Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹63.2 L+₹0.06 (<0.01%)Accepted-AOC H O 62 BOKO CHAMARIYA ROAD VILL RAIPARA P O BOKO KAMRUP 781123 | BOKO | KAMRUP | ASSAM | 781123 | L2 | Accepted-AOC Awarded | |
| 2 | L1₹63.2 LRejected-Finance HOUSE NO 47 SUPRABHA PATH SIJUBARI P O HATIGAON P S HATIGAON DIST KAMRUP M GUWAHATI 38 | GUWAHATI | KAMRUP M | ASSAM | 781038 | L1 | Rejected-Finance Rejected. Refer to financial minutes | |
| 3 | L2₹63.2 L+₹0.06 (<0.01%)Rejected-Finance VILL HENGRABARI P O P S DISPUR DIST KAMRUP METRO PIN 781006 | DISPUR | KAMRUP METRO | ASSAM | 781006 | L2 | Rejected-Finance Rejected. Refer to financial minutes | |
| 4 | Rejected-Technical BARKHETRI BARNI P O BONGAON P S BELSOR DIST NALBARI ASSAM | BONGAON | NALBARI | ASSAM | - | Rejected-Technical Technically disqualified. Refer to technical minutes | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically disqualified. Refer to technical minutes |
Tender Value
₹66.5 L
EMD Value
₹1.3 L
Closing Date
12 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
Integrated water harvesting structure and distribution project at Barkacharang N.C under RIDF-XXVIII during 2022-23
2023_SCD_32631_10
Tender/NIT/Pt/2023-24/6166
Open Tender
Civil Works
Item Rate
90 days
Kamrup
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,330
₹1.3 L
Yes
6 Jan 2024
22 Sept 2023
13 Oct 2023
22 Sept 2023
12 Oct 2023
29 Sept 2023
Amount
Part - A : RCC Check Dam
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earth work in excavation of foundation trances of structure as per drawing & technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling with approved materials as per directed.
Plain Cement Concrete work in proportion 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing etc. completed as directed.
R.C.C. work in proportion 1:2:4: in all walls mixed with crushed stone aggregate 23 mm nominal size mechanically mixed & placed in all R.C.C. walls and completed by vibration including necessary shuttering as per technical specification and drawings.
Supplying fitting fixing of TMT reinforcement bar in sturcture as per drawing and technical specifications as directed.
Cement plastering on exposed side walls etc. of R.C.C. Drop Spill Way structure of 12mm thick in prop. 1:3 as per technical specifications and directed.
Earth work by head load in filling in front of the structure, guide bund etc. with all leads 60 m including ramming, cambering, sectioning with approved quality materials, sprinkling water ramming from the height 0.90 m with hammer not less than 60 kg weight as per drawing and technical specification.
Providing and laying boulder apron on gully bed in up-stream and down-stream of R.C.C. structure for protection against scour with stone boulders weighing not less than 40 kg. (man size) each complete as per drawing and technical specifications.
Earth work in excavation of foundation of boulder revetment as per drawing and technical specifications.
Providing and laying boulder apron laid in wire crates maid with 4mm dia GI wire conforming to IS : 280 & IS: 4826 in 100 mm x 100 mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg. each etc. complete as per drawing and technical specifications.
Construction of Guide Bund with approved material obtained from borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 etc complete as per drawings and technical specifications. (12.50 % will be deducted on the total volume for shrinkage of soil).
Furnishing and laying of live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground.
Construction of installation of Tube Well
Providing fitting & fixing 1 no. RCC singboard at the project site.
Part - B : RCC Check Dam
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earth work in excavation of foundation trances of structure as per drawing & technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling with approved materials as per directed.
Plain Cement Concrete work in proportion 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing etc. completed as directed.
R.C.C. work in proportion 1:2:4: in all walls mixed with crushed stone aggregate 23 mm nominal size mechanically mixed & placed in all R.C.C. walls and completed by vibration including necessary shuttering as per technical specification and drawings.
Supplying fitting fixing of TMT reinforcement bar in sturcture as per drawing and technical specifications as directed.
Cement plastering on exposed side walls etc. of R.C.C. Drop Spill Way structure of 12mm thick in prop. 1:3 as per technical specifications and directed.
Earth work by head load in filling in front of the structure, guide bund etc. with all leads 60 m including ramming, cambering, sectioning with approved quality materials, sprinkling water ramming from the height 0.90 m with hammer not less than 60 kg weight as per drawing and technical specification.
Providing and laying boulder apron on gully bed in up-stream and down-stream of R.C.C. structure for protection against scour with stone boulders weighing not less than 40 kg. (man size) each complete as per drawing and technical specifications.
Earth work in excavation of foundation of boulder revetment as per drawing and technical specifications.
Providing and laying boulder apron laid in wire crates maid with 4mm dia GI wire conforming to IS : 280 & IS: 4826 in 100 mm x 100 mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg. each etc. complete as per drawing and technical specifications.
Construction of Guide Bund with approved material obtained from borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 etc complete as per drawings and technical specifications. (12.50 % will be deducted on the total volume for shrinkage of soil).
Furnishing and laying of live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground.
Construction of installation of Tube Well
Providing fitting & fixing 1 no. RCC singboard at the project site.
Part - C : RCC Check Dam
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earth work in excavation of foundation trances of structure as per drawing & technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling with approved materials as per directed.
Plain Cement Concrete work in proportion 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing etc. completed as directed.
R.C.C. work in proportion 1:2:4: in all walls mixed with crushed stone aggregate 23 mm nominal size mechanically mixed & placed in all R.C.C. walls and completed by vibration including necessary shuttering as per technical specification and drawings.
Supplying fitting fixing of TMT reinforcement bar in sturcture as per drawing and technical specifications as directed.
Cement plastering on exposed side walls etc. of R.C.C. Drop Spill Way structure of 12mm thick in prop. 1:3 as per technical specifications and directed.
Earth work by head load in filling in front of the structure, guide bund etc. with all leads 60 m including ramming, cambering, sectioning with approved quality materials, sprinkling water ramming from the height 0.90 m with hammer not less than 60 kg weight as per drawing and technical specification.
Providing and laying boulder apron on gully bed in up-stream and down-stream of R.C.C. structure for protection against scour with stone boulders weighing not less than 40 kg. (man size) each complete as per drawing and technical specifications.
Earth work in excavation of foundation of boulder revetment as per drawing and technical specifications.
Providing and laying boulder apron laid in wire crates maid with 4mm dia GI wire conforming to IS : 280 & IS: 4826 in 100 mm x 100 mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg. each etc. complete as per drawing and technical specifications.
Construction of Guide Bund with approved material obtained from borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 etc complete as per drawings and technical specifications. (12.50 % will be deducted on the total volume for shrinkage of soil).
Furnishing and laying of live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground.
Construction of installation of Tube Well
Providing fitting & fixing 1 no. RCC singboard at the project site.
Part - D : Brick Canal
Site Clearance as directed.
Earth work in excavation of foundation of Structure as per drawing and technical specification and specified.
Providing soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panel after Brick on flat soling as specified.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete as directed.
Plain/ Reinforced cement concrete inn open foundation complete as per drawing and technical specification. Random rubble masonry.
Cost of Reinforcement Supplying, fitting & placing TMT CRS (Fe-500) bar reinforcement in substructure complete as per drawing & technical specifications.
Brick masonry work in 1:3 in sub structure complete as per technical specification and directed.
Cement plastering with cement morter (1:3) on R.C.C. works as per technical specifications. Thickness of plastering = 12 mm.
Construction of installation of Tube Well
Providing fitting & fixing 1 no. RCC singboard at the project site.
Pranjal Boro
JAYANTA KALITA
stage.html
html • 0.05 MB
techsummary_52357.pdf
PDF • 1.18 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_52357.pdf
PDF • 1.88 MB
BarkacharangAOC.pdf
PDF • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .