Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹31.7 L+₹191.75 (<0.01%)Accepted-Finance 622 VANNIER NAGARM ALAGAPURAM PERIYAPUDUR SALEM 636016 | SALEM | SALEM | TAMIL NADU | 636016 | L2 | Accepted-Finance Accepted | |
| 3 | L3₹32.8 L+₹1.1 L (3.32%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹34.8 L+₹3.1 L (9.74%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | L5₹35.8 L+₹4.1 L (12.8%)Accepted-Finance | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | SS Associates L2 | SRS CONSTRUCTIONS L5 | VINDHRA CONSTRUCTIONS L3 | R.R.Kanishka & Co. L1 | MG CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Chipping off the damaged portion and redoing the ceiling plastering in CM 1:3, (One of cement and three of crushed stone plastering sand) 12mm thick for bottom of roof, stair, waist, landing and sunshades in all floors finished with neat cement including hacking the areas, providing band cornice, scaffolding, curing etc., complete | 163 | Sq.m | 130 ₹21,190 | 400 ₹65,200 | 250 ₹40,750 | 34 ₹5,542 Lowest | 300 ₹48,900 |
| 2.00 | Clean removal of cement plaster from walls etc., complete in all respects and complying with relevant standard specifications | 358 | Sq.m | 10 ₹3,580 | 10.5 ₹3,759 | 50 ₹17,900 | 7 ₹2,506 Lowest | 9 ₹3,222 |
| 3.00Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:4 (One Cement and Four Crushed stone sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc.complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | ||||||||
| 3.01 | a).In Ground Floor | 30 | Sq.m | 860 ₹25,800 | 1,000 ₹30,000 | 1,100 ₹33,000 | 800 ₹24,000 Lowest | 1,000 ₹30,000 |
| 3.02 | b).In First Floor | 77 | Sq.m | 875 ₹67,375 Lowest | 1,100 ₹84,700 | 1,150 ₹88,550 | 1,000 ₹77,000 | 1,000 ₹77,000 |
| 4.00Brick partition walls of 75mm thickness using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:4 (One Cement and Four Cruched stone sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc.complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | ||||||||
| 4.01 | a).In Ground Floor | 61 | Sq.m | 590 ₹35,990 Lowest | 650 ₹39,650 | 1,100 ₹67,100 | 800 ₹48,800 | 700 ₹42,700 |
| 4.02 | b).In First Floor | 121 | Sq.m | 600 ₹72,600 Lowest | 700 ₹84,700 | 1,200 ₹1,45,200 | 1,000 ₹1,21,000 | 700 ₹84,700 |
| 5.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmentalofficers. | 914 | Sq.m | 250 ₹2,28,500 | 320 ₹2,92,480 | 250 ₹2,28,500 | 250 ₹2,28,500 | 240 ₹2,19,360 Lowest |
| 6.00 | Supplying and fixing fine polished cuddapah slab of 38 / 40mm thick for cupboard arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed by the departmental officers | 304 | Sq.m | 375 ₹1,14,000 Lowest | 500 ₹1,52,000 | 480 ₹1,45,920 | 400 ₹1,21,600 | 410 ₹1,24,640 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
28 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer and ADO
O/o, Salem Housing Unit, Ayyanthirumaligai Road, Salem
Renovation works to Salem Housing Unit office Building at Judge Bungalow Compound in Salem for the year 2026-27
2026_TNHB_703920_1
SHU/DB/1160/2025
Open Tender
Civil Works - Buildings
Item Rate
180 days
Ayyanthirumaligai Road
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹30,000
30 Sept 2026
11 Sept 2026
28 Sept 2026
12 Sept 2026
28 Sept 2026
12 Sept 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chipping off the damaged portion and redoing the ceiling plastering in CM 1:3, (One of cement and three of crushed stone plastering sand) 12mm thick for bottom of roof, stair, waist, landing and sunshades in all floors finished with neat cement including hacking the areas, providing band cornice, scaffolding, curing etc., complete | 163 | Sq.m | 1 | ₹163 |
| 2 | Clean removal of cement plaster from walls etc., complete in all respects and complying with relevant standard specifications | 358 | Sq.m | 1 | ₹358 |
| 3Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:4 (One Cement and Four Crushed stone sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc.complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 3.01 | a).In Ground Floor | 30 | Sq.m | 1 | ₹30 |
| 3.02 | b).In First Floor | 77 | Sq.m | 1 | ₹77 |
| 4Brick partition walls of 75mm thickness using best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:4 (One Cement and Four Cruched stone sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc.complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 4.01 | a).In Ground Floor | 61 | Sq.m | 1 | ₹61 |
| 4.02 | b).In First Floor | 121 | Sq.m | 1 | ₹121 |
| 5 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmentalofficers. | 914 | Sq.m | 1 | ₹914 |
| 6 | Supplying and fixing fine polished cuddapah slab of 38 / 40mm thick for cupboard arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed by the departmental officers | 304 | Sq.m | 1 | ₹304 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
tenderscheduleoffice.pdf
Tender Documents • 0.83 MB
BOQ_846071.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .