 ₹1,700 | 60 ₹1,200 Lowest | 110 ₹2,200 | 125 ₹2,500 | 90 ₹1,800 |
| 5.01 | (b) 150 mm bore | 200 | RM | 69 ₹13,800 | 68 ₹13,600 | 80 ₹16,000 | 50 ₹10,000 Lowest | 100 ₹20,000 | 95 ₹19,000 | 75 ₹15,000 |
| 5.02 | (c) 100 mm bore | 350 | RM | 59 ₹20,650 | 56 ₹19,600 | 72 ₹25,200 | 40 ₹14,000 Lowest | 85 ₹29,750 | 70 ₹24,500 | 70 ₹24,500 |
| 6.00 | Supply, laying, jointing & testing DI-K9 class with spigot, socket or flanged, suitable for Push on rubber joint / fanged joint with internal cement mortor lining, and external zinc and black bitumen coated pipes in any lengths conforming to IS:8329-2000 including Rubber Gasket & joints as per IS:9523-2000 laid in trenches/ Road/ Ducts/ Footpath / on wall/ on floor locations complete all as specified and directed by Engr-in Charge for the following sizes of pipes:-
(a). 200mm bore | 20 | RM | 4,999 ₹99,980 | 4,802 ₹96,040 | 5,400 ₹1,08,000 | 3,345 ₹66,900 Lowest | 5,614 ₹1,12,280 | 5,650 ₹1,13,000 | 5,450 ₹1,09,000 |
| 6.01 | (b) 150 mm bore | 200 | RM | 3,999 ₹7,99,800 | 4,104 ₹8,20,800 | 4,250 ₹8,50,000 | 2,650 ₹5,30,000 Lowest | 4,375 ₹8,75,000 | 4,350 ₹8,70,000 | 4,275 ₹8,55,000 |
| 6.02 | (c) 100 mm bore | 350 | RM | 2,499 ₹8,74,650 | 2,500 ₹8,75,000 | 3,350 ₹11,72,500 | 1,855 ₹6,49,250 Lowest | 3,490 ₹12,21,500 | 3,450 ₹12,07,500 | 3,375 ₹11,81,250 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
30 May 2026, 6:00 pmClosed
GE NW KARANJA
NAVAL STATION KARANJA, URAN, RAIGAD, MAHARASHTRA
REPAIR /REPLACEMENT AND IMPROVEMENT OF EXISTING WATER SUPPLY DISTRIBUTION SYSTEAM REPLACEMENT OF OLD CI / DI / PIPE LINE AND OTHER CONNECTED ITEMS INCLUDING CLEANING OF UG SUMPS OHT AND SERVICE TANK AT CHUNABHATTI AREA RMSFF MORA GATE CHUKAR SQN
2026_MES_764335_1
8293/E8
Open Tender
Civil Works
Item Rate
180 days
GE NW KARANJA
Class D and above and category a (ii)
8 documents required · 8 mandatory
₹500
Yes
GE NW KARANJA
₹90,000
Yes
28 Jul 2026
8 May 2026
1 Jun 2026
8 May 2026
30 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Exacavation in trenches n etc. 1.5m wide n exc 1.5m depth and getting out in hard / dense soil including trimming bottom surface to require level and slope complete all as directed by Engr-in-Charge.
Note:- Taking up pipe with fitting, special valves etc. from trench shall be measured and paid separately. | 200 | Cum | - | - |
| - | Returning , filling in including spreading, levelling , watering & well ramming in layers n.exc 25cm including making good disturbed surface to original levels complete all as specified and directed | 190 | Cum | - | - |
| - | Removal of exacavation material to a distance n exc 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed | 10 | Cum | - | - |
| - | Deploying labour with tools for removing grass, shrubs, trimming branches of trees in water supply installation and water reservoir and shifting of debris to a distance of 50 mtr away from site complete all as directed by Engineer -in-Charge | 450 | Sqm | - | - |
| - | Taking out cast iron / ductile iron water mains (including all fittings) with spigot and socket ends and lead joints including burning out joints and recovering lead for the following size of pipes:-
Note :- Excavation and earth work required shall be measured and paid separately under relevant items.
(a). 200mm bore | 20 | RM | - | - |
| 5.01 | (b) 150 mm bore | 200 | RM | - | - |
| 5.02 | (c) 100 mm bore | 350 | RM | - | - |
| 6 | Supply, laying, jointing & testing DI-K9 class with spigot, socket and flanged, suitable for Push on rubber joint / fanged joint with internal cement mortor lining, and external zinc and black bitumen coated pipes in any lengths conforming to IS:8329-2000 including Rubber Gasket & joints as per IS:9523-2000 laid in trenches/ Road/ Ducts/ Footpath / on wall/ on floor locations complete all as specified and directed by Engr-in Charge for the following sizes of pipes:-
(a). 200mm bore | 20 | RM | - | - |
| 6.01 | (b) 150 mm bore | 200 | RM | - | - |
| 6.02 | (c) 100 mm bore | 350 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
8293TenderDocs.pdf
Tender Documents • 1.10 MB
BOQ_856099.xls
BOQ • 0.31 MB
amendmentboq8293.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .