Loading…
Loading…
Tender Value
₹50.0 L
EMD Value
₹1 L
Closing Date
16 Jun 2026, 1:30 pm
the Addl. Chief Engineer cum Director, PWD
O/o the Addl. Chief Engineer cum Director, PWD
Repairing and Renovation of Late Maheswar Muchahary Memorial Community Hall at Pachalabari Chirang District, BTC, Assam, TN_02_14 (R-1) (R-1)
2026_BTC_52509_2
ACE-106/PWD/IFB/PT-I/23-24/293
Open Tender
Civil Works - Building
180 days
Chirang
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹1 L
Yes
26 May 2026
26 May 2026
16 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
26 May 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | - | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Km | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1 | Sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:
6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
SBD_Bldg09.pdf
Tender Documents • 2.60 MB
BOQ_82986.xls
BOQ • 0.27 MB
FOB_09.pdf
Additional Documents • 0.34 MB
Download all tender documents and submit your bid