Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Finance | +0.00% | ₹1.0 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 L+₹2,681.16 (2.56%)Admitted-Finance 294 NEW SANTOSHPUR MAIL 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | +2.56% | ₹1.1 L+₹2,681.16 (2.56%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 L+₹4,315 (4.12%)Admitted-Finance | +4.12% | ₹1.1 L+₹4,315 (4.12%) | L3 | Admitted-Finance |
Tender Value
₹1.0 L
EMD Value
₹2,100
Closing Date
12 Sept 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
DE-PAVING PORTIONS OF FOOTPATHS AT DIFFERENT PLACES FOR PLANTING OF TREES IN WARD-101.
2026_KMC_1040152_1
KMC/EE(C)/BR-XII/26-27
Open Tender
CIVIL WORKS
Percentage
90 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,100
17 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1 | SQM | - | - |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(f) 25 mm to 30 mm shuttering without staging in foundation.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | - | SQM | - | - |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | - | M3 | - | - |
| 4 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EA | - | - |
| 5 | Sub Total | - | - | - | - |
| 6 | GST 18% | - | Nos. | - | - |
| 7 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
FORM-101_03.pdf
Tender Documents • 0.57 MB
BOQ_2554350.xls
BOQ • 0.28 MB
PREQUE.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .