Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC 67 PRABHAT CENTER SECTOR 06 CBD BELAPUR NAVI MUMBAI 400 614 | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.5 Cr+₹8.7 L (1.96%)Rejected-AOC 137 GREATER AKASH COLONY IZZATNAGAR BAREILLY UTTAR PRADESH 243122 | BAREILLY | UTTAR PRADESH | 243122 | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.6 Cr+₹14.8 L (3.35%)Rejected-AOC BADLAPUR | BADLAPUR | MAHARASHTRA | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical PUNE | PUNE | PUNE | MAHARASHTRA | - | Rejected-Technical Not Eligible |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
28 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer ElectProj
For further details regarding the above, contact Executive Engineer ELECTAP, CIDCO Ltd., 8th floor, Raigad Bhavan, CBDBelapur, Navi Mumbai . Tel. No.02267121069.
Repairs and Comprehensive Maintenance of all Electrical/ Mechanical Installations at WTP Jite for the period of Three Years
2020_CIDCO_610250_1
CANo03/CIDCO/EEELECTAP/2020-21
Open Tender
Civil Works
Lump-sum
1095 days
CIDCO Ltd
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
via Payment Gateway
₹3.6 L
Yes
3 May 2021
21 Sept 2020
3 Nov 2020
21 Sept 2020
28 Oct 2020
21 Sept 2020
120 days
Amount
Schedule "A"
Repairs & Comprehensive maintenance of Electrical / mechanical installation provided at Water Treatment Plant, Jite. Before quoting of the Tender the agency has to verify the installations at site by their own. The agency has to take over the installations as is where is basis. After taking over the installations, the agency has to carry out the repairs of all non working installations by replacing / repairing as per the site requirement within 2 months from issue of work order. The necessary penalty clause will be applicable to the agency on completion of initial repairing period of 2 Months. The scope of work involve are as under: - 1) Supply, Erection, Testing & Commissioning of electrical / mechanical accessories for restoration of non working equipments. 2) Providing minimum skilled and experienced Manpower by fulfilling the required minimum wages to the deputed manpower to carry out entire works for day to day Repairs & Comprehensive maintenance of Electromechanical equipments. The minimum manpower to be deputed - 16 Nos. are as under:- Site Senior Engineer - 1 No., Supervisor-1No., Fitter / Mechanic-4 No. , Electricians-5Nos., Helpers-4Nos. Office Support staff (Computer Operator) - 1 No. 3) Progress report to be submitted by the agency after every 15 days regarding repairs & comprehensive maintenance work to be carried out, status of all electro mechanical installations and preventive maintenance work to be carried out at site. 4) Ensuring the continuous healthy uninterrupted Power Supply at all time to the installations in co-ordination with MSEDCL. 5) The required instrument to be available at site to find out and to resolve the fault occurred at site time to time. 6) Ensuring proper termination of cables, earthing connections, panels, starters & pump alignment etc. periodically. 7) Ensuring proper watch & ward for preventing and theft of electrical mechanical installations including substations power supply. In case of accurance of theft, FIR to be lodge by the agency and replacing the theft material immediately for proper operation of pumping station equipments and follow up by the agency with concern Insurance company for theft claim. 8) Co-ordination with various departments to carry out the repairs and comprehensive maintenance time to time. 9) Co-ordination with the concern department to ensure timely payment of energy bills. Delay payment charges of energy bill will be deducted from R.A. bills of agency. 10) The penalty for absence of adequate manpower at site shall be Rs.1000 / person / shift will be recovered from Bills of agency. 11) The penalty for nonworking of major equipments such as clear water pumps, Raw water pumps, MSEDCL substation equipments and absence of power supply the penalty shall be Rs.10,000 / Hour will be recovered from Bills of agency. 12) The penalty for non repairs of breakdown equipments other than major equipments shall be attend by the agency within 48 hours period. If fails the penalty charges Rs.1000 / 6 Hour will be recovered from Bills of agency. 13) Initially the work order will be issued for the period of 12 Months only. After observation of satisfactory performance of agency the work order for the further period of consecutive 12 months will be issued to the agency.
HI-TECH ENGINEERS
FRIENDS ENGINEERING CORPORATION
techsummary_1055909.pdf
PDF • 0.58 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_1055909.pdf
PDF • 0.44 MB
610250.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .