Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All Documents Found Correct. |
| 2 | Accepted-Technical | Accepted-Technical All Documents Found Correct. |
| 3 | Accepted-Technical | Accepted-Technical All Documents Found Correct. |
Tender Value
Refer Docs
Closing Date
13 Sept 2026, 6:00 pmClosed
SE, WDSC, Ajmer
Office of SE, WDSC, Ajmer
Construction of Farm Pond, PT, Sunken Pond and CCT under MJSA 2.3 Block Srinagar Ajmer
2026_WDSC_594925_1
10/2026-27/Srinagar
Open Tender
Civil Works
Percentage
180 days
MJSA 2.3 Project Area Block Srinagar
Please refer Tender Documents
2 documents required · 2 mandatory
₹0
Exempted
18 Sept 2026
4 Sept 2026
14 Sept 2026
4 Sept 2026
13 Sept 2026
4 Sept 2026
4 Sept 2026 - 13 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Layout for excavation of trenches or/ V.Ditches/ Gradony or Contour Dykes or furrows. (Item no 2.1.3 of Forest BSR 2025) | 33,800 | Rmt | 0.91 | ₹30,758 |
| 2 | 15 से.मी. तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना। (Item No. 1 b | 6,552 | Sqm | 10.94 | ₹71,678.88 |
| 3 | Mkxcsy djuk 5 ls 7-5 ls-eh- xgjkA | 78,533.84 | Mtr | 1.71 | ₹1,34,292.87 |
| 4 | जंगल की सफाई भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। (item no. 192) | 1,59,857.12 | Sqm | 3.6 | ₹5,75,485.63 |
| 5 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। BSR 6 मशीनरी कार्य सख्त मिट्टी (in Hard Soil ) (Item No. 196 b | 1,18,522.33 | cum | 59.87 | ₹70,95,931.9 |
| 6 | Compaction of earth or highly weathered strata by manually or plain roller. (density 90% of Proctor). (Chapter V / Item No. 18a of WRD BSR 2026) | 8,035.41 | cum | 24.78 | ₹1,99,117.46 |
| 7 | Watering of earth including cost of carriage of water when source of water is Beyond 1 Km but up to 2 Km (Chapter V / Item No. 28b of WRD BSR 2026) | 8,035.41 | cum | 17.7 | ₹1,42,226.76 |
| 8 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी पत्थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित। (Item No. 10a) | 14.58 | cum | 3,183.98 | ₹46,422.43 |
| 9 | ,uhdV gsrq iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esa uho o dqlhZA (Item No. 166a) | 89.52 | cum | 2,810.63 | ₹2,51,607.6 |
| 10 | ,uhdV gsrq iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esaA vf/kjpuk esa (Item No. 166a) | 54.42 | cum | 2,810.63 | ₹1,52,954.48 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.87 MB
BOQ_1055485.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .