Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC | L1 | Accepted-AOC Awarded Being Lowest Bidder | |
| 2 | L2₹12.8 L+₹42,836 (3.46%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹13.1 L+₹74,259 (6.00%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
13 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer North Ahmednagar
Military Engineer Services Garrison Engineer North Opp Ahmednagar Fort Ahmednagar - 414 002
Repair / Maint of mechanical transport vehicle Eicher 10.75 Tata 407 Tata 207 DI Maruti Swift Motorcycles under GE (N) Ahmednagar
2022_MES_530187_3
8628 / E8
Open Tender
Miscellaneous Works
Item Rate
180 days
Ahmednagar
Class E d (vi)
8 documents required · 8 mandatory
₹500
Yes
Garrison Engineer North Ahmednagar
₹25,000
Yes
22 Aug 2022
25 Jul 2022
15 Aug 2022
25 Jul 2022
13 Aug 2022
1 Aug 2022
Amount
Dismantling and disconnecting of unserviceable parts of Tata Mobile 207 (Model of 2004,2009) reinstalling after repair/replacement of unserviceable parts etc complete all as specified and directed by Engineer-in-Charge. NOTE: Spare parts required to be replaced shall be measured and paid separately as mentioned here-in-below.
Engine oil
Oil filter element
Diesel filter element (set of two)
Air filter
Disc pad
Brake Shoe
Front wheel bearing
Rear wheel bearing
Front shokers
Brake oil
Door lock driver side
Door lock rear door
Counter Shaft
Top gear
Gear Bearing
Synchronizing ring
Gear Oil
Gear Oil Seal
Gear Chain Kit
Fan Belt
Water Body Assy.
Tie rod end
Bush kit complet
Ball joint assembly
Diesel pipe
Yoke and teeth
Shaft Nuts and Bolts
Door Glass Rolling Machine
Engine mounting
U.J cross
Fly wheel Ring
Self stater assembly
Windshield with rubber beading
Head light assembly complete with bulb
Tail light assembly complete with bulb
Main leaf spring
Leaf spring 2nd No
Leaf Spring 4th No
Leaf Spring clump
Nuts and Bolts with washer
Centre Bolts
U- Bolts
Wiper Arm & Blade
Alternator rectifier
Alternator rotor assy
Side view Mirror
Front indicator assembly
Rear indicator assembly
Ignition cum lock switch
Clutch cylinder assy upper
Clutch cylinder assy lower
Master cylinder assy
Clutch Plate
Pressure plate assy
Clutch release bearing
Dismantling of four wheels by greasing of four wheels including replacement of oil seal and reassembling etc complete all as specified and directed by Engineer-in-Charge
Repair to gear by replacing main gear shaft, counter shaft, 2/3rd gear, syncronising ring etc work etc complete all as specified and directed by Engineer-in-Charge
Repair of seat complete including replacement of best quality Rexign seat cover,foot mating , U foam & spring etc complete all as specified and directed by Engineer-in-Charge
Alignment of wheel completely by computerized machine etc complete all as specified and directed by Engineer-in-Charge
Cleaning of radiator assy complete by opening both tanks & cleaning the fins of the radiator by chemical and stopping the leakage by gas welding wherever required etc complete all as specified and directed by Engineer-in-Charge
Repair to FIP pump by over hauling the FIP and replacing all the spares of the FIP with the new spares and testing complete on machine etc complete all as specified and directed by Engineer-in-Charge
Repair to Alternator by replacing carbon brush etc complete all as specified and directed by Engineer-in-Charge
Dismentling of Fuel tank assy complete from the vehicle and cleaning by pressure and refitting etc complete all as specified and directed by Engineer-in-Charge
Denting and painting of vehicle, including welding wherever required etc complete all as specified and directed by Engineer-in-Charge
Dismantling and disconnecting of unserviceable parts of Tata 407( Model of 1999) reinstalling after repair/replacement of unserviceable parts complete to entire satisfaction etc complete all as specified and directed by Engineer-in-Charge. NOTE: Spare parts required to be replaced shall be measured and paid separately as mentioned here-in-below.
Engine oil
Oil filter element
Diesel filter element (set of two)
Air filter
Disc pad
Brake Shoe
Front wheel bearing
Rear wheel bearing
Front shokers
Brake oil
Door lock driver side
Door lock rear door
Gear Bearing
Gear Oil
Gear Oil Seal
Gear Jain Kit
Fan Belt
Water Body Assy.
Tie rod end
Bush kit complet
Ball joint assembly
Diesel pipe
Yoke and teeth
Shaft Nuts and Bolts
Door Glass Rolling Machine
Engine mounting
U.J cross
Fly wheel Ring
Main leaf spring
Leaf spring 2nd No
Leaf Spring 3rd No
Leaf Spring clump
Nuts and Bolts with washer
Centre Bolts
U- Bolts
Wiper Arm & Blade
Alternator rectifier
Side view Mirror
Front indicator assembly
Rear indicator assembly
Ignition cum lock switch
Clutch Plate
Clutch release bearing
Head light assembly complete with bulb
Tail light assembly complete with bulb
Door handle with Lock assembly
Dismantling of four wheels by greasing of four wheels including replacement of oil seal and reassembling etc complete all as specified and directed by Engineer-in-Charge
Repair of seat complete including foot mating replacement of best quality Rexign, U foam & spring etc complete all as specified and directed by Engineer-in-Charge
Alignment of wheel completely by computerized machine etc complete all as specified and directed by Engineer-in-Charge
Cleaning of radiator assy complete by opening both tanks & cleaning the fins of the radiator by chemical and stopping the leakage by gas welding wherever required etc complete all as specified and directed by Engineer-in-Charge
Repair to Alternator by replacing carbon brush etc complete all as specified and directed by Engineer-in-Charge
Repair and servicing of stearing and parts etc complete all as specified and directed by Engineer-in-Charge
Dismantling and disconnecting of U/S parts of Motor Cycle Hero Honda (Model of 2004). Reinstalling after repair/replacement of U/S parts etc complete all as specified and directed by Engineer-in-Charge. NOTE: Spare parts required to be replaced shall be measured and paid separately as mentioned here-in-below.
Engine oil
Chain and chain sprocket.
Spark plug
Clutch plate
Shock absorber
Lock set complete
Speedo meter cable with ,clutch cable
Head light assy
Carburetor assy
Brake Shoe
Brake cable complete
Replacement of seat cover
Dismantling and disconnecting of unserviceable parts of EICHER 10.75 ( Model of 2004,2009,2014) and re-installing after repair/replacement of unserviceable parts etc complete all as specified and directed by Engineer-in-Charge.. NOTE: Spare parts required to be replaced shall be measured and paid separately as mentioned here-in-below.
Engine Oil
Oil filter element
Fuel filter element (set of two)
Hydraulic Oil
Door Handle with lock assembly
Door Handle
Coolant
Front Indicating light assly with bulb
Wheel bearing
Wheel cylinder assy
Break Shoe
Side view mirror
Head light assy complete with bulb (Halogen type)
Bumper corner
Door strip set
Self Starter Assy
Door Glass Rolling Machine
Window glass with beading
Alternator carbon bush
Rectifier assy.
Alternator bearing
Back light assy. complete
Indicator assy.
Cutout 12 volts
Flasher
Main leaf spring
Leaf spring 3rd No
Leaf Spring 4th No
Leaf Spring clump
Nuts and Bolts with washer
Centre Bolts
U- Bolts
Wiper Arm & Blade
Ignition cum lock switch
Clutch cylinder assy upper
Clutch cylinder assy lower
Master cylinder assy
Clutch Plate
Pressure plate assy
Clutch release bearing
Fan Belt
Water Body Assy.
Tie rod end
Diesel pipe
UJ cross
Transmission shaft with Yoke & teeth complete
Counter shaft
Top Gear
Gear Bearing
Synchronizing Ring
Fuel tank cleaning
Gear oil
Gear oil seal
Gear Jain Kit
Main Gear shaft
1st gear shaft
2nd gear shaft
3rd gear shaft
Draglink rod
Baby Filter
Repair of self starter by replacing of self bendex, carbon bush set, solenoid switch etc complete all as specified and directed by Engineer-in-Charge.
Dismantling the load springs and refitting after repair and giving suitable tensioning etc complete all as specified and directed by Engineer-in-Charge.
Repair to FIP pump by over hauling the FIP and replacing all the spares of the FIP with the new spares and testing complete on machine etc complete all as specified and directed by Engineer-in-Charge.
Dismantling of four wheels complete by greasing of four wheels including replacement of oil seal and re-assembling etc complete all as specified and directed by Engineer-in-Charge.
Setting of wheel alignment and setting of brake system including filling of brake fluid in master cylinder kit etc complete all as specified and directed by Engineer-in-Charge.
Repair of seat complete including replacement of best quality Rexign, U foam & spring etc complete all as specified and directed by Engineer-in-Charge.
Overhauling, greasing of King pin including replacement of oil seal etc complete all as specified and directed by Engineer-in-Charge.
Denting and painting of vehicle, including welding wherever required etc complete all as specified and directed by Engineer-in-Charge.
Dismentling of Fuel tank assy complete from the vehicle and cleaning by pressure and refitting etc complete all as specified and directed by Engineer-in-Charge.
Alignment of wheel completely by computerized machine etc complete all as specified and directed by Engineer-in-Charge.
Cleaning of radiator assy complete by opening both tanks & cleaning the fins of the radiator by chemical and stopping the leakage by gas welding wherever required etc complete all as specified and directed by Engineer-in-Charge.
Repair to Alternator by replacing carbon brush etc complete all as specified and directed by Engineer-in-Charge.
Dismantling the load springs and refitting after repair and giving suitable tensioning etc complete all as specified and directed by Engineer-in-Charge.
Repair and servicing of stearing and parts all as specified and directed by Engg-in-charge.
Dismantling and disconnecting of unserviceable parts of Suzuki Dzire (Model of 2019) and re-installing after repair/replacement of unserviceable parts etc complete all as specified and directed by Engineer-in-Charge.. NOTE: Spare parts as mentioned in item No. 5.05 to 5.08 required to be replaced shall be measured and paid separately as mentioned here-in-below.
Engine Oil
Oil filter element
Fuel filter element
Coolant
Carpet mat
Mud flap
Stearing cover
Denting and painting of vehicle, including welding wherever required etc complete all as specified and directed by Engineer-in-Charge.
Supply and fixing in replacement of maintenance free battery 12 volt 80 Ah including battery leads and initial charging of battery. Make:- Exide/ Amron etc complete all as specified and directed by Engineer-in-Charge.
Supply only Distilled water for battery etc complete all as specified and directed by Engineer-in-Charge.
Supply and fixing of stickers for Command sign,Rafter number, unit name on front and back side and maintenance day. Note- Size and design will be as per direction of Engineer in charge.
Supply and fixing of PVC acrylic sheet duly stickered vehicle BA Number. Note- Size and design will be as per direction of Engineer in charge.
Supply only new tool kit including Ring Spanner set,big Screw driver,Plier,Hammer,Hydrolic jack with steel rod etc suitable for Eicher etc complete all as specified and directed by Engineer-in-Charge..
Supply only Acid suitable for batteries etc complete all as specified and directed by Engineer-in-Charge.
Hand-operated Grease Gun,Heavy Duty Single Pump Pressure for Maximum 6inch Pipe hose for Auto Repair Tool Vehicles Manual Pump (400 g Pack of 1) etc complete all as specified and directed by Engineer-in-Charge.
Supply only fast battery charger suitable for existing vehicle battery 12 Volt and upto 200 Ah capacity etc complete all as specified and directed by Engineer-in-Charge..
Supply only Portable battery check tester range 4 to 500, 12 Volt etc complete all as specified and directed by Engineer-in-Charge.
Supply only Tyre Pressure Gauge HTC checking meter with rubber hose, range upto 150 PSI etc complete all as specified and directed by Engineer-in-Charge.
Supply and Fix Tarpoline with rope for Eicher/Tata 407 etc complete all as specified and directed by Engineer-in-Charge.
Supply and fix Tyre suitable for Eicher 10.75,of size 750-16 etc complete all as specified and directed by Engineer-in-Charge.
Supply and fix Tyre suitable for TATA MOB 207 DI,of size 235/70 R-16 etc complete all as specified and directed by Engineer-in-Charge.
An amount of Rs 16,788.00 shall be deducted from BOQ on account of schedule of credit
L.T Associate
Pratap enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .