| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L Quoted ₹5.2 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹5.2 LRejected-AOC | ₹5.2 L | L2 | Rejected-AOC L-2 |
| 3 | L3₹5.3 LRejected-AOC P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹5.3 L | L3 | Rejected-AOC L-3 |
Updated dates
Tender Value
₹4.9 L
EMD Value
₹4,916
Closing Date
31 Dec 2025, 2:30 pmClosed
Sr.Xen
(Er.Rahul Puri) Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
Tender for prov. 11 KV HT line to Proposed 11/0.4 KV 100 KVA substation for SOP to 76 KW load to the Medical Officer Incharge CHC Bhadsali under ESD HPSEBL, Khad.T.S No.97/2024-25 Bid No. HED-271/2025-26 Ch. To. Deposit Work.
2025_HPSEB_123770_1
NO/HED-271/2025-26
Open Tender
Electrical Works
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,916
13 Feb 2026
17 Dec 2025
31 Dec 2025
18 Dec 2025
31 Dec 2025
18 Dec 2025
Erection Part of 11/0.4 KV, 100 KVA Transformer
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer)
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
Erection Part of 11 KV HT Line
Stringing and sagging conductor:- Laying of conductor ACSR 7/3.81 (80 mm2) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Erection of GO switch complete in all respect.
Erection of DO Fuse complete in all respect.
Supply Part of 11/0.4 KV, 100 KVA Transformer
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
Prov. RCC Muffs
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Supply Part of 11 KV HT Line
Prov. ACSR 7/3.81 (80 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
Prov.G.I.Wire No. 8 SWG in mtr.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_181818.xls
BOQ • 0.69 MB
termandcondition.pdf
Tender Documents • 0.90 MB
additionaltermandcondition.pdf
Additional Documents • 0.58 MB
Download all tender documents and submit your bid