Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAdmitted-Finance | ₹8.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 Cr+₹1.2 Cr (13.4%)Admitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹10.0 Cr+₹1.2 Cr (13.4%) | L2 | Admitted-Finance |
| 3 | L3₹13.1 Cr+₹4.4 Cr (49.7%)Admitted-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹13.1 Cr+₹4.4 Cr (49.7%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GE Power India Limited L2 | Siemens Ltd. L3 | L&T MHI Power Generators private limited L1 |
|---|---|---|---|---|---|---|
| 1.00SECTION-A (WORK) | ||||||
| 1.01 | Repair of LP Rotor as per scope of Work. | 1 | Job | 1,84,79,028.37 ₹1,84,79,028.37 Lowest | 2,64,67,671.43 ₹2,64,67,671.43 | 3,36,56,040 ₹3,36,56,040 |
| 1.02 | Repair of IP Rotor as per scope of Work. | 1 | Job | 3,95,71,193.01 ₹3,95,71,193.01 | 4,62,27,977.97 ₹4,62,27,977.97 | 2,71,67,220 ₹2,71,67,220 Lowest |
| 1.03 | Repair of IP Inner Casing (Top Half+ Lower Half) as per scope of work. | 1 | Job | 3,53,35,835.97 ₹3,53,35,835.97 | 3,79,12,406.97 ₹3,79,12,406.97 | 2,33,46,830 ₹2,33,46,830 Lowest |
| 1.04 | Repair of LP Inner- Inner Casing as per scope of work | 1 | Job | 22,13,942.65 ₹22,13,942.65 Lowest | 53,22,823.58 ₹53,22,823.58 | 28,29,910 ₹28,29,910 |
| 2.00SECTION-B (SUPPLY-OPTIONAL) | ||||||
| 2.01 | MOVING BLADE L.P.1L | 1 | Nos. | 70,293 ₹70,293 Lowest | 6,03,717 ₹6,03,717 | 1,76,380 ₹1,76,380 |
| 2.02 | MOVING BLADE L.P.2L | 1 | Nos. | 1,49,838 ₹1,49,838 | 32,53,856 ₹32,53,856 | 1,35,760 ₹1,35,760 Lowest |
| 2.03 | MOVING BLADE L.P.3L | 1 | Nos. | 17,45,000 ₹17,45,000 | 38,84,259 ₹38,84,259 | 85,220 ₹85,220 Lowest |
| 2.04 | MOVING BLADE L.P.1R | 1 | Nos. | 70,293 ₹70,293 Lowest | 6,03,717 ₹6,03,717 | 1,76,380 ₹1,76,380 |
Tender Value
₹17.5 Cr
EMD Value
₹37 L
Closing Date
11 Oct 2021, 1:00 pmClosed
SE-II, BTPS, 2X210 MW, BTPS, PARICHHA TPS
OFFICE OF SE-II, BTPS, PARICHHA TPS
REPAIR OF IP ROTOR, IP INNER CASING, LP ROTOR AND LP INNER-OUTER CASING OF 210 MW KWU TURBINE
2021_RVUNL_562227_3
17/TMD/OMC-II/2X210 MW/BTPS/PTPP/2020-21
Open Tender
Power/Energy Projects/Products
Lump-sum
365 days
BTPS, PARICHHA TPS
As per tender PQC
2 documents required · 2 mandatory
₹5,310
Dy. CAO, CFA AND BO
₹37 L
30 Apr 2022
10 Jul 2021
13 Oct 2021
10 Jul 2021
11 Oct 2021
10 Jul 2021
10 Jul 2021 - 5 Oct 2021
Amount
SECTION-A (WORK)
Repair of LP Rotor as per scope of Work.
Repair of IP Rotor as per scope of Work.
Repair of IP Inner Casing (Top Half+ Lower Half) as per scope of work.
Repair of LP Inner- Inner Casing as per scope of work
SECTION-B (SUPPLY-OPTIONAL)
MOVING BLADE L.P.1L
MOVING BLADE L.P.2L
MOVING BLADE L.P.3L
MOVING BLADE L.P.1R
MOVING BLADE L.P.2R
MOVING BLADE L.P.3R
GE Power India Limited
Siemens Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TenderDocumentmr2U.pdf
Tender Documents • 34.33 MB
BOQ_931321.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .