Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
30 Oct 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
Construction of Boundary wall at New LPG Plant at Abu road, Rajasthan.
20000527-HD-10157
20000527-HD-10157
Open Tender
Two Bid
Sirohi, Rajasthan
₹0
₹10 L
30 Oct 2020
8 Oct 2020
30 Oct 2020
30 Oct 2020
9 Oct 2020 - 19 Oct 2020
20 Oct 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVATION W/BACKFILL | EXCAVATION W/BACKFILL — EXCAVATION AND BACKFILLING:EARTHWORK IN EXCAVATION BELOW GROUND LEVEL IN ALL KINDS OF SOILS UPTO HARD STRATA TO A MAXIMUM DEPTH OF 1.5 M BELOW EXISTING FGL; STAKING OUT OF WORK AS PER SPECIFICATIONS; TAKING SPOT LEVELS ON EDGES AND CENTERLINE AT 3M C/C AS PER SPECIFICATIONS; BAILING OUT OF WATER IF ENCOUNTERED; PROVIDING SIDE STRUTTING AS REQUIRED AS PER SITE CONDITION, SEGREGATING THE EXCAVATED EARTH IN TO SERVICEABLE AND UNSERVICEABLE EARTH AS PER INSTRUCTIONS OF HPCL EIC; STACKING THE SERVICEABLE EARTH SEPARATELY WITHIN PLANT PREMISES FOR ENABLING REUSE FOR BACKFILLING OR ANY OTHER PURPOSE AS PER INSTRUCTIONS OF HPCL; CARTING AWAY AND DISPOSING THE UNSERVICEABLE EARTH AND DISPOSING OFF BEYOND PLANT BOUNDARIES TO SUITABLE DUMPING SPOTS/UNOBJECTIONABLE PLACES; OBTAINING APPROVAL FROM MINING DEPARTMENT/APPLICABLE DEPARTMENTS; LOADING AT HPCL PREMISES; TRANSPORTATION TO DUMPING SPOTS/UNOBJECTIONABLE PLACES; UNLOADING AND LEVELLING AT DUMPING SPOTS/UNOBJECTIONABLE PLACES; CONTRACTOR SHALL ENSURE THAT THERE ARE NO CLAIMS FROM ANY PARTY TOWARDS DUMPING OF EARTH; INCLUDING BACKFILLING IN ALL POSITIONS, IN LAYERS AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED, IN FOUNDATION PITS AND OTHER PLACES. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THEORETICAL VOLUME ONLY AND IT SHALL BE THE VOLUME OF THE BLOCK OF THE EXCAVATION HAVING MAXIMUM BOTTOM DIMENSION OF THE FOUNDATION AS PER DRAWING AND TO ACTUAL DEPTH.QUOTED RATES ARE DEEMED TO INCLUDE TRANSPORTATION AND DISPOSAL OF UNSERVICEABLE EARTH AND BOULDERS FOR ALL LEADS OUTSIDE PLANT BOUNDARY BUT QTTY DISPOSED OFF WILL BE USED IN EARTH RECONCILIATION AFTER DEDUCTING 30% FOR VOIDS.THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SIDE SLOPE AND BACKFILLING THE SAME. EXISTING GROUND LEVEL/T.L SHALL BE RECORDED JOINTLY BEFORE STARTING OF EXCAVATION. COST TOWARDS DEWATERING OF SURFACE OR SUBSOIL WATER SHALL BE DEEMED TO HAVE INCLUDED IN THE QUOTED RATE.BACKFILLING TO BE DONE WITH SERVICEABLE AND REUSABLE SOILS AVAILABLE FROM EXCAVATION AND STACKED EARLIER WITHIN THE PLANT BOUNDARY INCLUDING RE-EXCAVATING, SHIFTING TO THE SITE OF BACKFILLING, BACKFILLING IN LAYERS; WATERING; COMPACTING; TESTING TO ACHIEVE 95% MDD AS PER LAB RESULTS ALL COMPLETE AS PER INSTRUCTIONS OF HPCL.NOTE: DURING EXCAVATION OPERATIONS, THE BOULDERS MAY DAMAGE TYRES OF THE AUTOMOBILES/EARTH MOVING MACHINERY WHICH SHALL BE TAKEN CARE BY CONTRACTOR WHILE QUOTING HIS RATES. | - | Cubic Meters |
| 2 | EXCAVATION W/BACKFILL 1.5- 12110-JODHPUR LPG RO | EXCAVATION W/BACKFILL 1.5- 12110-JODHPUR LPG RO — EXCAVATION AND BACKFILLINGEARTHWORK IN EXCAVATION BELOW GROUND LEVEL IN ALL KINDS OF SOILS UP TO HARD STRATA TO A MAXIMUM DEPTH OF 1.5 TO 3 M BELOW EXISTING FGL;STAKING OUT OF WORK AS PER SPECIFICATIONS; TAKING SPOT LEVELS ON EDGES AND CENTERLINE AT 3M C/C AS PER SPECIFICATIONS; BAILING OUT OF WATER IF ENCOUNTERED; PROVIDING SIDE STRUTTING AS REQUIRED AS PER SITE CONDITION, SEGREGATING THE EXCAVATED EARTH IN TO SERVICEABLE AND UNSERVICEABLE EARTH; STACKING THE SERVICEABLE EARTH SEPARATELY WITHIN PLANT PREMISES FOR ENABLING REUSE FOR BACKFILLING OR ANY OTHER PURPOSE AS PER INSTRUCTIONS OF HPCL; CARTING AWAY AND DISPOSING THE UNSERVICEABLE EARTH AND DISPOSING OFF BEYOND PLANT BOUNDARIES TO SUITABLE DUMPING SPOTS/UNOBJECTIONABLE PLACES; OBTAINING APPROVAL FROM MINING DEPARTMENT/APPLICABLE DEPARTMENTS; ALL APPLICABLE PAYMENTS INCLUDING LOADING AT HPCL PREMISES; TRANSPORTATION TO DUMPING SPOTS/UNOBJECTIONABLE PLACES; UNLOADING AND LEVELLING AT DUMPING SPOTS/UNOBJECTIONABLE PLACES; INCLUDING BACKFILLING IN ALL POSITIONS, IN LAYERS AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED, IN FOUNDATION PITS AND OTHER PLACES. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THEORETICAL VOLUME ONLY AND IT SHALL BE THE VOLUME OF THE BLOCK OF THE EXCAVATION HAVING MAXIMUM BOTTOM DIMENSION OF THE FOUNDATION AS PER DRAWING AND TO ACTUAL DEPTH.QUOTED RATES ARE DEEMED TO INCLUDE TRANSPORTATION AND DISPOSAL OF UNSERVICEABLE EARTH AND BOULDERS FOR ALL LEADS OUTSIDE PLANT BOUNDARY BUT QTTY DISPOSED OFF WILL BE USED IN EARTH RECONCILIATION AFTER DEDUCTING 30% FOR VOIDS.THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SIDE SLOPE AND BACKFILLING THE SAME. EXISTING GROUND LEVEL/T.L SHALL BE RECORDED JOINTLY BEFORE STARTING OF EXCAVATION. COST TOWARDS DEWATERING OF SURFACE OR SUBSOIL WATER SHALL BE DEEMED TO HAVE INCLUDED IN THE QUOTED RATE.BACKFILLING TO BE DONE WITH SERVICEABLE AND REUSABLE SOILS AVAILABLE FROM EXCAVATION AND STACKED EARLIER WITHIN THE PLANT BOUNDARY INCLUDING RE- EXCAVATING, SHIFTING TO THE SITE OF BACKFILLING, BACKFILLING IN LAYERS; WATERING; COMPACTING; TESTING TO ACHIEVE 95% MDD AS PER LAB RESULTS ALL COMPLETE AS PER INSTRUCTIONS OF HPCL.NOTE: DURING EXCAVATION OPERATIONS, THE BOULDERS MAY DAMAGE TYRES OF THE AUTOMOBILES/EARTH MOVING MACHINERY WHICH SHALL BE TAKEN CARE BY CONTRACTOR WHILE QUOTING HIS RATES. | - | Cubic Meters |
| 3 | EXCAVATION OF HARD ROCK | EXCAVATION OF HARD ROCK — EXCAVATION IN HARD ROCK FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL HARD ROCK. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. | - | Cubic Meters |
| 4 | BACK FILLING WITH | BACK FILLING WITH — BACK FILLING AND COMPACTION, BACK FILLING USING EXCAVATED EARTH OF GOOD QUALITY WITH LEAD UPTO 150 METER, BREAKING SOIL LUMPS, CARRYING, CARTING, SPREADING IN LAYERS AT SITE IN LAYERS OF THICKNESS NOT EXCEEDING 200 MM, WATERING, RAMMING/MECH. COMPACTION, DRESSING TO LINE AND LEVEL, ALL AS DIRECTED BY OWNER. PAYMENT WILL BE AS PER COMPACTED MEASUREMENT. SCOPE INCLUDES ENABLING AND TEMPORARY WORKS, BAILING OUT WATER, CARTING OUT AND DUMPING IN HEAPS AT DESIGNATED PLACE(S), SHORING, STRUTTING, FENCING, TEMPORARY AND ENABLING WORKS, CONSUMABLES, EQUIPMENT, TOOLS, TACKLES, MANPOWER, SUPERVISION. | - | Cubic Meters |
| 5 | ANTI TERMITE TREATMENT | ANTI TERMITE TREATMENT — PROVIDING PRE-CONSTRUCTIONAL ANTI-TERMITE TREATMENT BY INJECTING CHLOROPHYRIFOS / HEPTACHLOR / CHLORDANE EMULSIFIABLE CONCENTRATED 20% WITH 1% CONCENTRATION COMPLETE AND CREATING A CONTINUOUS CHEMICAL BARRIER UNDER AND ALL ROUND COLUMN PITS, WALL TRENCHES, BASEMENT EXCAVATION, TOP SURFACE OF PLINTH FILLING, JUNCTION OF WALL AND FLOOR, EXPANSION JOINTS, ALONG THE EXTERNAL PERIMETER OF BUILDING, OVER THE TOP SURFACE OF CONSOLIDATED EARTH ON WHICH APRON IS TO BE LAID, SURROUNDINGS OF PIPES AND CONDUITS, RETAINING WALL, COMPLETE, AS PER SPECIFICATIONS AND STIPULATIONS LAID DOWN IN IS 6313 (PART II), IS6433:1978,IS 2682:1984, AND AS PER DIRECTIONS OF ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR, TOOLS AND IMPLEMENTS ETC. BAILING OF WATER OF ANY KIND, IF ANY, FORMWORK REQUIRED IF ANY TO PROTECT THE SIDES OF TRENCHES AND REMOVAL OF FORMWORK AFTER COMPLETION OF WORK TO THE SATISFACTION OF ENGINEER-IN-CHARGE (PLINTH AREA OF THE BUILDING AT GROUND LEVEL SHALL BE MEASURED FOR PAYMENT). | - | Square Meters |
| 6 | SPLY & FILLING OF MURRUM | SPLY & FILLING OF MURRUM — SUPPLYING & PROVIDING APPROVED QUALITY MURRUM OF PI NOT GREATER THAN 15 AND LABORATORY MDD NOT LOWER THAN 1.7 G/CC FOR FILLING AS PER TENDER SPECIFICATION FOR BACK FILLING, SUB-GRADE & PLINTH FILLING, AROUND THE FOUNDATION, ETC AS APPLICABLE INCLUDING COST OF SUPPLY OF MURRUM FROM BORROW PITS OUTSIDE HPCL PLANT; TESTING, SPREADING IN LAYERS OF 200 MM THICK, WATERING AND COMPACTING WITH PLATE VIBRATOR/HAND COMPACTOR AS DECIDED BY THE SITE-IN-CHARGE TILL MIN. 95%MDD OF LAB STANDARD PROCTOR TEST IS ACHIEVED; TESTING; COMPLYING ALL THE REQUIREMENT OF MINING DEPT/APPLICABLE DEPT OF UT OF D&NH; ROW PAYMENTS; TRANSPORTATION TO SITE FOR ALL APPLICABLE LEADS & LIFTS COMPLETE IN ALL RESPECT AS PER TENDER SPECIFICATION/SCOPE OF WORK ETC, AS DIRECTED BY HPCL EIC. QUOTED RATES ARE DEEMED TO INCLUDE DRESSING UP THE SURFACE, BREAKING CLODS, REMOVAL OF SLUSH AND WATER, REMOVAL OF SURPLUS EARTH AFTER FORMATION, WATERING RE-HANDLING AT SITE AND CONDUCTING INITIAL LABORATORY TESTS ON SAMPLES AND CONSEQUENT INSTITUTE DRY DENSITY/OMC TESTS AT 500 SQM OF AREA AFTER EACH LAYER OF FILLING. THE INITIAL FILLING SHOULD START ONLY AFTER STRIPPING THE AREA FROM BUSHES, GRASS AND OTHER VEGETATION. NO SEPARATE PAYMENT WILL BE MADE FOR CLEARING BUSHES, VEGETATION AND OTHER MATERIALS. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION AND AS DIRECTED BY HPCL EIC COMPLETE.CONTAINING NOT MORE THAN 20% COHESIVE FINES NAMELY CLAY, 20MM AND DOWN SIZE GRADING | - | Cubic Meters |
| 7 | SPLY & FILLING OF SAND | SPLY & FILLING OF SAND — COARSE SAND FILLING: SUPPLYING AND PROVIDING NATURAL RIVER/MACHINE SAND IN LAYERS OF 150M LOOSE THICKNESS AND COMPACTED WITH VIBRO COMPACTOR / MECHANICAL ROLLER &/OR COMPACTOR WITH APPLICABLE TESTING THROUGH SAND REPLACEMENT/PROCTOR METHOD WHEREVER APPLICABLE INCLUDING ALL LABOUR,MATERIALS,TOOLS,WATERING,COMPACTING,ETC ALL COMPLETE. SAND SHALL CONFORM TO ZONE-1 OR ZONE-2. | - | Cubic Meters |
| 8 | PCC 1:4:8 | PCC 1:4:8 — PROVIDING AND LAYING PLAIN CEMENT CONCRETE FOR ALL DEPTHS BELOW AND UPTO PLINTH LEVEL IN FOUNDATIONS,DRAINS, FILLINGS, NON-SUSPENDED FLOORS, PAVEMENTS & RAMPS OR ANY OTHER WORKS ETC. INCLUDING SHUTTERING, TAMPING, RAMMING, VIBRATING, CURING, SHUTTERING ET | - | Cubic Meters |
| 9 | RCC M20 | RCC M20 — RCC M20-SUPPLYING AND LAYING OF DESIGN MIX, REINFORCED CEMENT CONCRETE OF M-20 (INCLUDING SHUTTERING AND EXCLUDING REINFORCEMENT) USING SULPHATE RESISTANT CEMENT (20 MM DOWNGRADED COARSE AGGREGATE. ) AT ALL DEPTHS AND HEIGHTS IN ALL TYPES OF FOUNDATIONS, FOOTINGS, DUCTS, WALLS, SLABS, DRAINS, CULVERTS, BRIDGES AND ANY OTHER WORKS BOTH IN UNDERGROUND AND SUPER STRUCTURES WORKS ALL COMPLETE WITH ALL BYE WORKS AS PER DRAWINGS, SPECIFICATION AND INSTRUCTION OF HPCL EIC. | - | Cubic Meters |
| 10 | RCC M25 | RCC M25 — PROVIDING AND LAYING REINFORCED CEMENT CONCRETE M25 AT ALL LEVELS: PROVIDING AND LAYING IN POSITION CONTROLLED GRADE REINFORCED CEMENT CONCRETE WITH DESIGN MIX OF REQUIRED GRADE AT ALL LOCATIONS AND LEVELS USING 20 MM AND DOWN GRADED AGGREGATES IN ALL TYPES OF WORKS [INCLUDING STEEL FORMWORK, LEAVING POCKETS, PLACING OF CONDUITS, MAKING OPENINGS, POCKETS PLACING INSERTS/FAN HOOKS SLEEVES IN COLUMNS/BEAMS/SLABS ETC.] MACHINE MIXING, LIFTING, PLACING, MACHINE VIBRATING, TAMPING, CURING ETC. AS SPECIFIED, COMPLETE AS PER DRAWINGS AND/OR AS DIRECTED BY HPCL ENGINEER-IN-CHARGE. ALL STRUCTURES, COLUMNS, BEAMS, FLOOR SLABS, ROOF SLABS, WALLS, PARAPETS, SUNSHADES LINTELS, STAIRCASES, FINS, CHAJJAS, PARDIS, SILLS, COPINGS, PROJECTIONS, ETC. (UP TO A DEPTH OF 3 METERS. AND UP TO HEIGHT OF 15 METERS.) ARE INCLUDED IN SCOPE OF THIS ITEM. RMC PLANT SHOULD BE APPROVED BY ENGINEER-IN- CHARGE/ARCHITECT PRIOR TO START ANY WORK. ALL NECESSARY TESTS OF MATERIALS TO BE PERFORMED AS MENTIONED IN LIST, BEFORE ANY MATERIAL TO BE USED AT SITE. THE PARTY SHALL HAVE TO PRODUCE MANUFACTURER'S CERTIFICATION ON THE MATERIAL QUALIFYING CRITERIA STATED IN IS CODE AND LIMITS SPECIFIED IN THE IS/CPWD SPECIFICATION BEFORE THE MATERIAL TO BE SITED. HPCL RESERVES THE RIGHT TO DO RANDOM SAMPLING AND TESTING AS PER IS/CPWD SPECIFICATION TO ASSESS MANUFACTURER'S CERTIFICATION ON QUALIFYING NORMS SPECIFIED IN THE CPWD SPECIFICATION. COST INCLUDE EXPENSES FOR TESTING MATERIAL TRANSPORTATION AND THEIR TEST RESULTS CERTIFICATES FROM APPROVED LAB. THE PARTY SHALL HAVE TO SUBMIT SUPPLIER (SUPPLIER/SOURCE OF MATERIAL AS APPROVED BY HPCL) BILLS ALONG WITH TESTING REPORTS. NOTE: 1) THE RATE ALSO INCLUDES COST OF PROVIDING OFFSETS, CUTOUTS, GOOD QUALITY PLYWOOD/STEEL SHUTTERING, CONSTRUCTION JOINTS, MAKING HOLES IN OR CUTTING FORMWORK FOR TAKING OUT DOWEL BARS, HACKING THE EXPOSED SURFACES TO RECEIVE PLASTER AS NECESSARY. NOTE: 2) TO GET REQUIRED WORK ABILITY OR FOR ANY OTHER REASON WHATSOEVER IF ADDITIVES, PLASTICIZER ETC. ARE TO BE ADDED THE COST OF PROCURING AND ADDING THE SAME SHALL BE INCLUDED IN THE COST OF CONCRETE UNLESS SPECIFIED OTHERWISE. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000527-HD-10157.pdf
TENDER_DOCUMENT • 12.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .