| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance AT MANJURI ROAD DIST BHADRAK PIN 756100 | BHADRAK | ODISHA | 756100 | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.1 L+₹4,828.53 (0.80%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹4,828.53 (0.80%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹6.1 L+₹4,828.53 (0.80%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹4,828.53 (0.80%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹6.1 L+₹4,940.09 (0.82%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹4,940.09 (0.82%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹6.1 L+₹4,940.09 (0.82%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹4,940.09 (0.82%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Tapan Mahapatra L5 | RAMAKANTA BISWAL L3 | BHARATA LAXMI BISWAL L2 | ASHIRBAD BISWAL L2 | MAMATAMAYEE DAS L6 | PRIYA RANJAN ROUTRAY L6 | PRASANJIT PANDA L4 | PRAVAKAR NAYAK L4 | RAKESH KUMAR BISWAL L3 | Santosh Bharati L1 | NIRANJAN PRUSTY L3 | ABANTI DAS ADHIKARI L6 | MRUTYUNJAY ROUT L4 | NISHITA SWAIN L3 | JHARANA DAS L6 | LOTUS INFRA L3 | SUBHASMITA PRADHAN L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance for cutting bushes cleaning the sites etc complete. | 1,125 | Sqm. | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.74 ₹3,082.5 | 2.74 ₹3,082.5 | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest | 2.43 ₹2,733.75 Lowest |
| 2.00 | Drilling of Tubewell 240mm dia to accommodate 125 mm. dia PVC Casing Pipe & gravel of 6 mm to 10 mm size | 150 | Mtr. | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 710 ₹1,06,500 | 710 ₹1,06,500 | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest | 705.5 ₹1,05,825 Lowest |
| 3.00 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 130 | Mtr. | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 900 ₹1,17,000 Lowest | 900 ₹1,17,000 Lowest | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 | 903.72 ₹1,17,483.6 |
| 4.00 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 25 | Mtr. | 913.5 ₹22,837.5 | 913.49 ₹22,837.25 | 900 ₹22,500 Lowest | 900 ₹22,500 Lowest | 913.49 ₹22,837.25 | 913.49 ₹22,837.25 | 913.5 ₹22,837.5 | 913.5 ₹22,837.5 | 913.49 ₹22,837.25 | 913.5 ₹22,837.5 | 913.49 ₹22,837.25 | 913.49 ₹22,837.25 | 913.5 ₹22,837.5 | 913.49 ₹22,837.25 | 913.49 ₹22,837.25 | 913.49 ₹22,837.25 | 913.49 ₹22,837.25 |
| 5.00 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 1.5 | Mtr. | 1,422.65 ₹2,133.98 | 1,422.64 ₹2,133.96 Lowest | 1,500 ₹2,250 | 1,500 ₹2,250 | 1,422.65 ₹2,133.98 | 1,422.65 ₹2,133.98 | 1,422.65 ₹2,133.98 | 1,422.65 ₹2,133.98 | 1,422.64 ₹2,133.96 Lowest | 1,422.65 ₹2,133.98 | 1,422.64 ₹2,133.96 Lowest | 1,422.65 ₹2,133.98 | 1,422.65 ₹2,133.98 | 1,422.64 ₹2,133.96 Lowest | 1,422.65 ₹2,133.98 | 1,422.64 ₹2,133.96 Lowest | 1,422.64 ₹2,133.96 Lowest |
| 6.00 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 22.1 | Cum | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 250 ₹5,525 | 250 ₹5,525 | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest | 240.46 ₹5,314.17 Lowest |
| 7.00 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge.a) 2nd depth - | 17.4 | Cum | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 420 ₹7,308 | 420 ₹7,308 | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest | 389.35 ₹6,774.69 Lowest |
| 8.00 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge.b) 3rd depth - | 0.6 | Cum | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 580 ₹348 | 580 ₹348 | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest | 528.68 ₹317.21 Lowest |
| 9.00 | Filling the F & P with sand well watered and rammed etc complete | 0.9 | Cum | 490.51 ₹441.46 | 490.51 ₹441.46 | 499.99 ₹449.99 | 499.99 ₹449.99 | 490.5 ₹441.45 Lowest | 490.5 ₹441.45 Lowest | 490.51 ₹441.46 | 490.51 ₹441.46 | 490.51 ₹441.46 | 490.51 ₹441.46 | 490.51 ₹441.46 | 490.5 ₹441.45 Lowest | 490.51 ₹441.46 | 490.51 ₹441.46 | 490.5 ₹441.45 Lowest | 490.51 ₹441.46 | 490.51 ₹441.46 |
| 10.00 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 0.95 | Cum | 5,771.52 ₹5,482.94 | 5,771.52 ₹5,482.94 | 6,000 ₹5,700 | 6,000 ₹5,700 | 5,771.51 ₹5,482.93 | 5,771.51 ₹5,482.93 | 5,771.52 ₹5,482.94 | 5,771.52 ₹5,482.94 | 5,771.52 ₹5,482.94 | 577.52 ₹548.64 Lowest | 5,771.52 ₹5,482.94 | 5,771.51 ₹5,482.93 | 5,771.52 ₹5,482.94 | 5,771.52 ₹5,482.94 | 5,771.51 ₹5,482.93 | 5,771.52 ₹5,482.94 | 5,771.52 ₹5,482.94 |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
10 Aug 2026, 5:00 pmClosed
DEPUTY DIRECTOR GEOLOGY
DEPUTY DIRECTOR GEOLOGY,GWD DIVISION,BARIPADA,TAKATPUR,PIN-757003
Construction of 05(Five) nos of Recharge Shafts in Rasagovindpur Block of Mayurbhanj District under ARUA Scheme for the FY 2026-27
2026_GWSI_136891_1
06/GWDBPD/ARUA/2026-27
Open Tender
Civil Works - Others
Item Rate
RASGOBINDAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,500
Yes
11 Aug 2026
24 Jul 2026
11 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance for cutting bushes cleaning the sites etc complete. | 1,125 | Sqm. | 2.86 | ₹3,217.5 |
| 2 | Drilling of Tubewell 240mm dia to accommodate 125 mm. dia PVC Casing Pipe & gravel of 6 mm to 10 mm size | 150 | Mtr. | 830 | ₹1,24,500 |
| 3 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 130 | Mtr. | 1,063.2 | ₹1,38,216 |
| 4 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 25 | Mtr. | 1,074.7 | ₹26,867.5 |
| 5 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 1.5 | Mtr. | 1,673.7 | ₹2,510.55 |
| 6 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 22.1 | Cum | 282.89 | ₹6,251.87 |
| 7 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge.a) 2nd depth - | 17.4 | Cum | 458.06 | ₹7,970.24 |
| 8 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge.b) 3rd depth - | 0.6 | Cum | 621.98 | ₹373.19 |
| 9 | Filling the F & P with sand well watered and rammed etc complete | 0.9 | Cum | 577.07 | ₹519.36 |
| 10 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 0.95 | Cum | 6,790.02 | ₹6,450.52 |
stage.html
html • 0.05 MB
finance_603047.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
PKG06ARUA.pdf
Tender Documents • 2.16 MB
BOQ_603047.xls
BOQ • 0.40 MB
C4.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .