Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.0 L+₹26,197.09 (3.00%)Admitted-Finance BALAJPUR MORE BALIAPUR PO LALGANJ 713359 WEST BENGAL INDIA | BALIAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | L2 | Admitted-Finance | ||
| 3 | L3₹9.1 L+₹34,929.46 (4.00%)Admitted-Finance 00 BALITIKURI BALITIKURI NASKARPARA HOWRAH WEST BENGAL 711113 | HOWRAH | WEST BENGAL | 711113 | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical TC recommendation | ||
| 5 | Rejected-Technical | - | Rejected-Technical TC recommendation |
Tender Value
₹8.7 L
EMD Value
₹11,000
Closing Date
7 Jul 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Making shed for Electrical equipment for submersible pump at bore hole no. 4 of sarpi unit under Shyamsundarpur colliery.
2026_ECL_361483_1
ECL/GM/BA/E TENDER/26-27/Civil/004 Dt 27.06.2026
Open Tender
Civil Works - Others
Percentage
30 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹11,000
12 Oct 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
27 Jun 2026 - 1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m-All kinds of soil. | 18.08 | Cum | 188.75 | ₹3,412.6 |
| 2 | Filling available excavated earth (excluding rock) in trenches plinth sides of foundations etc in layers not exceeding 20cm in depth, consolidating ench deposted layer by ramming and 1 watering, lead up to 50 m and for all lin | 28.8 | Cum | 121.05 | ₹3,486.24 |
| 3 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 3.52 | Cum | 1,061.6 | ₹3,736.83 |
| 4 | P/LP.C.C. excluding the cost of centering and shuttering-All work up to plinth level - 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 1.55 | Cum | 6,007.2 | ₹9,311.16 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses filets, columns, pillars, piers, abutments, posts and struts etc above plinth level up to floor five level, excluding cost of centering2 shuttering, finishing and reinforcement 11.53 (1 cement 1.5 coarse sand zone-III) derived from natural sources 3 praded stone aggregate 20 mm nominal size derived from natural sources) | 1.96 | Cum | 8,030.65 | ₹15,740.07 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for Columns, piers, abutments, pillars, posts and struts | 16.26 | sqm | 644.7 | ₹10,482.82 |
| 7 | Brick work with common burnt clay F.P.S. bricks of class designation 7.5 in foundation and plinth in- Cement mortar 1:6 (1 cement: 6 coarse sand) | 16.74 | Cum | 5,737.7 | ₹96,049.1 |
| 8 | Brick work with common burnt clay F.P.S. bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement: 6 coarse sand) | 32.69 | Cum | 6,973.6 | ₹2,27,966.98 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). | 1.82 | Cum | 8,420.4 | ₹15,325.13 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers | 16.3 | sqm | 494.05 | ₹8,053.02 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 1.05 MB
BOQ_374367.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .