Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC CHANDAN NAGAR OPP IOCL PERTROL PUMP RAMPUR ROAD BAREILLY UP 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹1.2 Cr Quoted ₹1.5 Cr | 1 | Accepted-AOC accept |
| 2 | 2₹1.7 Cr+₹19.5 L (13.2%)Rejected-AOC 00 OPP RASHMI HOSPITAL RAYA ROAD LAXMI NAGAR MATHURA UTTAR PRADESH 281204 | MATHURA | UTTAR PRADESH | 281204 | ₹1.7 Cr+₹19.5 L (13.2%) | 2 | Rejected-AOC reject |
| 3 | 3₹1.8 Cr+₹29.5 L (19.9%)Rejected-AOC | ₹1.8 Cr+₹29.5 L (19.9%) | 3 | Rejected-AOC reject |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
5 Feb 2024, 12:00 pmClosed
SE EWC
Bareilly
Construction of new 33 KV Line From 132/33 KV Sub Station-Banda to 33/11 KV Sub Station-Khutar
2024_MVVNL_887153_1
72/EWC(B)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Shahjahanpur
As per tender document
3 documents required · 3 mandatory
₹5,900
SE EWC
₹1.3 L
13 Dec 2024
29 Jan 2024
5 Feb 2024
29 Jan 2024
5 Feb 2024
29 Jan 2024
Amount
Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
33 KV 3X300mm2 XLPE Cable
33 KV 3X300mm2 XLPE Cable jointing kit O/D
33 KV 3X300mm2 XLPE Cable jointing kit S/through
ST pole 11 Mtr. Long
9.0 M long PCC pole
33 KV cross arm
33 KV pin insulator
33 KV pin with nut
M.S. Earthing rod
M.S angle 65x65x6mm, 2700mm
Top channel 125x65x6mm 3200mm
T- Off Channel 125x65x1300mm
ACSR Dog conductor
11 KV disc insulator B&S type 70 KN
Disc fitting Dog/Racoon 70 KN
Complete Stay set complete
Gaurding angle 65x65x2950
G.I wire 8 Swg
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of ST Pole 11mtr long.
Single support of PCC Pole 9mtr long.
Double pole structure on PCC Pole 9 mtr long complete with bracing.
Double pole structure on STP Pole 11 mtr long complete with bracing.
End type double pole structure on S.T. Pole 11mtr long complete with bracing.
Cable Exposer double pole structure on S.T. Pole 11mtr long complete with bracing.
Tri pole structure on ST Pole 11mtr long complete with bracing.
Four Pole structure on ST Pole 11mtr long complete with bracing.
Erection/fixing for stay set with stay wire and clamp as per RESSPO drawing including binding, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and brick ballast and sand before back filling of the pits as per RESSPO schedule all clamps, nuts & bolts, cement, brick, concrete etc would be provided by contractor.
Concreting of supports in 1:4:8 ratio and plinthing of supports upto 300mm above ground level by using cement ,brick ballast and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor.
Laying and sagging of 3 phase ACSR Dog conductor from 132/33 kv s/s lalpur (Banda) to 33/11 KV substation Khutar including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect.
Earthing of each S.T Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support & its accessories by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Fabrication and fixing of guarding angle on Single/double poles, Stringing and sagging of three nos. Earth/GI wire with cardle guarding of above 33 KV line as per RESSPO Norms including provision of all necessary clamps and hooks. Shifting of existing line conductor of 11 KV/LT line to maintain proper clearance in between both lines (all required material will be provided by the contractor except guarding angle and earth/GI wire).
Painting of following supports with one coat of red oxide primer and two coats of aluminum white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete the job.
Single Pole of S.T Pole .
Double Pole of S.T Pole .
Tri Pole of S.T Pole .
Four Pole of S.T Pole .
Fixing of danger board on each location and G.I barbed wire including proper clamping and providing anti climbing device by using including supply of the above items.
Write serial number on each pole in English with black paint in yellow paint background. (All material would be provided be firm.)
Laying of single circuit 33 KV 3X300 Sq. mm XLPE cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. Inter axial spacing between the two cable should be in between 0.25 m to 0.40m. (All the material required for laying will be supplied by the contractor except 33 KV XLPE cable)
Cable laying by drill method in single circuit ( All the material required for laying will be supplied by the contractor except 33 KV XLPE cable)
Single CKT cable laying by drill method in HDPE Pipe including cost of material (All the material required for laying will be supplied by the contractor except 33 KV XLPE cable)
Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI pipe of size 6" dia 3 M long including its jumpering complete with clamps, nuts and bolts.
Fixing of 33 KV O/D or I/D/ S/ THROUGH
Cable route marker of size 36X12X3 Inch
Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of Incharge.
M/s Shubham Traders
NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .