Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | -29.60% | ₹7.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.9 L+₹90,274.82 (12.9%)Admitted-Fee/PreQual/Technical/Finance | -20.50% | ₹7.9 L+₹90,274.82 (12.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.9 L+₹94,143.75 (13.5%)Admitted-Fee/PreQual/Technical/Finance | -20.11% | ₹7.9 L+₹94,143.75 (13.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.2 L+₹1.2 L (16.9%)Admitted-Fee/PreQual/Technical/Finance | -17.70% | ₹8.2 L+₹1.2 L (16.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.9 L+₹1.9 L (27.4%)Admitted-Fee/PreQual/Technical/Finance | -10.30% | ₹8.9 L+₹1.9 L (27.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹29,760
Closing Date
22 Jul 2026, 4:00 pmClosed
Executive Engineer PHE Division Kupwara
Executive Engineer PHE Division Kupwara
Restoration of water supply by way of providing and laying of pipe network in Matchil area DDC Grants
2026_PHE_315782_3
16 of 07/2026
Open Tender
Civil Works
Percentage
15 days
Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
TRY
₹29,760
Yes
24 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes cables etc. (Not exceeding 1.5m in width) and for shafts, wells cesspits and the like, not exceeding 10sqm on plan, depth upto 1.5m incl. disposal of excavated earth upto 1mtr. from cutting edge disposed earth is to be leveled and neatly dressed | - | - | - | - |
| 2 | All kinds of Soil | 198.67 | Cum | 479.3 | ₹95,222.53 |
| 3 | Providing and fixing of G.I. pipes (Light) incl, cost of pipe & pipe specials and Mechanical Carriage, excluding earth work & refilling. | - | - | - | - |
| 4 | 40mm dia | 860 | Mtrs | 434.65 | ₹3,73,799 |
| 5 | 25mm dia | 845 | Mtrs | 311.95 | ₹2,63,597.75 |
| 6 | 20m dia | 900 | Mtrs | 227.9 | ₹2,05,110 |
| 7 | Providing & fixing GI union in Gi pipe incl, cutting & threading the pipe & making long crews etc complete | - | - | - | - |
| 8 | 40mm dia | 5 | No | 420.8 | ₹2,104 |
| 9 | 25mm dia | 10 | No | 320.4 | ₹3,204 |
| 10 | 20mm dia | 10 | No | 288.3 | ₹2,883 |
stage.html
html • 0.03 MB
finance_1026104.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1026104.xls
BOQ • 0.34 MB
ext16.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .