| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | -30.00% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹13.5 L (7.14%)Admitted-Finance | -25.00% | ₹2.0 Cr+₹13.5 L (7.14%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹13.6 L (7.16%)Admitted-Finance | -24.99% | ₹2.0 Cr+₹13.6 L (7.16%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹27.1 L (14.3%)Admitted-Finance | -20.00% | ₹2.2 Cr+₹27.1 L (14.3%) | L4 | Admitted-Finance |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
19 Jun 2026, 3:00 pmClosed
Asstt. CEO (D)
SMVDSB, Katra
Construction of School for Divyang Children at Chaitanya Aashram, Jammu
2026_SMVSB_311201_1
e-NIT No. CO/Proj./187/324 DT 30.05.2026
Open Tender
Civil Works
Percentage
450 days
SMVDSB, Katra
refer bid document
4 documents required · 4 mandatory
₹1,000
FA/CAO, SMVDSB
₹5.4 L
SMVDSB, Katra
16 Jul 2026
30 May 2026
20 Jun 2026
30 May 2026
19 Jun 2026
30 May 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead | |||||
| 1.01 | Doors | 40 | Nos | 285.25 | ₹11,410 |
| 1.02 | Windows | 57 | Nos | 285.25 | ₹16,259.25 |
| 2 | Demolishing of brick work manually/mechanical means including stacking of serviceable material and disposal of unserviceable material 50mtr lead. | 517.75 | Cum | 1,458.45 | ₹7,55,112.49 |
| 3 | Demolishing RCC work manually/mechanical means including stacking steel bars and disposal of unserviceable material within 50 mtr lead. | 263.42 | Cum | 2,516.85 | ₹6,62,988.63 |
| 4 | Dismantling/Demolishing Cement concrete manually or mechanical means including disposal of material within 50 mtr as per direction (1:3:6) or richer mix | 263.42 | Cum | 1,725.2 | ₹4,54,452.18 |
| 5 | Dismatling tile work in floor and roof laid in cement mortat including stacking of materia for thickness 25mm to 40mm | 590.07 | Sqm | 89.95 | ₹53,076.8 |
| 6 | Demolishing mud phoska in terracing and disposal of material within 50 mtr | 35.4 | Cum | 647.15 | ₹22,909.11 |
| 7 | Providing and fixing double scaffolding system ( cup lock type ) on the exterior side of building/ structure, upto 25 mtrs height above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 mtr.c/c, horizontal and vertical tubes joint with cup and lock system with M.s tube, M.S tubes Challis M.S clamps. The elevation area of the scafolding shall be measured for payment purpose. | 490 | Sqm | 265.3 | ₹1,29,997 |
| 8 | Shifting of dismantled mulba from site to disposal site/outside city area by mechanical transport avg. lead upto 10km. | 1,109.5 | Cum | 279.04 | ₹3,09,594.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1007709.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .