Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.6 LAccepted-AOC MANGARPATTA PARTANGA CHURCHU HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | 1 | Accepted-AOC LOWER BID | |
| 2 | 2₹23.6 L+₹38.69 (<0.01%)Rejected-Finance MAHUADANGAL DUMKA JHARKHAND 814101 | DUMKA | DUMKA | JHARKHAND | 814101 | 2 | Rejected-Finance higher bid |
Tender Value
₹23.6 L
EMD Value
₹48,000
Closing Date
30 Sept 2024, 3:00 pmClosed
Executive Engineer, BCD
Office of the Executive Engineer, Building Construction Department, Building Division,Hazaribag
Construction of PCC Road from village Khurandi home from arun mehta to Narayan Yadav,Jogender yadav,Dhaneswer yadav Block-Churchu Dist- Hazaribag
2024_BCD_93827_1
BCD/EE/HAZARIBAG/ 23/01 /2024-25
Open Tender
Civil Works
Item Rate
90 days
Hazaribag
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹48,000
22 Jan 2025
24 Sept 2024
1 Oct 2024
24 Sept 2024
30 Sept 2024
24 Sept 2024
Amount
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume)
Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)
Providing designation 75A one brick on edge soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete
Carrage of Materials (A) Sand Avg. Lead 5 km
(D) Bricks Avg. Lead 15 km
(B) Chips Avg. Lead 15 km
Add GST 18 %
Add L.Cess 1 %
JAY PRAKASH SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .