Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BUILDING NO 69 30 BAJANAI KOIL STREET VADAPALANI CHENNAI 600 026 | CHENNAI | CHENNAI | TAMIL NADU | 600026 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance M 7 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹43,200
Closing Date
23 Sept 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram
VGTPS PHASE II MECHANICAL Periodical and breakdown maintenance of GTG and GBC, IA/PA and ACC, HRSG, STG, DM Plant, Fire and safety, 60TR Centralized AC Unit and its auxiliaries
2021_EB_210108_1
SE/VGTPS/RMD/WC/NO.35/2021-22
Open Tender
Miscellaneous Works
Works
30 days
SE VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,200
Yes
24 Sept 2021
9 Sept 2021
24 Sept 2021
9 Sept 2021
23 Sept 2021
9 Sept 2021
180 days
Amount
GAS TURBINE
Periodical Maintenance
Gas Booster Compressors and its accessories: Charges for Periodical inspection of the Gas Booster Compressor gas, air, oil and water piping system for leaks and general checks for proper functioning of the system and attending the corrective action as per the direction of engineer in-charge, up keeping of the Twin oil Coolers, Duplex Filter housings, LP and HP compressor, gearbox, lube oil pumps, 6 Nos of Gas Cooler (ACHE) by thorough external cleaning and keeping the floor, platform of the houses clean and tidy. Checking the oil level and topping up of the lube oil using centrifuge as required and its connected pipe lines for any leakages, greasing of the suction, discharge and anti surge valves of the gas lines and attending any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in-charge
Gas conditioning skid: Charges for Periodical inspection of the Gas conditioning skid, gas leaks and general checks for the proper functioning of the system and attending the minor corrective action as per the direction of Engineer-in-charge in the Gas conditioning skid and the Gas drain collection tank. Up keeping of the Gas conditioning skid and the Gas drain collection tank by thorough external cleaning and keeping the system clean and tidy. Draining of condensates from the scrubber, various locations in the conditioning skid and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer-in-charge
Gas Turbine (58.5 MW), GT Accessories like Lube oil skid, Gas skid, Mist Eliminator & Exhaust system of Gas Turbine: Charges for Periodical inspection of Gas Turbine for any abnormal sound and temperature and visual inspection of gas, water, air and lube oil piping system for leaks, leaky gaskets, pump and valve packing leaks, vibration of piping and general checks and attending the corrective action required as per the direction of the Engineer in-charge. In GT Accessories Module (Lube oil skid and Gas skid) inspecting the Pumps system for piping connection for any loose hardware, accumulator system pipe line, hydraulic manifolds leakage checking and attending the leaks, Checking the lube oil tank level and topping up the lube oil with centrifuge. Also includes transporting the lube oil and up keeping the lube oil pump system, lube oil filters housing and lube oil heat exchanger housing and the hydraulic oil pumps and its system, thorough external cleaning, (refer tender spec)
Inlet Air filter house and Evaporative cooling system: Charges for Periodical inspection of Inlet Air Filter House system and Evaporative cooling system of GT inlet air for any abnormal sound, evaporative cooler pump strainer cleaning, replacing the filter cartridge on the air filter house as required as per the direction of Engineer in-charge. Checking & attending minor air leak in the filter house and attending any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in-charge
Gas Turbine Ventilation fans, Blowers, Cooling and Sealing air fans: Charges for Periodical inspection of Gas Turbine Ventilation fans,Blowers,Cooling and Sealing air fans by thorough cleaning of the fan casings and the dampers, greasing the damper’s and check for free operation of the standby dampers, Checking the tightness of bed bolts of all the above fans, Inspecting and up keeping of all cooling sealing air fans for proper functioning as per the direction of Engineer in-charge and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in-charge
Operational Assistance for routine changeover of equipments: Charges for providing operation assistance during changeover of GT auxiliaries such as Gas Turbine compartment cooling fans, Exhaust frame air blower, gas skid cooling fans, load compartment cooling fans, DD seal air fan & GD seal air fan, checking of damper operation, vibration checks and attending any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in - charge
Breakdown Maintenance
Seal air fans of Diverter damper, Guillotine damper : Dismantling the outer cover and gasket. Disconnecting the fan from motor shaft and cleaning of fan housing. Dismantling the NRV, inspecting for any damage Reassembling the fan on motor shaft and closing the cover with new gasket in place. Removal of bearings of NRV flap, inspecting them for healthiness and replacing if necessary. (Bearings will be supplied by the Board) Packing grease and reassembling the NRV & normalizing as directed by the Engineer in-charge
GT Guillotine / Diverter damper inspection work: This work involves GT Guillotine damper manhole door and Diverter damper manhole door open and visual inspection and manhole door closing work and manual opening and closing of GD & DD as per the direction of Engineer – in - charge
GT Diverter Damper / Guillotene damper Manual operation during failure of Auto operation: Manual operation of Diverter Damper by enabling local mode & engaging the clutch lever & applying enormous man power to rotate the manual hand lever to facilitate open / close of Diverter Damper / Guillotene damper in case of failure of auto operation of Diverter Damper / Guillotene damper as per the direction of engineer-in-charge
Mist Eliminator: Break down maintenance of mist eliminator work comprises of dismantling of mist eliminator fan from motor shaft by using appropriate tools carefully, after the removal of fan cover and assessment of fan surfaces for any damage or loss of material, complete cleaning of blade surfaces with petrol, diesel reassembling the fan blade with motor shaft, commissioning the mist eliminator and normalizing as per the direction of engineer-in-charge
GBC Valves: Break down maintenance of GBC suction valve / Discharge / Seal gas valve / Anti surge valve by dismantling the top casing, inspection of worm shaft, worm gear, gear wheel for any damages, attending minor rectification works, replacement of bearings if necessary grease packing, inspection of Diaphragm for any damages & replacement of diaphragm, if necessary, reassembling the gear wheel, worm gear, worm shaft and ensuring free operation of valve, attending gas leak in valve, if any as per the direction of engineer-in-charge
water wash skid: Attending Break down maintenance in GT water wash skid by attending water leak in water wash tank by welding, inspection of suction/discharge valves for proper function & replacement / reconditioning of valve if necessary (or) decoupling the water wash pump from motor after isolating the suction & discharge line & disassembly of the pump, checking the bearings & seals of the pump and replace the failed bearings & seals by new one, replace the parts if any as required which will be supplied by the board & reassembling the pump, Alignment checking & coupling with the motor all complete & normalizing as per the direction of engineer-in-charge
Minor welding work: Charges for attending any minor weld defects in lube oil, air and water lines and support structures by welding, etc., as per the direction of Engineer in charge
GT & GBC Start-up Assistance: Charges for starup work in Gas Turbine, Gas Booster Compressor and its axillaries, Maintenance assistance to attend water / oil / gas leak and Air vent releasing in Lube Oil Line and Checking for any abnormalities in the system during the startup as per the direction of Engineer-in-charge
Evaporator cooling system Opening the manual door of the evaporator cooling system by unscrewing the lock bolts of the door, remove bracket for media installation, and replace the media bracket complete. Check the distribution pads; drift eliminator assembly for scale formation if any. In case new drift eliminators need to be installed, materials will be supplied by board. Evaporator sump complete cleaning and inspection as per the direction of Engineer – in - charge
Combustion Chamber Inspection work: Gas turbine bottom side outer manhole door opening , Combustion chamber internal doors 3 nos opening and visual inspection of combustion chamber internals like heat shields, burners and 1st stage rotor and stator blades & vanes Visual inspection will be made by the board engineer. After completing the inspection, closing the combustion chamber internal manhole doors 3nos and outer cover door. The spare parts if any as required which will be supplied by the board and complete and normalizing as per the direction of Engineer – in - charge
Pneumatic Air Compressor : Gas turbine blow off valves working under the control of pneumatic air compressor. Opening the outer cover, draining the lube oil completely and dismantling the compressor internals such as air suction valve ,filter coolant, filter separator etc.,. After dismantling the compressor unit from the motor Visual inspection will be made by the board engineer. The spare parts if any as required which will be supplied by the board and complete normalizing as per the direction of Engineer – in - charge
Lube oil Heat Exchanger : GT lube oil heat exchanger emergency break down works comprise of removing the plates from the heat exchanger after isolating the standby heat exchanger. checking the Gasket condition and replace the failed gaskets to new one. Complete cleaning of heat exchanger plates both sides. Replace the parts if any as required which will be supplied by the board and reassembling the Heat exchanger, alignment checking and all complete and normalizing as per the direction of Engineer – in - charge
Inlet Guide Vane calibration work: This work involves IGV calibration and IGV control actuator dowel pin & bolts removal and re-fixing with New pin & bolts as per the direction of Engineer – in - charge
GT Flame sensors cleaning work: This work involves 2 Nos GT Flame sensor removal, cleaning and re-fixing the same in the correct position as per the direction of Engineer – in - charge
GT compartment cooling blower fan filter cleaning work : This work involves removal GT Compartment cooling blower fans 2 Nos filters removing and cleaning and re-fixing work as per the direction of Engineer – in - charge
Off line water wash work : This work involves mixing of ZOK-27 detergent with DM water and filling the water wash tank, off line detergent washing and DM water washing with the co ordination of operating personnel during GT shutdown as per the direction of Engineer – in - charge
IA/PA Compressors, ACC, CCCW System
Periodical Maintenance
Instrument Air Compressor System : Charges for Periodical inspection of Instrument Air Compressor systems and its drier units, IA/PA Cooling water system, associated pipe lines, valves etc., for attending air/water/oil leaks, maintaining lube oil level of IA/PA Compressors and its cooling water pumps, topping up if necessary, lubricating of hand operated valves, External pipe valves replacing, Compressor belt Condition Checking,ACW Pump Suction Strainer Cleaning, external cleaning of related equipments and its auxiliaries and keeping clean and tidy and attending any minor defects as per the direction of Engineer - in -charge
Process Air & Nitrogen generation System : Charges for Periodical inspection of Process Air system, Nitrogen generation system, Nitrogen storage tank , Inspection & associated pipe lines, valves etc., attending gas leaks, maintaining Carbon molecular sieves level of PSA system, topped up if necessary, external cleaning of related equipments and its auxiliaries and keeping clean & tidy and attending any minor defects as per the direction of Engineer - in -charge
Closed Circuit Cooling Water System(CCCW): Charges for Periodical inspection of Closed Cooling Water Pumps (CCCW) for any abnormal sound, temperature, and mechanical seal / Gland leaks, Gland rope packing, Gland Plate Changing, any water leaks in the pipe lines, attending valve leak, Expansion rubber bellow leak,CCCW Pump Suction Strainer cleaning, vibration checking ,general checkings and CCCW PUMP & Motor Coupling fasteners inspection, Checking the expansion tank DM water level, cleaning and attending minor defects and visual inspection of Radiator Cooler (RC) Fan for any abnormal Sound, Vibration, belt visual inspection, Adjusting Belt Tension, Replacing worn out Belt by New belt, Replacing worn-out Motor Pulley, Fan Pulley Cleaning, Replacing worn-out Taper Bush, Belt Coupling &Decoupling from Motor, Fan Bottom Round Guard fasteners Checking, Fins Visual inspection, Grease Packing of RC Fan shaft bearings as required. RC Fan leaf & Bottom supporting plates Cleaning as per the direction of Engineer -in-Charge
Air Cooled Condenser (ACC) system: Charges for Periodical inspection of Air-Cooled Condenser system, including ACC Fans, ACC Gear Boxes, ACC Heat Exchanger Bundles etc, observation for any abnormal sound, temperature, vibration, leaks etc, in the above system, external cleaning of ACC Gear Boxes etc., attending leaks and minor defects in the above system, checking the oil level in all ACC gear boxes and topped up if necessary as per the direction of Engineer in-charge
Air Cooled Condenser Fin Tubes : Charges for Periodical inspection & to carry out the following preventive maintenance of ACC fin tube bundles & fin cleaning as per the direction of Engineer-in-charge. 1. The tube radiator fins of ACC bundles must be kept free of bugs, links and other debris. 2. Periodical cleaning of the ACC cooling bundles with service water using fin tube cleaning pump
Breakdown Maintenance
Inter Cooler / After Cooler (IA/PA) : Disassembly of IA/PA Compressor Inter cooler/After cooler and taking out tube nest from the shell, inspection, cleaning, leak checking by hydraulic testing, renewal of O rings, gaskets,(O rings, gasket etc., all be provided by the Board) reassembling and normalizing as per the direction of Engineer - in - charge
IA/PA Compressor Belt changing : Removal of IA/PA Compressor Belt, Cleaning Fly wheel, replacing new belt (belt will be supplied by the Board) if necessary, checking alignment and normalizing as per the direction of Engineer - in - charge
Oil Replacement work (IA/PA) : Draining of oil from the oil sump of IA / PA Compressor, inspection, cleaning of the sump and filter element, replacing of filter element if necessary (oil filter will be provided by the Board) filling with lube oil and normalizing as per the direction of Engineer - in - charge
IA/PA compressor Suction Air filter cleaning work : Disassembly of suction air filter of IA/PA Compressor, disassembly of suction pipe line from LP cylinder, inspection, thorough cleaning of suction air filter and suction pipe line, replacement of suction filter (suction filter will be supplied by the Board) if necessary, reassembling and normalizing as per the direction of Engineer - in - charge
IA/PA LP & HP side water jacket cleaning work : Disassembly of LP and HP water jacket inspection covers of IA/PA Compressor, cleaning the water jacket, renewal of gasket packing, reassembling and normalizing as per the direction of Engineer - in - charge
IA/PA Suction & Discharge valve work : Disassembly of suction side and discharge side valve covers, valve plates of LP and HP cylinder of IA/PA Compressor, inspection, cleaning, Renewal / Rectification of valve plates assembly, re-assembly and normalizing as per the direction of Engineer - in - charge
IA/PA Compressors Emergency Breakdown work : Emergency Breakdown maintenance of IA/PA Reciprocating compressors - 2 stage Horizontal KIRLOSKAR PNEUMATIC CO.LTD. Model: T-BTD-LM( 255mm&160mm, FAD 8.87 m3/min) comprising of disassembly of LP&HP internals such as cylinder suction & discharge valve plates assembly, piston rod, piston rings, wearing rings inspection, cleaning, rectification/replacement of spares if necessary (O rings, gaskets & spares will be supplied by the Board) and normalizing as per the direction of Engineer - in - charge
Cooling water pump of IA/PA system : Disassembly of cooling water pump for ( Make : Mather Platt Pumps Ltd., Q = 20 m3/hr) IA/PA Compressor system, inspection of internal parts, cleaning, rectification / renewal of parts, re-assembly (gaskets, spares will be supplied by the Board), normalizing as per the direction of Engineer - in - charge
IA/PA Cooling Tower: Inspection of IA/PA cooling tower fans, cleaning the towers, basin and its valves, Fills cleaning ,Fills Replacing and normalizing as per the direction of Engineer - in - charge.
IA/PA LP & HP side renewal of piston rings & clearance checking work : Disassembly of HP or LP cylinder outer cover and removal of piston and pressure packing rings cleaning and renewal of pressure packing rings, assembling piston, adjusting the piston clearances, assembling the cylinder outer cover, normalizing as per the direction of Engineer - in - charge
IA/PA Lube Oil Tank Cleaning & Gear pump Inspection work : Disassembly of lube oil gear pump, inspection cleaning, renewal of spares if necessary reassembling and normalizing as per the direction of Engineer - in - charge
IA/PA NRV servicing work : Disassembly of 100NB NRV in the discharge air line of the compressor, Inspection, cleaning, lapping and blue matching, reassembling and normalizing as per the direction of Engineer - in - charge
Air Dryer Unit (IA/PA) : Disassembly of Inspection cover of Instrument Air dryer unit desiccant tower, removal of desiccant, cleaning of internals, refilling of new desiccant and closing of inspection cover, disassembly of prefilter and after filter, inspection, cleaning, assembly of filters supplied by the Board, disassembly and cleaning of purge control valve and change over valve and normalizing the operation of Instrument Air dryer unit as per the direction of Engineer - incharge
Breakdown maintenance work of PSA system : Disassembly of inspection cover for Process Air Nitrogen gas unit Carbon molecular sieves tower, removal of Carbon molecular sieves , cleaning of internals, refilling of new Carbon molecular sieves and closing of inspection cover, disassembly of prefilter , inspection, cleaning, assembly of filters supplied by the Board, disassembly and cleaning of Pressure control valve and change over valve and normalizing the operation of Process Air Nitrogen gas unit as per the direction of Engineer - incharge
CCCW System / Various Valves / Bellow Work/Motor Alignment work : 400 NB New Butterfly valve, 400 NB New Non Return Valves Replacement work / attending any other unforeseen minor defects related to mechanical maintenance work (or) replacing old 400 NB Expansion Rubber bellows (or) de-coupling and coupling of motor in case of failure to co-ordinate electrical maintenance work, Alignment checking and coupling with the motor, completion and normalizing as per the direction of Engineer in-charge
RC Fan Driven Motor Alignment Work: Motor and Fan Alignment checking at the time of Electrical motor Replacement or attending any other unforeseen minor defects related to mechanical maintenance work and normalizing as per the direction of Engineer - in - charge.
ACC Gear Box and motor pulley coupling & decoupling work : Removing ACC Gear Box and motor pulley from the motor shaft and inspection of the pulley bolt with Bushes and Replacing the damaged Bushes by new bushes and Inserting the coupling with bolt, coupling with motor and normalizing as per the direction of Engineer - in - charge
ACC Fans break down maintenance work : Dismantling the ACC fan after disconnecting from the motor, checking the gear box bearings, oil seals and inspection of gears and replace the failed bearings by new ones as required, which will be supplied by the board, reassembled the fan, alignment checking and coupling with the motor, Normalizing the System as per the direction of Engineer - in - charge
ACC fin tube cleaning pump emergency breakdown: Dismantling the ACC fin tube cleaning pump(Make:KSB Pumps Ltd., Q = 6 m3/hr) into its parts. Cleaning of the parts, replace the failed Bearing, Mechanical Seals, Gland packing etc., If require reassembling alignment checking and coupling as per the direction of Engineer - in - charge
Rc Fan Driven End / Non Driven End Bearing Break Down Work : 1) Removing Fly Wheel Guard & Decouple the gear teeth Belt from Motor Pulley. 2) Disassemble the Fly wheel, Fan Shaft, Top & Bottom Bearing, Oil seal,Circlip,Fan Leaf Bush,FanLeaf Hub,etc.. 3)Run out of Shaft Checking at Lathe. 4) Replacing DE/NDE Bearings, oil seal,Circlip,Grasing for Bearing. 5) Assemble all parts, Alignment Checking between motor and Fan Pulley, and Normalizing the System. , etc., as per the direction Engineer-in-charge
Minor welding works : Charges for attending any minor weld defects in lube oil, air and water lines and support structures by welding as per the direction of Engineer in charge
STEAM TURBINE
Periodical Maintenance
Charges for inspection on STG Oil Pump such as Emergency Oil Pumps, jack oil pumps, OVEFS, centrifuge, arresting of oil leaks etc., and carrying out regular maintenance works like external cleaning, checking and topping up of oil level in pumps, MOT through centrifuge, cleaning of cooling water line, cleaning of oil centrifuge, collection of oil leakages if any and topping up through centrifuge, arresting of gland leaks, easing the valve operation etc., wherever necessary, as per the direction of Engineer – in- charge
Charges for inspection of LO cooler, LO filters, Governing system, Emergency stop valves, Control valves and carrying out regular maintenance works like arresting of oil leaks in flanges and valve glands by tightening the glands and replacing of gaskets if required, applying grease wherever necessary, external cleaning of governing system and turbine body and its accessories as per the direction of Engineer – in- charge
Charges for inspection on surge tank ,HP/LP flash tank and STG flash tank, STG waste oil sump pumps, cleaning and keeping the area clean and tidy, attending any defects like manhole leaks, flange leaks etc. by tightening the flanges or by changing the gasket, applying grease to all hand operated valves and easing the operation of the valves as per the direction of Engineer – in- charge
Charges for welding joints upto 50mm per joint in steam & water lines and support structures by welding including removal of the insulation, refixing the insulation after testing the weld by using DPT kit as per the direction of Engineer-in-charge
Charges for inspection of the Steam Turbine and its auxilaries, HP/IP/LP Bypass station and observe for any gland/bonnet leaks in various valves and rectify the defect by removal of the old gland packing/gasket and replacing new one, lubricating of the valves and easing the valve operation as per the direction of Engineer – in- charge
Charges for start up work in Steam Tubine (ST) and its auxiliaries, maintenance assistance for valve operations and to attend water/ steam/ Oil leak during start up as per the direction of Engineer - in-charge
Charges for inspection of Hot well drain pumps, Gland steam condenser and gland steam exhaust fans and carrying out regular maintenance works like external cleaning,cleaning and replacement of strainers, checking and topping up of oil for bearings, coupling check and attending valve gland leaks, flange leaks etc as per the direction of Engineer-in-charge
Cleaning and replacement of strainers and filters in STG lub oil system (Governing system filter, control oil filter and JOP filter) etc., as per the direction of Engineer-in-charge
Charges for welding joints upto 50mm diameter steam/water lines using High Pressure Welder including removal of the insulation, refixing the insulation after testing the weld by using DPT kit as per the direction of Engineer-in-Charge
Walk down and visual inspection of CEP's and carrying out regular maintenance work like external cleaning, arresting of gland leaks in the system valves, checking of oil level easying valve operation and replacement of gaskets if any etc., as per direction of Engineer-in-charge
Walk down and visual inspection of Vacuum pump's includes ACW pump cooling towers and connected line etc., and carrying out regular maintenance works like external of cooling water line arresting of gland leaks etc., wherever necessary per the direction of Engineer-in-charge
Breakdown Maintenance
STG Lube oil pumps Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve, impeller and oil labyrinth, cleaning of suction strainer, assembling of the pump, alignment of the pump with motor and coupling, as per the direction of Engineer – in – charge
Jack Oil Pump Charges for decoupling, dismantling of the pump assembly, inspection of bearings, oil seals and screws etc., servicing of pressure regulating valve, replacement of the worn-out or damaged parts, if necessary and alignment and coupling of the pump with motor after works as per direction of Engineer–in–charge
Hotwell drain pumps. Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve, impeller and oil labyrinth cleaning of suction strainer, assembling of the pump, alignment of the pump with motor and coupling, as per the direction of Engineer – in – charge
ACW Pumps or Seal water pumps of Vacuum system Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring,shaft protection sleeve, impeller and oil labyrinth cleaning of suction strainer, assembling of the pump, alignment of the pump eith motor and coupling as per the direction of Engineer-in charge
MOT Vapour Extraction Fans/Gland steam cooler Vapour Extraction Fans Charges for overhauling/motor replacement of MOT Oil Vapour Extraction fans, Gland steam cooler vapour extraction fans, including replacement of impeller, seals, shaft, shaft sleeve, bearings etc., if necessary as per the direction of Engineer-in-charge
LPT atmospheric relief diaphragm renewal Charges for removal of LPT atomospheric relief diaphragm assembly from LP casing of the steam turbine, dismantling the diaphragm, replacement of lead sheet and gaskets, reassembly and installation, as per the direction of Engineer-in-charge
STG Turning Gear Manual Operation During Failure Engaging gear teeth manually, rotating the hand wheel for STG manual rotor rotation during STG Turning gear failure period, Resuming auto operation of STG Turning gear as per the direction of Engineeer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 40 - 50 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 80 - 100 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 125 - 150 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 200 - 250 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of Pneumatic Operated Flow Control/Temperature Control/HP Spray Control/Drain Valves: charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work, as per the direction of Engineer-in-charge
CEP's: Charges for decoupling, dismantling of pump coupling assembly, checking of mechanical seal, bearings and replacement if any, assembling, alignment of the pump with motor and coupling as per the direction of shift Engineers-in-charge
STG Waste Oil Sump Pump Charges for removing the motor, dismantling of the pump assembly, checking of gland packings, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve impeller and oil labyrinth cleaning of suction strainer, assemblingof the pump, alignment of the pump with motor and coupling, as including the cost of consumables and T&P 's per the direction of Engineer-in-charge
STG Lube Oil Duplex Filter Cleaning Charges for cleaning and replacement of filter elements in STG lub oil duplex filters, which includes changing over the running filter, drain the lub oil through centrifuge, removal of flange connection in vent line, removal of bolt and opening the top cover, removal of filter elements, cleaning with diesel and air fixing the same or replace the filter elements, closing the top cover, tightning the bolt, slowly charging the filter via charging valve and normalizing the filter etc, including the cost of consumables and T&Ps as per the direction of Engineer-in-charge
PLATE HEAT EXCHANGER for Lube Oil System Charges for dismantling the plate heat exchanger asssembly in lube oil system, for attending any water leakage, removal of plateheat exchanger plates & cleaning the plates, inspection of rubber gaskets, replacing the new gasket if required, again re assembling the plate heat exchanger as per the direction of Engineer -in - charge
HEAT RECOVERY STEAM GENERATOR
Periodical Maintenance
Charges for inspection of HRSG Phosphate dosing pumps and HRSG drain pit pumps, to carry out cleaning and minor rectification works like arresting of gland leaks in pumps, renewal of gland packing, if necessary, topping up of oil, adjusting of stroke length, lubricating of bearings etc., as per the direction of Engineer-in-charge
Charges for inspection of HRSG HP/IP/LP drum system, HP/IP/LP vent system, safety valves, HP/IP/LP main steam system, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets as per the direction of Engineer-in-charge
Charges for inspection of HRSG HP/IP/LP Feed control Station, HP/IP/LP blowdown system, HP spray control station, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets, HRSG manhole door inspection and attending minor leaks as per the direction of Engineer-in-charge
Charges for inspection of HP and IP/LP (4 Nos) Boiler feed pumps, all conected pipes and valves in suction & discharge side and to carry out regular maintenance work like external cleaning, checking and topping up of oil for bearings, cleaning of mechanical seal cooler, suction strainers, arresting of flange leaks, gland leak in valves & renewal of gland packings if required cleaning of cooling water line, applying grease in valve & easing the operation of valves wherever necessary as per direction of Engineer -in-charge
Charges for inspection of Deaerator, Feed Tank, Plate heat Exchanger and connected pipes and valves and carrying out regular maintenance work like external cleaning, arresting of flange leaks, changing of gaskets, gland leak in valves & renewal of gland packing if required, applying grease in valve & easing the operation of valve wherever necessary asper the direction of Engineer - in - charge.
Charges for inspection of HRSG drain system, flash tanks, IBD and CBD tanks, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets as per the direction of Engineer-in-charge
Charges for welding joints upto (100 mm Dia) in steam & water lines and support structures by welding including removal of the insulation, refixing of the insulation after testing the weld by using DPT kit as per the direction of Engineer-in-charge
Charges for welding joints upto 100mm diameter steam / water lines using High Pressure Welder including removal of the insulation, refixing of the insulation after testing the weld by using DPT kit as per the direction of Engineer-in-Charge
Charges for inspection hydrazine dosing pumps and its auxiliary piping, flanges & tank agitator for carrying out cleaning and rectification works like, attending flange leak & valve gland leaks in the dozing system, arresting of gland leaks in pumps, renewal of gland packing, if neccessary, topping up of oil, adjusting of sroke lenth, lubricating of bearings, etc., as per direction of Engineer -in- charge
Breakdown Maintenance
Phosphate Dosing Pumps For HP/IP/LP Drums: Dismantling of the pump decoupling & coupling, checking of suction & discharge valve, replacement of gland packing, replacement of worn out bearings, worm wheel and shaft, if any, changing of gear box oil etc. and assembling of the pump after completion of work, coupling with motor as directed by Engineer-in-charge.
HP BFP : DE Mechanical seal / Bearing inspection: Charges for decoupling, coupling hub removal, checking of drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning of seal water cooler, flushing of coolingwater pipings, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work was completed, etc., as per direction of Engineer - in- charge.
HP BFP : NDE Mechanical seal / Bearing Inspection: Charges for decoupling, coupling hub removal, checking of Non drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning of seal water cooler, flushing of cooling water pipings,replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work was completed, etc., as per direction of Engineer - in- charge
IP /LP BFP : DE Mechanical seal / Bearing Inspection: Charges for decoupling, coupling hub removal, checking of drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer - in- charge
IP /LP BFP : NDE Mechanical seal / Bearing Inspection Charges for decoupling, coupling hub removal, checking of Non drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer - in- charge
Overhauling of MOV/Hand operated valves and NRVs upto 25mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 40 - 50 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 80 - 100 mm size: Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 125 - 150 mm size: Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Overhauling of MOV/Hand operated valves and NRVs upto 200 - 250 mm size: Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge
Hydrazine Dozing Pump: Charges for dismantling of the pump, checking of suction & discharge valve, replacement of gland packing,worn out bearings, worm wheel and shaft, if any replenishing of gear box oil etc., reinstallation of the pump as per direction of Engineer - in - charge.
Thermal Insulation Removal for Single layer, lagging and cladding
Thermal Insulation Reinsulation for Single layer, lagging and cladding
HP/IP/LP Phospate /Hydrazine dozing stirrer Charges for decoupling of stirrer and motor, cleaning the shaft and impeller, inspection of bearings, replacement of wornout bearings, assemling of the same, after completion of work, coupling with motor and normalizing etc., as per the direction of Engineer - in -charge
Internal Inspection of HRSG : Charges to facilitate the internal inspection of HRSG by opening the manhole door assy. in all the elevations whenever required and closing the manhole door assy after inspection and renewal of sealing ropes etc., if required as per the direction of Engineer - in - charge
Overhauling of Pneumatic Operated Flow Control/Temperature Control/HP Spray Control/Drain Valves: charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat,valve globe/gate and blue matching,assembling of valve,renewal of gland packing,assembling actuator if any,providing insulation,checking of valve operation and completing the work, including T&Ps and consumables as per the direction of Engineer-in-charge
HRSG Drain Pit Pumps : Breakdown maintenance of HRSG drain pit pumps like cleaning of suction strainer, decoupling of the pump inspection of the pump internals, changing of the impeller / Casing wearing / Bearing / sleeves / Oil seals etc.,and coupling of the pump with motor including the cost of consumables and T&P 's as per the direction of Engineer-in-Charge
Plate Heat Exchanger for Condensate system : Charges for dismantling the plate heat exchanger asssembly, for attending any water leakage, removal of plateheat exchanger plates ( 143 nos ) & cleaning the plates, inspection of rubber gaskets, replacing the new gasket if required, again re assembling of plate heat exchanger etc., as per the direction of Engineer -in - charge
DM PLANT MAINTENANACE
Periodical Maintenance
Charges for inspection of all types of Vertical / Horizontal pumps in DM Plant and other sump pumps etc., observe for any gland leaks, rectify the same by gland tightening or changing of gland packing, lubricating of bearings, cleaning of strainer, keeping the area neat and tidy etc., as per the direction of Engineer -in-Charge
Charges for inspection of Air Blowers in DM plant area, external cleaning of the same, keeping them neat and tidy and attending to minor repairs including decoupling of the Blowers, coupling of the same after works, lubricating of bearings, topping up of oil, Alignment works etc., as per the direction of Engineer -in-Charge
Charges for inspection of the Pre treatment plant, clarified water system, electronic dozing pumps, cleaning and keeping the area clean and tidy, attending any minor repairs in floculator agitator, flash mixer, electronic dozing pumps etc., as per the direction of Engineer -in-Charge
Charges for inspection of De-gassing tower, air blowers of De-gassing tower, caustic lye and HCL storage tank etc., for any defects, external cleaning of the same, keeping the area neat and tidy and carrying out regular maintenance works including minor repair etc., as per the direction of Engineer -in-Charge
Charges for inspection and carrying out the regular maintenance of R.O Booster Pumps, R.O skids, and R.O lines in DM plant, including minor repairs like attending to gland leaks in pumps, valves, flange joints leak, lubricating of pumps, bearings, valves etc and keeping the area neat & tidy., as per the direction of Engineer -in-charge
Charges for inspection of all types of chemical dosing pumps in DM plant area ,and carrying out rectification of minor defects, cleaning the pumps, arresting of leaks in suction discharge line hoses, checking of dosing, keeping the area neat and tidy etc., as per the direction of Engineer-in-charge
Charges for Routine maintenance and cleaning of Acid and Lye dilution / measuring tank for mixed bed, keeping the area neat & tidy and attending to any minor defects etc., as per the direction of Engineer-in- charge
Charges for Regular maintenance of all types of valves in D.M. Plant including minor repairs like replacement of stud, stem, diaphragms, actuator bush including replacement of new valves., as per the direction of Engineer-in-charge
Charges for Regular maintenance of pipelines of all sizes in DM plant area, such as attending flange leaks, pipelines leaks changing of gasket etc., as per the direction of Engineer-in-Charge.
Charges for Replacement of catridge filter, Removal of old catridge filter and replacement of new one etc., as per the direction of Engineer-in-charge
Charges for inspection on the dual media filter / activated carbon filter / lime stone filter / keeping the area neat & tidy, carrying out regular maintenance work like attending to any flange leaks in the tank, view glass, manholes, valves etc., as per the direction of Engineer-in-charge
Charges for minor welding defects : Charges for minor welding defects in steam & water lines and support structures by welding etc., as per the direction of Engineer-in-charge
Charges for removing the damaged HDPE pipeline and renewal of pipelines and fitting like stub end, flange and bend etc., and welding HDPE joint by special technique upto 100 mm size as per the direction of Engineer-in-Charge
Charges for inspection of sludge pumps, waste water area pumps, obseve for any abnormal sounds, leak and rectify the same by cleaning the suction strainers, lubricating of bearings, greasing, keeping the area neat and tidy as per the direction of Engineer -in-Charge
Breakdown Maintenance
Horizontal Centrifugal Pumps: Charges for Breakdown maintenance and cleaning of all types of Horizontal centrifugal pumps in DM Plant and water treatment plant other than RO Booster pumps etc., including de-coupling of the pump / changing of impeller / Seals / Shaft sleeve / cone plugs wearing and bearings / stuffing box / oil changing etc., alignment and coupling of pumps, as per the direction of Engineer-in-Charge.
Vertical Pumps: Charges for Breakdown maintenance all types of vertical pumps in DM Plant, other sump pumps etc., like cleaning of suction strainer, decoupling of the pump inspection of the pump internals, changing of the impeller / Casing wearing / Bearing / sleeves / Oil seals etc.,and coupling of the pump with motor, as per the direction of Engineer-in-Charge
Blowers: Charges for Removal of V-Belts, dismantling of all type of Air Blowers in DM Plant and Chlorination Plant etc., inspection of bearings, gears, impellers / lobes, seals etc., replacement of worn out parts, if any assembling of the blowers, alignment of the blower with motor and refixing of V-Belts, as per the direction of Engineer-in-Charge
Water pretreatment tank: Charges for cleaning of clarified water system tank emptying of the clarifier tank, removal of FRB plates one by one, cleaning of the same and refixing the plates, releasing of drain line choke, cleaning of valves and refixing of the same as per the direction of Engineer-in-Charge
Chemical Dosing Pumps: Charges for Dismantling of the suction & discharge tubes of the pump, checking the pump internals / replacement of worn out parts of the pumps and assembling of the same, checking of its stroke and connecting suction and discharge tubes of the pump after completion of the work as per the direction of Engineer-in-charge
R.O High Pressure Pumps: Charges for Decoupling of the pump and motor, removal of the stuffing box gland packing, checking of stuffing boxes and bearings - both DE and NDE, seals, etc., replacement of any damaged or worn out parts if required, alignment of the pump with motor after completion of works and coupling of the pump with motor as per the direction of Engineer-in-charge
Motor and pump de-coupling & alignment work: Charges for de-coupling of motor, after completion of motor related works coupling of pump and motor and alignment as per the direction of Engineer-in-charge
Fire Protection System
Periodical Maintenance
Regular Maintenance of Fire Hydrant System and Fire water spray system : Charges for Periodical inspection of any abnormality and visual inspection of the system for any water leakages through gaskets, gland packings, checking the tightness of the bolts and nuts, greasing of the valve stem & Hydrant valves, washing of the Fire hoses in clear water and drying by natural ventilation, general check-up, general check-up of deluge valve, cleaning of suction strainers of spray system, checking of discharge nozzles, up keeping of the system by through external cleaning and corrective action as required as per the direction of the engineer – in – charge
Preventive maintenance of Portable Fire Extinguisher and Trolley Mounted Fire Extinguishers: Charges for Periodical inspection of any abnormality of the extinguishers for any leak, loose hardware, leaky gaskets, Checking the tightness of the bolts, nuts & hoses, checking the nozzle for any obstruction, greasing of cap threads, general check- up , up keeping of the extinguishers by thorough external cleaning, and attending the corrective action as required as per the direction of the Engineer in-charge
Preventive Maintenance of automatic CO2 Flooding System: Charges for Periodical inspection of any abnormality of the CO2 Flooding System (CO2 banks) for any abnormality and visual inspection of the system for any leak, loose hardware, leaky gaskets, valve leaks, checking the tightness of the bolts & nuts, visual checking of the gas transfer hoses , general check up , up keeping of the system by thorough external cleaning, and attending the corrective action as required as per the direction of the Engineer in-charge
Charges for Periodical inspection of any abnormality and external cleaning of diesel engine, checking the coolant and engine oil levels and topping up, cleaning of suction strainers and checking the engine cooling system etc., and any other unforeseen works as directed by the engineer – in – charge
To carryout assisting and up keeping the stores at VGTPS / Ramnad by carrying out the following works. 1. Receiving and collecting the supply materials as per the supply /purchase order. 2. Segregate the material and arranging. 3. Cleaning the materials and up keeping the materials. 4. To help the stores officers for the periodical inspection and verification and providing the necessary assistance for any other un foreseen minor works related to the store as directed by the store supervisor. 5. Preparing the inventory of the stores and computerizing the spares and materials.
Charges for Periodical inspection of pumps and blowers in STP and ETP area, observe for any gland leaks rectify the same by gland tightening or changing the gland packings lubricating of bearings, topping up of oil, keeping the area neat and tidy etc., as directed by the engineer – in – charge
Breakdown Maintenance
Trace out the actual puncture location in the hydrant and spray lines, isolating the valves for water leak arresting, fabrication and pipeline welding work in Hydrant and spray lines after attending the leak, charging the line for leak testing work etc., and any other unforeseen works as directed by the engineer – in – charge
Dismantling the Hydrant line valves/Spray line valves/Sprinkler System valves in Fire fighting system for inspection, greasing/replace the defective valve by new one which will be supplied by TANGEDCO, reassembling the valves and lines, normalize the system etc., as per the direction of Engineer in-charge
Labor charges for Replacement of defective N2 / CO2 Cylinders, defective Valves in N2/CO2 Cylinders, Hose lines, etc., in the CO2 flooding the system, and refilling of N2 and Co2 gas, leak testing, and normalizing the system, etc. ( cylinders, valves, hoses, N2 , CO2 will be supplied by the TANGEDCO ) as per the direction of Engineer-in- Charge
Break down maintenance of all types of vertical pumps in ETP and STP systems etc, like cleaning suction strainers, decoupling of pump and motor, inspection of pump internals, replacing the impeller / casing wearing / Bearing /Oil seals etc and assembling the pump , coupling the pump with motor as per the direction of Engineer-in- Charge
Break down maintenance of Blowers in STP system, removal of V Belts, dismantling of Air Blowers in STP, inspection of bearings, gears, impellers/lobes,seals etc, replacement of worn out parts, if required , assembling of the blowers, alignment of the blower with motor and refixing of V- Belts as per the direction of Engineer-in- Charge
Labor Charges for removing the damaged HDPE pipeline in ETP and STP systems and renewal of pipelines and fitting like stub end, flange and bend etc., and welding HDPE joint by special technique upto 100 mm size as per the direction of Engineer-in- Charge
Dismantling of the suction & discharge tubes of the pump, checking the pump internals / replacement of worn out parts of the pumps and assembling of the same, checking of its stroke and connecting suction and discharge tubes of the pump after completion of the work in ETP and STP system etc., as per the direction of Engineer-in- Charge
Centralized AC Unit (2 X 60TR)
Periodical Maintenance
Charges for Periodical inspection of 60 TR centralized AC system for any abnormal noise, leak in 60TR centralized AC units of MCR including attending minor defects as per the direction of Engineer incharge
Charges for Periodical inspection of 60 TR centralized AC system for checking and cleaning of AC Plant inlet/outlet ducts and checking of damper operation etc., as per the direction of Engineer-in-Charge.
Charges for Periodical inspection of AHU in 60 TR centralized AC system for removing 2sets of evaporator Air intake filters for cleaning with air and water, re fixing evaporator air intake places etc., as per the direction of Engineer-in-Charge
Charges for Periodical inspection of Air handling system in 60 TR centralized AC unit for cleaning evaporator coil fins with water & air as per the direction of Engineer-in-Charge
Charges for Periodical inspection of Condensing unit of 60TR capacity AC Compressor in Centralized AC system for inspection safety relief valve, internal cleaning by using of HCL Acid / water, etc., as per the direction Engineer In charge
Charges for Periodical inspection of AHU blowers for replacement of worn out parts if any, assembling of the blowers, alignment of the blower with motor etc., as per the direction of Engineer-in-Charge
Charges for Periodical inspection of 60 TR centralized AC system, if any defects/leakages noticed in drain line to be attended and cleaned as per the direction of Engineer-in-Charge
Charges for Periodical inspection of AHU in 60 TR centralized AC system for adjustment of belt tension / replacement of belts if necessary (belts will be supplied by the TANGEDCO) as per the direction of Engineer-in-Charge
Charges for Periodical inspection of AHU of 60 TR centralized AC unit, for assessment of internals of gas expansion valve, rectification of fault/replacement by new gas expansion valve supplied by the TANGEDCO as per the direction of Engineer-in-Charge
Charges for Periodical inspection of ACW cooling water pumps in 60TR centralized AC system to observe any gland leaks, lubrication, top up of oil, attending any minor defects etc., as per the direction of Engineer-in-Charge
Charges for Periodical inspection of Cooling Tower in ACW system, Inspection and Cleaning the internal parts like fills, blades,float as per the direction Engineer In charge
Charges for Periodical inspection of Cooling Tower in ACW system, Inspection and Replacement defective valves as per the direction Engineer In charge
Charges for Periodical inspection of Cooling Tower in ACW system, Inspection and cleaning the NRV's and strainers, keeping the area neat and tidy,etc., as per the direction of Engineer-in-charge
Charges for Periodical inspection of split AC / Tower AC units, for leak testing using N2 gas and refilling of R22 gas (N2 & R22 gasses will be supplied by the TANGEDCO) as per the direction of Engineer-in-Charge
Charges for Periodical inspection of split AC / Tower Ac units, for removal of air filters, inspection and cleaning of air filter elements as per the direction of Engineer-in-Charge
Charges for Periodical inspection of split AC / Tower AC units, for opening of external covers of condenser and evaporator, inspection of condenser coils and thorough cleaning etc., as per the direction of Engineer-in-Charge
Charges for Periodical inspection of Split AC / Tower AC units, for replacing defective sealed compressor by new one, refilling of R22 gas, leak testing by N2 gas and refilling of R22 Gas as per the direction of Engineer-in- Charge.(R22 & N2 Gas will be supplied by the TANGEDCO)
Labour charges for welding joint of 100 NB & 80 NB MS/CS pipe lines in ACW system etc., as per the direction of Engineer-in-charge.
Labour charges for welding joint of 50 & 25 NB MS/CS pipe lines in ACW system etc., as per the direction of Engineer-in-charge.
Charges for Periodical inspection of cleaning of air filters / fresh air supply grills in ventilation units of cable spreader room, etc., as per the direction of Engineer-in-Charge.
Charges for Periodical inspection of ventilation blower of cable spreader room for attending minor defects and adjustment of belt tension / replacement of belts in the Blower, replacement of worn out parts, assembling of the blowers alignment of the blower with motor, greasing and normalizing etc,as per the direction of Engineer-in-Charge
BREAKDOWN MAINTENANCE
Charges for complete overhauling of 60TR capacity Reciprocating AC compressor. Disassembly the Compressors into its components, thorough cleaning of parts, replace the worn out parts, drain the old oil and top up the new oil, reassemble the compressor and carryout N2 pressure test to the required pressure and vacuum testing and R22 gas charging, testing and normalizing as per the direction Engineer In charge. (The required spares, lube oil, N2 and R22 gas will be supplied by TANGEDCO).
harges for breakdown work in 60TR capacity AC Compressor unit including decoupling the motor by releasing the coupling, dismantling the external covers of compressor unit, inspection of compressor internals for any damages, replacement of suction/discharge reeds, if necessary, attending minor rectification works and refilling of R22 gas, motor to compressor alignment checking as per the direction of engineer in charge. (The required spares, lube oil, N2 and R22 gas will be supplied byTANGEDCO).
Charges for complete overhauling of 60TR capacity AC Compressor condensing unit Checking the complete unit with 1.25 times of the operating pressure with N2, attending any leak if leak is there as per the direction Engineer In charge
Charges for disassembly of cooling water pump for ACW system Inspection of internal parts, cleaning, rectification /renewal of parts, re-assembly (gaskets, spares will be supplied by the TANGEDCO) normalizing as per the direction of Engineer - in - charge
Charges for overhauling of Cooling Tower in the ACW system Cleaning, inspection and changing the defective parts such as Fills, Floats, Blades, Fan etc., as per the direction Engineer In charge. (which will be supplied by the TANGEDCO).
Charges for breakdown work in Air Handling unit of MCR including dismantling of external covers of AHU, removal of Air Filters, inspection/replacement of Gas Expansion Valve, visual inspection for any damages in evaporator coil, leak testing with N2 Gas, attending leak if any by brazing, thorough cleaning of evaporator coil with air & water, Refilling of R22 gas, testing and normalizing as per the direction of Engineer in charge. (N2 and R22 gas will be supplied by TANGEDCO)
Charges for Disassembly of Tyre Coupling of 60 TR AC Compressor in centralized system Inspection of all parts, cleaning, rectification / renewal of parts, re-assembly (Coupling Tyre, spares will be supplied by the TANGEDCO) alignment checking with motor and normalizing as per the direction of Engineer - in - charge
Charges for overhauling the Ventilation Damper, checking the damper open/ close position and its blades / replacing the wornout parts / blades, inspecting the Ducts / replacing the corroded portion of the ducts for the Cable gallery Room,etc., as per the direction Engineer-in-charge. The required spares will be supplied by the TANGEDCO
Charges for breakdown work in Ventilation system Blowers by removing the belt, pulley & bearings for any damages, replacement of pulley/bearings, if necessary, cleaning the blower (or) decoupling & coupling of motor, alignment cheking, assembling & normalizing as per the direction of Engineer - in - charge
Tech and Mech Engineers and Erectors
BHARATHI ENTERPRISES
CKEE ENGINEERING PRIVATE LIMITED
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .