Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 CrAccepted-AOC KALU BASS SHRI DUNGARGARH BIKANER RAJASTHAN 331803 | BIKANER | BIKANER | RAJASTHAN | 331803 | ₹14.8 Cr | L1 | Accepted-AOC Being lowest bidder and reasonable bid |
| 2 | L2₹15.5 Cr+₹72.4 L (4.89%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹15.5 Cr+₹72.4 L (4.89%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹15.7 Cr+₹90.0 L (6.09%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹15.7 Cr+₹90.0 L (6.09%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹15.8 Cr+₹1.0 Cr (6.88%)Rejected-Finance 20 SC BOSE COLONY GALL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹15.8 Cr+₹1.0 Cr (6.88%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹17.2 Cr+₹2.4 Cr (16.3%)Rejected-Finance | ₹17.2 Cr+₹2.4 Cr (16.3%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | NITYA NAND AND SONS CONTRACTORS PVT LTD L9 | M K ENGINEERS CO. L4 | SATYA PRAKASH BUILDERS LTD L10 | Raja enterprises L5 | JASPAL SINGH & CONST L7 | M/s R L PAREEK L1 | Roshan Lal Talwar L2 | Jasraj & Company L3 | BHASHA INFRA PVT LTD L6 | M/s Khialdas Constructions L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer schedule 'A' notes before quoting the tender. (ii) Amount of Schedule of credit shall be deducted off line by the department. | |||||||||||||
| 2.00 | Demolition for Cement Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level), complete all as specified and directed. | 283.95 | Cum | 600 ₹1,70,370 | 300 ₹85,185 | 1,500 ₹4,25,925 | 345 ₹97,962.75 | 340 ₹96,543 | 140 ₹39,753 Lowest | 275 ₹78,086.25 | 500 ₹1,41,975 | 600 ₹1,70,370 | 450 ₹1,27,777.5 |
| 3.00 | Demolition for Brick work or stone/boulder masonry, built in cement mortar or cement lime mortar, complete all as specified and directed. | 337.8 | Cum | 420 ₹1,41,876 | 300 ₹1,01,340 | 1,200 ₹4,05,360 | 340 ₹1,14,852 | 250 ₹84,450 | 140 ₹47,292 Lowest | 275 ₹92,895 | 500 ₹1,68,900 | 500 ₹1,68,900 | 360 ₹1,21,608 |
| 4.00 | Removing Building Materials in ground floors exc. 500m but n. exc. 1.5 KM and depositing where complete all as specified and directed | 457.98 | Metric Tonne | 500 ₹2,28,990 | 500 ₹2,28,990 | 500 ₹2,28,990 | 375 ₹1,71,742.5 | 700 ₹3,20,586 | 100 ₹45,798 Lowest | 205 ₹93,885.9 | 200 ₹91,596 | 180 ₹82,436.4 | 270 ₹1,23,654.6 |
| 5.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in Hard Dense Soil complete all as specified and directed | 806.28 | Cum | 150 ₹1,20,942 | 50 ₹40,314 | 150 ₹1,20,942 | 62 ₹49,989.36 | 160 ₹1,29,004.8 | 40 ₹32,251.2 Lowest | 70 ₹56,439.6 | 100 ₹80,628 | 200 ₹1,61,256 | 54 ₹43,539.12 |
| 6.00 | Earth work in all kind of soil excavation by mechanical means (Hydraulic excavator) means over areas (exc. 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed | 31,207.99 | Cum | 240 ₹74,89,917.6 | 140 ₹43,69,118.6 | 225 ₹70,21,797.75 | 140 ₹43,69,118.6 | 187 ₹58,35,894.13 | 130 ₹40,57,038.7 | 200 ₹62,41,598 | 150 ₹46,81,198.5 | 120 ₹37,44,958.8 Lowest | 225 ₹70,21,797.75 |
| 7.00 | Earth work in all kind of soil excavation by mechanical means (Hydraulic excavator) means over areas (exc. 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift from 1.5m to 3.0m depth, complete all as specified and directed | 4,607.07 | Cum | 330 ₹15,20,333.1 | 200 ₹9,21,414 | 250 ₹11,51,767.5 | 225 ₹10,36,590.75 | 250 ₹11,51,767.5 | 140 ₹6,44,989.8 Lowest | 240 ₹11,05,696.8 | 170 ₹7,83,201.9 | 160 ₹7,37,131.2 | 234 ₹10,78,054.38 |
| 8.00 | M & L Cement concrete in foundations, filling and mass concrete 1:4:8 Type D-2 using 40 mm graded aggregate complete all as specified and directed | 75.89 | Cum | 6,300 ₹4,78,107 | 3,500 ₹2,65,615 Lowest | 5,200 ₹3,94,628 | 4,400 ₹3,33,916 | 4,660 ₹3,53,647.4 | 4,300 ₹3,26,327 | 3,930 ₹2,98,247.7 | 3,800 ₹2,88,382 | 5,300 ₹4,02,217 | 5,040 ₹3,82,485.6 |
| 9.00 | M & L RCC- M-25 (Design Mix) using 20mm graded aggregate For Foundation, Including rafts as Mass Concrete complete all as specified and directed | 2,370.7 | Cum | 6,600 ₹1,56,46,620 | 5,000 ₹1,18,53,500 Lowest | 7,100 ₹1,68,31,970 | 6,400 ₹1,51,72,480 | 6,100 ₹1,44,61,270 | 5,800 ₹1,37,50,060 | 5,600 ₹1,32,75,920 | 5,900 ₹1,39,87,130 | 7,500 ₹1,77,80,250 | 7,200 ₹1,70,69,040 |
| 10.00 | M & L Form work for rough finished surfaces of concrete measured flat for foundation complete all as specified and directed | 2,812.43 | Sqm | 210 ₹5,90,610.3 | 250 ₹7,03,107.5 | 350 ₹9,84,350.5 | 270 ₹7,59,356.1 | 340 ₹9,56,226.2 | 200 ₹5,62,486 Lowest | 230 ₹6,46,858.9 | 250 ₹7,03,107.5 | 200 ₹5,62,486 Lowest | 360 ₹10,12,474.8 |
Tender Value
₹20.0 Cr
EMD Value
₹13.3 L
Closing Date
27 Jun 2026, 6:00 pmClosed
Chief Engineer Bhopal Zone
HQ CHIEF ENGR BHOPAL ZONE, MES SI LINE BHOPAL 462001
PROVISION OF AREA DRAINAGE AT POCKET 1 and 2 AT BAIRAGARH
2026_MES_768674_1
CEBZ/BPL/TOKEN/06 OF 2026-27
Open Tender
Civil Works
Item Rate
450 days
Dronachal
As per NIT Document
6 documents required · 6 mandatory
₹3,000
GE Dronachal
₹13.3 L
Bhopal
24 Jul 2026
29 May 2026
29 Jun 2026
29 May 2026
27 Jun 2026
20 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolition for Cement Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level), complete all as specified and directed. | 283.95 | Cum | - | - |
| 3 | Demolition for Brick work or stone/boulder masonry, built in cement mortar or cement lime mortar, complete all as specified and directed. | 337.8 | Cum | - | - |
| 4 | Removing Building Materials in ground floors exc. 500m but n. exc. 1.5 KM and depositing where complete all as specified and directed | 457.98 | Per Load | - | - |
| 5 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in Hard Dense Soil complete all as specified and directed | 806.28 | Cum | - | - |
| 6 | Earth work in all kind of soil excavation by mechanical means (Hydraulic excavator) means over areas (exc. 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed | 31,207.99 | Cum | - | - |
| 7 | Earth work in all kind of soil excavation by mechanical means (Hydraulic excavator) means over areas (exc. 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift from 1.5m to 3.0m depth, complete all as specified and directed | 4,607.07 | Cum | - | - |
| 8 | M & L Cement concrete in foundations, filling and mass concrete 1:4:8 Type D-2 using 40 mm graded aggregate complete all as specified and directed | 75.89 | Cum | - | - |
| 9 | M & L RCC- M-25 (Design Mix) using 20mm graded aggregate For Foundation, Including rafts as Mass Concrete complete all as specified and directed | 2,370.7 | Cum | - | - |
| 10 | M & L Form work for rough finished surfaces of concrete measured flat for foundation complete all as specified and directed | 2,812.43 | Sqm | - | - |
| 11 | M & L RCC- M-25 (Design Mix) using 20mm graded aggregate For RCC Wall complete all as specified and directed | 2,640.8 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_860815.xls
BOQ • 0.32 MB
PDF.pdf
Tender Documents • 1.63 MB
corr4.pdf
PDF • 0.09 MB
corr2.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .