| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.3 LAccepted-AOC 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹51.3 L Quoted ₹51.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹54.5 LRejected-Finance 8 402 SITAPUR ROAD JANKIPURAM VISTAR LUCKNOW | LUCKNOW | ₹54.5 L | L2 | Rejected-Finance REJECTED BEING HIGHER RATES. |
| 3 | L3₹54.6 LRejected-Finance 6 953 VIKASH NAGAR LUCKNOW | ₹54.6 L | L3 | Rejected-Finance REJECTED BEING HIGHER RATES. |
Tender Value
₹58 L
EMD Value
₹4.9 L
Closing Date
10 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
Construction of Teriya to Chuglahar Missing Link Road
2026_CEUCZ_1121657_15
900 /MT / 1MT / E-Tendring / Unnao Circle /2026 Dated - 21.02.2026
Open Tender
Civil Works - Roads
180 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹4.9 L
Yes
27 May 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST)
Providing ,Laying and spreading material on a prepared subgrade ,adding cement @ 2 % by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. (Rates are Including Labour Cess but Excluding GST)
Providing ,Laying and spreading material on a prepared subbase ,cement @ 4 % by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Rates are Including Labour Cess but Excluding GST)
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1 (Rates are Including Labour Cess but Excluding GST)
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rates are Including Labour Cess but Excluding GST)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (Rates are Including Labour Cess but Excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Rates are Including Labour Cess but Excluding GST)
Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Rates are Including Labour Cess but Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Rates are Including Labour Cess but Excluding GST)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (3 No. x 2.50 Mt = 7.50 Mt) (1000 mm dia RCC NP-3 hume pipe) (Rates are Including Labour Cess but Excluding GST)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600,603,604, 1202 & 1204 (Rates are Including Labour Cess but Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Rates are Including Labour Cess but Excluding GST)
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion Maintenance @ 0.75 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 3rd Year after the Actual Date of Completion Maintenance @ 1.50 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 4th Year after the Actual Date of Completion Maintenance @ 2.25 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification. (Rates are Including Labour Cess but Excluding GST) for 5th Year after the Actual Date of Completion Maintenance @ 3.00 %
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
T2ETENDER.pdf
Tender Documents • 0.47 MB
BOQ_2087188.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid