Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Finance NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L1 | Admitted-Finance | |
| 2 | L2₹28.0 L+₹1.9 L (7.09%)Admitted-Finance 10 WARD NO 18 PLOT NO 34 KAMDENU FURNTIURE SIKAR RAJASTHAN 332025 | SIKAR | RAJASTHAN | 332025 | L2 | Admitted-Finance | |
| 3 | L3₹31.5 L+₹5.4 L (20.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹31.7 L+₹5.5 L (21.2%)Admitted-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | L4 | Admitted-Finance | |
| 5 | L5₹32.0 L+₹5.8 L (22.4%)Admitted-Finance A 402 DESIGN ARCH E HOMES SITE C SURAJ PUR GREATER NOIDA GULISTANPUR GAUTAM BUDH NAGAR UP 201306 | GREATER NOIDA | GAUTAM BUDH NAGAR | UP | 201306 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | mayur enterprises L6 | Vijay Electricals L1 | MV Engineers And Contractors L7 | Ridhi engineers and builders L4 | ALLIED CONSTRUCTION L3 | Ruchi enterprises L2 | DYNAMIC BUILDING SOLUTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side and taking out the transformer/Voltage stabiliser indoor/ outdoor type of capacity 630 KVA to 800 KVA, 11 KV/433KV, step down any make for carrying out complete overhauling which shall comprise of the following:-
a) M&L for lifting, transporting, handling the transformer to workshop and back to the original location after complete overhauling or one location to another location where required.
b) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record.
Note:- (i) Any damage to insulators/ bushes/ windings etc. while in the custody of the contractor shall be made good at no extra cost to Department. The serviceability of the transformer shall be checked and confirmed by the contractor before taking into his custody. (ii) M&L for rewinding/ re-insulation of HT/ LT (primary/ secondary) coils, bushes, studs, Transformer oil, cable box, replacement of bucholtz relay/ MOG if any etc will be measured and paid separately. | 2 | Each Job | 3,000 ₹6,000 | 2,000 ₹4,000 | 5,000 ₹10,000 | 3,500 ₹7,000 | 3,000 ₹6,000 | 1,000 ₹2,000 Lowest | 5,000 ₹10,000 |
| 2.00 | All as per Item No. 1 herein before but transformer/Voltage stabiliser indoor/ outdoor type of capacity up to 400 KVA to 500 KVA complete all as specified and directed by Engr-in-Charge. | 2 | Each Job | 3,000 ₹6,000 | 2,000 ₹4,000 | 5,000 ₹10,000 | 2,500 ₹5,000 | 3,000 ₹6,000 | 1,000 ₹2,000 Lowest | 8,000 ₹16,000 |
| 3.00 | All as per Item No. 1 herein before but transformer/Voltage stabiliser indoor/ outdoor type of capacity up to 100 KVA to 315 KVA complete all as specified and directed by Engr-in-Charge. | 2 | Each Job | 3,000 ₹6,000 | 2,000 ₹4,000 | 5,000 ₹10,000 | 2,500 ₹5,000 | 3,000 ₹6,000 | 1,000 ₹2,000 | 20 ₹40 Lowest |
| 4.00 | M&L for filtration of transformer oil of transformers/Servo voltage Stabilizer installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as specified and directed by Engr-in-Charge. | 5,400 | Litre | 5 ₹27,000 Lowest | 7 ₹37,800 | 15 ₹81,000 | 7 ₹37,800 | 7 ₹37,800 | 7 ₹37,800 | 20 ₹1,08,000 |
| 5.00 | Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformers/Servo voltage Stabilizer etc at various locations complete all as specified and directed by Engr-in-Charge. Make: Power oil/ Transol/ Sabitha Chemicals as approved by GE. | 3,000 | Litre | 200 ₹6,00,000 | 125 ₹3,75,000 Lowest | 131 ₹3,93,000 | 165 ₹4,95,000 | 180 ₹5,40,000 | 136 ₹4,08,000 | 300 ₹9,00,000 |
| 6.00 | M&L for rewinding of distribution transformers/AVR of capacity (100 KVA to 800 KVA)/ type by winding the low insulation/defective coils of Primary Coil (HT coil) with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and directed by Engr-in-Charge. Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items. | 300 | KG | 900 ₹2,70,000 | 700 ₹2,10,000 Lowest | 1,200 ₹3,60,000 | 750 ₹2,25,000 | 900 ₹2,70,000 | 700 ₹2,10,000 Lowest | 800 ₹2,40,000 |
| 7.00 | M&L for rewinding of distribution transformers of capacity (100 KVA to 800 KVA)/ type by winding the low insulated/ defective coils of Secondary Coil (LT Coil) with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and directed by Engr-in-Charge.
Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items. | 300 | KG | 900 ₹2,70,000 | 700 ₹2,10,000 Lowest | 1,200 ₹3,60,000 | 750 ₹2,25,000 | 900 ₹2,70,000 | 710 ₹2,13,000 | 800 ₹2,40,000 |
| 8.00 | M&L for re-insulating windings of distribution transformers of capacity (100 KVA to 800 KVA) / size/ type by strip opening of HT/ LT coils (i.e. Primary/ secondary coils) from core assembly safely, unwinding the HT/ LT coils (i.e. Primary/ secondary coils) complete, removing the old defective insulation paper and replacing with new DPC insulation to the copper conductor, re-varnishing of the windings with super varnish including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 and complete all as specified and directed by Engr-in-Charge. | 200 | KG | 900 ₹1,80,000 | 700 ₹1,40,000 | 1,200 ₹2,40,000 | 250 ₹50,000 Lowest | 900 ₹1,80,000 | 300 ₹60,000 | 800 ₹1,60,000 |
| 9.00Disconnection of the Distribution Transformer/AVR from HT and LT supply mains, removing of Bus duct and Bus bar, Leakage arresting to following transformers by draining out of oil, after arrangement of necessary empty oil drums, buckets etc., dismantling of top cover and accessories, dismantling of LT bushings by disconnecting leads/jumpers from inside, replacement of gaskets and oil seals and re fixing of the LT bushings, making internal and external connections, replacement of cover gasket and accessories, refixing of accessories and cover, filling of transformer oil complete, and making cable connections and for energising the transformer. NOTE :- (i) The Cost deems to include materials like gaskets and oil seals and labour complete all as specified and directed by Engr-in-Charge. (ii) The Bushing and bushing rods to be measured and paid separately. | ||||||||||
| 9.01 | 500 kVA to 800 kVA | 5 | Each | 4,000 ₹20,000 | 2,000 ₹10,000 | 6,500 ₹32,500 | 4,500 ₹22,500 | 3,000 ₹15,000 | 2,000 ₹10,000 | 500 ₹2,500 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
7 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Utility Electric Supply
GE Utility Electric Supply DELHI CANTT-10
REPAIR /MAINT OF VCB S RMUS DISTRIBUTION TRANSFORMERS HT ELECTRICAL DISTRIBUTION SYSTEM INCLUDING REPAIR CALIBRATION OF RELAYS METERS AND OTHER ALLIED WORKS AT NSB III PANCHWATI 1 5 GR DCN PALAM TIGRIS 69 MED REGT 512 LT AD
2026_MES_788491_1
GE ELECT/TOKEN-43/2026-2027
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE Utility Electric Supply
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE Utility Electric Supply
₹98,000
19 Oct 2026
9 Sept 2026
10 Oct 2026
9 Sept 2026
7 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side and taking out the transformer/Voltage stabiliser indoor/ outdoor type of capacity 630 KVA to 800 KVA, 11 KV/433KV, step down any make for carrying out complete overhauling which shall comprise of the following:-
a) M&L for lifting, transporting, handling the transformer to workshop and back to the original location after complete overhauling or one location to another location where required.
b) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record.
Note:- (i) Any damage to insulators/ bushes/ windings etc. while in the custody of the contractor shall be made good at no extra cost to Department. The serviceability of the transformer shall be checked and confirmed by the contractor before taking into his custody. (ii) M&L for rewinding/ re-insulation of HT/ LT (primary/ secondary) coils, bushes, studs, Transformer oil, cable box, replacement of bucholtz relay/ MOG if any etc will be measured and paid separately. | 2 | Each Job | - | - |
| - | All as per Item No. 1 herein before but transformer/Voltage stabiliser indoor/ outdoor type of capacity up to 400 KVA to 500 KVA complete all as specified and directed by Engr-in-Charge. | 2 | Each Job | - | - |
| - | All as per Item No. 1 herein before but transformer/Voltage stabiliser indoor/ outdoor type of capacity up to 100 KVA to 315 KVA complete all as specified and directed by Engr-in-Charge. | 2 | Each Job | - | - |
| - | M&L for filtration of transformer oil of transformers/Servo voltage Stabilizer installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as specified and directed by Engr-in-Charge. | 5,400 | Litre | - | - |
| - | Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformers/Servo voltage Stabilizer etc at various locations complete all as specified and directed by Engr-in-Charge. Make: Power oil/ Transol/ Sabitha Chemicals as approved by GE. | 3,000 | Litre | - | - |
| - | M&L for rewinding of distribution transformers/AVR of capacity (100 KVA to 800 KVA)/ type by winding the low insulation/defective coils of Primary Coil (HT coil) with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and directed by Engr-in-Charge. Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items. | 300 | KG | - | - |
| - | M&L for rewinding of distribution transformers of capacity (100 KVA to 800 KVA)/ type by winding the low insulated/ defective coils of Secondary Coil (LT Coil) with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as specified and directed by Engr-in-Charge.
Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items. | 300 | KG | - | - |
| - | M&L for re-insulating windings of distribution transformers of capacity (100 KVA to 800 KVA) / size/ type by strip opening of HT/ LT coils (i.e. Primary/ secondary coils) from core assembly safely, unwinding the HT/ LT coils (i.e. Primary/ secondary coils) complete, removing the old defective insulation paper and replacing with new DPC insulation to the copper conductor, re-varnishing of the windings with super varnish including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 and complete all as specified and directed by Engr-in-Charge. | 200 | KG | - | - |
| - | Disconnection of the Distribution Transformer/AVR from HT and LT supply mains, removing of Bus duct and Bus bar, Leakage arresting to following transformers by draining out of oil, after arrangement of necessary empty oil drums, buckets etc., dismantling of top cover and accessories, dismantling of LT bushings by disconnecting leads/jumpers from inside, replacement of gaskets and oil seals and re fixing of the LT bushings, making internal and external connections, replacement of cover gasket and accessories, refixing of accessories and cover, filling of transformer oil complete, and making cable connections and for energising the transformer. NOTE :- (i) The Cost deems to include materials like gaskets and oil seals and labour complete all as specified and directed by Engr-in-Charge.
(ii) The Bushing and bushing rods to be measured and paid separately. | - | - | - | - |
| - | 500 kVA to 800 kVA | 5 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TD43.pdf
Tender Documents • 0.74 MB
BOQ_883813.xls
BOQ • 1.09 MB
AmendNO143.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .