Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L - 1₹2.2 LAccepted-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹2.2 L | L - 1 | Accepted-AOC L - 1 |
| 2 | Not Admitted-Fee/PreQual/Technical 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical 874 B GANGA RAM KA BADA SHEETLAMAI GHAMAPUR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.2 L
EMD Value
₹2,300
Closing Date
16 Aug 2024, 3:00 pmClosed
DGM CIVIL
BL NO 10 SHAKTI BHAWAN MPPMCL JBP
Operation and maintenance of Sewage Treatment Plant STP for Administrative complex at MPPMCL Jabalpur
2024_MPPMC_360822_1
DGM/EEC/Adm.Comp./M/Pur/T-333
Open Tender
Civil Works - Others
Item Rate
365 days
MPPMCL JABALPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹2,300
28 Oct 2024
3 Aug 2024
22 Aug 2024
3 Aug 2024
16 Aug 2024
3 Aug 2024
Amount
Operation and maintenance of Sewage Treatment Plant having capacity of 455 cum per day for Administrative Office complex at MPPMCL, Jabalpur.
Daily operation of Rotor No.1 & 2 from 9 A.M. to 11.30 A.M. and 1.30 P.M. to 3.30 P.M. and maintaining records of opening & shutting time in the register as per prescribed format. (2 X 300 days)
Daily operation of 15 H.P. lawn pump from 8.30 A.M. to 11.30 A.M. and 1.30 P.M. to 4.30 P.M. and maintaining records of opening & shutting time in the register as per prescribed format. (1 X 225 days)
Daily operation of return sludge pump from 9 A.M. to 10 A.M. & 1.30 P.M. to 2.30 P.M. (2 X 300 days)
Daily operation and Maintenance of clarifier from 9 A.M. to 12.00 P.M. and 1.30 P.M. to 5.00 P.M. (1 X 300 days)
Daily cleaning & removal of weeds, algae in an around Sewage Treatment Plant silt bed and general cleaning by brooms, brushes excluding grit channel, oxidation ditch, silt bed, clarifier and storage tank, complete as per direction of Engineer-In-Charge. (400 sqm X 300 days)
Oiling &Greasing of equipment's viz Rotor No.1, Rotor No.2 clarifier Return Sludge Pump 15 H.P. lawn pump scope of work include filling of grease in grease chambers alignment of shaft and replacement of star rubber of couplings tightening of chain toping up of oil in oil chamber of reduction gear unit etc. complete.
Clarifier (1 No. X 24 times)
15 HP lawn pump (1 No. X 12 times)
Roter No. 1 & 2 (2 No. X 24 times)
Return sludge pump (1 No. X 24 times)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .