| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC Work Order | |
| 2 | L2₹4.9 L+₹19,752.99 (4.21%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹34,698.23 (7.40%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹6.1 L+₹1.5 L (31.2%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | Muthusalvam L3 | GOPAL & CO L2 | GTRandco L1 | P.Senthilkumar L4 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Horizontal Planted Filter with Anaerobic Baffle reactor - Type II for 20 KLD at Mylankattur H/O Sakthinaickenpalayam | |||||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 77.81 | Cum | 350 ₹27,233.5 | 263 ₹20,464.03 | 260 ₹20,230.6 Lowest | 280 ₹21,786.8 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.01 | Cum | 5,463 ₹43,758.63 | 5,463 ₹43,758.63 | 5,400 ₹43,254 Lowest | 6,000 ₹48,060 |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 42 | Sqm | 365 ₹15,330 | 365 ₹15,330 | 350 ₹14,700 Lowest | 550 ₹23,100 |
| 5.00 | Plain Cement Concrete 1:3:6 using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 6.3 | Cum | 6,217 ₹39,167.1 | 6,217 ₹39,167.1 | 6,000 ₹37,800 Lowest | 6,800 ₹42,840 |
| 6.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 11.26 | Cum | 7,355 ₹82,817.3 | 7,355 ₹82,817.3 | 7,150 ₹80,509 Lowest | 7,900 ₹88,954 |
| 7.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 67.11 | Sqm | 283 ₹18,992.13 | 283 ₹18,992.13 | 250 ₹16,777.5 Lowest | 350 ₹23,488.5 |
| 8.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 58.85 | Sqm | 640 ₹37,664 | 579 ₹34,074.15 | 550 ₹32,367.5 Lowest | 620 ₹36,487 |
| 9.00 | Supply and Filling ISS HBG 20mmMetal including cost and conveyance of all materials to site etc Complete | 2.88 | Cum | 2,095 ₹6,033.6 | 2,095 ₹6,033.6 | 2,000 ₹5,760 Lowest | 3,500 ₹10,080 |
| 10.00 | Supply and Filling ISS HBG 4 to 8mmMetal including cost and conveyance of all materials to site etc Complete | 16.32 | Cum | 1,283 ₹20,938.56 | 1,283 ₹20,938.56 | 1,200 ₹19,584 Lowest | 2,500 ₹40,800 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
28 Sept 2026, 3:00 pmClosed
Block Development Officer Elachipalayam
Block Development Office Elachipalayam
Construction of Horizontal Planted Filter with Anaerobic Baffle reactor - Type II for 20 KLD at Mylankattur H/O Sakthinaickenpalayam in Elachipalayam Block of Namakkal District under SBM(G)-II 2026-27 P1
2026_RDTN_705430_1
3103/2026/PA1 18.09.2026
Open Tender
Civil Works
Item Rate
120 days
Elachipalayam
As per Schedule
3 documents required · 3 mandatory
₹0
₹5,000
Yes
10 Oct 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Horizontal Planted Filter with Anaerobic Baffle reactor - Type II for 20 KLD at Mylankattur H/O Sakthinaickenpalayam | - | - | - | - |
| - | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 77.81 | Cum | - | - |
| - | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.01 | Cum | - | - |
| - | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 42 | Sqm | - | - |
| - | Plain Cement Concrete 1:3:6 using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 6.3 | Cum | - | - |
| - | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 11.26 | Cum | - | - |
| - | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 67.11 | Sqm | - | - |
| - | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 58.85 | Sqm | - | - |
| - | Supply and Filling ISS HBG 20mmMetal including cost and conveyance of all materials to site etc Complete | 2.88 | Cum | - | - |
| - | Supply and Filling ISS HBG 4 to 8mmMetal including cost and conveyance of all materials to site etc Complete | 16.32 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_847906.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_847906.xls
BOQ • 0.25 MB
TechnicalBid.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .