| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.9 LAccepted-AOC BHADOHI | UTTAR PRADESH | 221301 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹33.6 L+₹1.7 L (5.24%)Rejected-Finance GRAM PO NAKHERA DISTRICT MIRZAPUR | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹39.0 L+₹7.1 L (22.3%)Rejected-Finance SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L-3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 0 AHAMADPUR AHAMADPUR AHAMADPUR JAUNPUR UTTAR PRADESH 222180 | JAUNPUR | UTTAR PRADESH | 222180 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RAM KUMAR MAURYA S/O DASHANAND MAURYA L2 | M/S KRISHNA CONSTRUCTION L1 | MS SHREYA CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil/sandy loam or sand including all lift upto 1.5 m and lead upto 30.00 m, with proper completion and disposal including dewatering if required. | 515.04 | M3 | 80 ₹41,203.2 | 79 ₹40,688.16 Lowest | 95 ₹48,928.8 |
| 2.00 | Earth work in embankment in foundation with hard soil mixed with boulder including all lead and lift ,labour charges, T&P etc. required and its disposal as per direction of Engineer-in-charge. | 1,864.01 | M3 | 180 ₹3,35,522.16 Lowest | 204.16 ₹3,80,556.69 | 250 ₹4,66,003 |
| 3.00 | Supplying and Laying of 200 micron thick LDPE film including cost of all materials, labour, T&P, etc. required for proper completion of work. | 320 | M² | 35 ₹11,200 | 30.2 ₹9,664 Lowest | 35 ₹11,200 |
| 4.00 | Centering and shuttering for concrete work Required for proper completion of work. | 87.71 | M2 | 150 ₹13,156.5 Lowest | 175.5 ₹15,393.11 | 215 ₹18,857.65 |
| 5.00 | Providing and Laying P.C.C. 1:3:6 (M-10) in foundation with cement, coarse sand of F.M. more than 2.00 and hard stone Ballast size 20 mm to 40 mm including cost of material, labour, T&P etc. required for proper completion of work. | 64.13 | M3 | 3,800 ₹2,43,694 Lowest | 3,833 ₹2,45,810.29 | 4,600 ₹2,94,998 |
| 6.00 | C.R. cut stone (khanda) 200x200x200 mm masonary including, cost of all material labour T&P etc. Including all lead and lift for proper completion of work. | 581.59 | M3 | 3,700 ₹21,51,883 | 3,358 ₹19,52,979.22 Lowest | 4,100 ₹23,84,519 |
| 7.00 | Providing and Laying cement concrete 1:1.5:3 (M-20) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 51 | M3 | 6,000 ₹3,06,000 | 5,608.7 ₹2,86,043.7 Lowest | 6,900 ₹3,51,900 |
| 8.00 | Providing and Laying cement concrete 1:2:4 (M-15) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 4.5 | M3 | 6,000 ₹27,000 | 5,325.3 ₹23,963.85 Lowest | 6,700 ₹30,150 |
| 9.00 | Deep struck pointing in 1:2 cement on stone with coarse sand including cost of material, labour and T&P etc complete. | 801.87 | M2 | 100 ₹80,187 Lowest | 108.95 ₹87,363.74 | 132 ₹1,05,846.84 |
| 10.00 | Providing and laying Dry stone boulder/laying boulder in slope including all cost of material labour T&P etc., lead and lift Complete. | 125 | M3 | 1,200 ₹1,50,000 Lowest | 1,200 ₹1,50,000 Lowest | 1,530 ₹1,91,250 |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
22 Jul 2026, 1:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Chanelisation and lining works from Km. 0.000 to Km. 0.100 of Scape at Km. 40.055 of Meja Jirgo Link Channel.
2026_UPIDC_1165786_8
02/SE/2026-27
Open Tender
Civil Works
Item Rate
210 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹82,000
19 Sept 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil/sandy loam or sand including all lift upto 1.5 m and lead upto 30.00 m, with proper completion and disposal including dewatering if required. | 515.04 | M3 | - | - |
| 2 | Earth work in embankment in foundation with hard soil mixed with boulder including all lead and lift ,labour charges, T&P etc. required and its disposal as per direction of Engineer-in-charge. | 1,864.01 | M3 | - | - |
| 3 | Supplying and Laying of 200 micron thick LDPE film including cost of all materials, labour, T&P, etc. required for proper completion of work. | 320 | M² | - | - |
| 4 | Centering and shuttering for concrete work Required for proper completion of work. | 87.71 | M2 | - | - |
| 5 | Providing and Laying P.C.C. 1:3:6 (M-10) in foundation with cement, coarse sand of F.M. more than 2.00 and hard stone Ballast size 20 mm to 40 mm including cost of material, labour, T&P etc. required for proper completion of work. | 64.13 | M3 | - | - |
| 6 | C.R. cut stone (khanda) 200x200x200 mm masonary including, cost of all material labour T&P etc. Including all lead and lift for proper completion of work. | 581.59 | M3 | - | - |
| 7 | Providing and Laying cement concrete 1:1.5:3 (M-20) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 51 | M3 | - | - |
| 8 | Providing and Laying cement concrete 1:2:4 (M-15) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 4.5 | M3 | - | - |
| 9 | Deep struck pointing in 1:2 cement on stone with coarse sand including cost of material, labour and T&P etc complete. | 801.87 | M2 | - | - |
| 10 | Providing and laying Dry stone boulder/laying boulder in slope including all cost of material labour T&P etc., lead and lift Complete. | 125 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tender_Document_02_SE_2026-27_Lot_6.pdf
Tender Documents • 4.34 MB
BOQ_2194451.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .