Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -52.37% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹19.5 L (17.8%)Admitted-Finance | -43.90% | ₹1.3 Cr+₹19.5 L (17.8%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹39.2 L (35.8%)Admitted-Finance | -35.31% | ₹1.5 Cr+₹39.2 L (35.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹53.8 L (49.1%)Admitted-Finance | -28.99% | ₹1.6 Cr+₹53.8 L (49.1%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹86.0 L (78.5%)Admitted-Finance | -15.00% | ₹2.0 Cr+₹86.0 L (78.5%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.6 L
Closing Date
14 Aug 2026, 5:00 pmClosed
Superintending Engineer PMGSY Circle Batote
Superintending Engineer PMGSY Circle Batote
Pls refer to the e-nit fro description
2026_JKRRD_148869_3
E-NIT NO. PMGSY/SE/B/21 of 2026-27 dated 01-08-2026
Open Tender
Civil Works - Roads
Percentage
180 days
Superintending Engineer PMGSY Circle Batote
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹4.6 L
Superintending Engineer PMGSY Circle Batote
5 Sept 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
14 Aug 2026
3 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | - | - | - | - |
| 0.0 | All kinds of soil | 3,011.12 | Cum | 256.85 | ₹7,73,406.17 |
| 0.9 | Ordinary Rock. | 220.73 | Cum | 493.5 | ₹1,08,930.25 |
| 0.0 | Slip Clearance: In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 5,665.99 | Cum | 331.15 | ₹18,76,292.59 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | - | - | - | - |
| 0.0 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 76.14 | Cum | 4,826.5 | ₹3,67,489.71 |
| 0.0 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 531.03 | Cum | 5,733.6 | ₹30,44,713.61 |
| 0.9 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.52 | Cum | 6,591.25 | ₹62,748.7 |
| 0.9 | 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 22.8 | Cum | 7,788.4 | ₹1,77,575.52 |
| 0.0 | RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 1,213.14 | Cum | 5,402.9 | ₹65,54,474.11 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.64 MB
BOQ_234155.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .