Loading…
Loading…
Tender Value
₹2.4 L
EMD Value
₹4,740
Closing Date
27 Jul 2026, 6:00 pm
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_314740_10
e-NIT No. 31 of 2026-27 Dated 06-07-2026
Open Tender
Civil Works
30 days
Akhnoor
NIT
2 documents required · 2 mandatory
₹600
XEN PWd Akhnoor
₹4,740
7 Jul 2026
7 Jul 2026
28 Jul 2026
7 Jul 2026
27 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundation,drains, pipes, cables etc(not exceeding 1.5 mt in width)and for shafts,wells cesspits and the like not exceeding 10sqm on plan depth up to 1.5mt including disposal of excavated earth up to 1 mt from cutting edge disposed earth to be levelled and neatly dressed in. All kind of soil. | 3.91 | Cum | 479.3 | ₹1,874.06 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.26 | Cum | 4,826.5 | ₹6,081.39 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5 | Cum | 5,733.6 | ₹28,668 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.09 | Cum | 9,821.85 | ₹10,705.82 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 81.75 | kg | 123.2 | ₹10,071.6 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) & Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 5.04 | Cum | 7,571.75 | ₹38,161.62 |
| 7 | Extra for brick work in superstructure above plinth level upto floor V level. (By manual means) (Including all lead ,lift and ) | 5.04 | cum | 1,455.65 | ₹7,336.48 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. | 20.18 | Sqm | 286.35 | ₹5,778.54 |
| 9 | Centring and shuttering including strutting , propping etc. and removal of form work for Suspended floors, roofs, landing, balconies and access plate form | 6.47 | Sqm | 718.2 | ₹4,646.75 |
| 10 | Centring and Shuttering including strutting, propping etc and removal of form work for Edges of Slabs and Break in floors and walls (Under 20 cms wide) | 11.81 | Mtr | 262.2 | ₹3,096.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1019437.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid