Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹54.6 LAccepted-AOC AT PO PANASPADA DIST BALESWAR PIN 757055 | PANASPADA | BALESWAR | ODISHA | 757055 | ₹54.6 L | 1 | Accepted-AOC successful tenderer |
| 2 | 1₹54.6 LRejected-AOC W NO 26 PO BHANJPUR DIST MAYURBHANJ PIN 757002 | BHANJPUR | MAYURBHANJ | ODISHA | 757002 | ₹54.6 L | 1 | Rejected-AOC unsuccessful tenderer |
| 3 | 1₹54.6 LRejected-AOC AT PAIKAPADA PO KOCHILAKHUNTA PS BADSAHI DIST MAYURBHANJ ODISHA 757025 | BADASAHI | MAYURBHANJ | ODISHA | 757025 | ₹54.6 L | 1 | Rejected-AOC unsuccessful tenderer |
| 4 | 1₹54.6 LRejected-AOC BARIPADA MAYURBHANJ ODISHA | ₹54.6 L | 1 | Rejected-AOC unsuccessful tenderer |
| 5 | 1₹54.6 LRejected-AOC AT WARD NO 6 PO BARIPADA DIST MAYURBHANJ PIN 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | ₹54.6 L | 1 | Rejected-AOC unsuccessful tenderer |
Tender Value
₹54.6 L
EMD Value
₹54,620
Closing Date
17 Feb 2026, 5:00 pmClosed
S.E.R.W.Division, Baripada
S.E.R.W.Division, Baripada
Construction of R.W. Sub-Division office Building at Rasgovindpur.
2026_CERWI_125864_4
17(Online)/RWD/BPD/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹54,620
Yes
7 Sept 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
11 Feb 2026 - 17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil | - | - | - | - |
| 2 | Earth work in excavation of foundation in hard soil with all leads and lifts and to required depth including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge. | 166.51 | 1 Cum | 276.9 | ₹46,106.62 |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost & conveyance of materials, labour ,T&P, royalty & taxes etc.complete as per direction of the Engineer-in-charge. | 189.89 | 1 Cum | 955.9 | ₹1,81,515.85 |
| 4 | Providing P.C.C. (1:3:6) with 4cm size h.g. metal of approved quality in foundation / floor including hoisting laying concrete, cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. | 63.25 | 1 Cum | 7,075.4 | ₹4,47,519.05 |
| 5 | Providing and laying P.C.C. (1:2:4) with 12mm size H.G. chips of approved quality from approved quarry including hoisting laying concrete with cost conveyance & materials royalty, taxes, labour, T&P, curing etc complete as per direction of the Engineer-in-charge. | 8.73 | 1 Cum | 9,120.5 | ₹79,621.97 |
| 6 | Providing R.C.C. M-25 grade using 20mm size h.g. chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour, royalty, taxes, curing but excluding cost of reinforcement etc.complete as per direction of the Engineer-in-charge. | - | - | - | - |
| 7 | a) RCC in Foundation | 17.67 | 1 Cum | 8,071.4 | ₹1,42,621.64 |
| 8 | b) RCC in Plinth beam | 13.17 | 1 Cum | 8,946.3 | ₹1,17,822.77 |
| 9 | c) RCC in Column, beam | 12.14 | 1 Cum | 17,365.7 | ₹2,10,819.6 |
| 10 | d) RCC in Lintel | 1.95 | 1 Cum | 15,780.2 | ₹30,771.39 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_580744.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .