Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
18 Sept 2026, 4:00 pm6d left
Er. Fayaz Ahmed Sheikh
Executive Engineer REW Ramban
As per NIT
2026_RDPR_324261_2
eNIT25.7 of REW Ramban Block SangaldanGD under PRI/DDC of 2026-27
Open Tender
Civil Works
Percentage
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Ramban
₹1,940
11 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 1.66 | cum | 592.9 | ₹984.21 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10(1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.2 | cum | 4,826.5 | ₹965.3 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3';6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% boulders | 1.1 | cum | 5,733.6 | ₹6,306.96 |
| 4 | Dumping of stones including cost of stones | 0.47 | cum | 1,205 | ₹566.35 |
| 5 | R R Stone masonary with hard stone from nallah in foundation and plinth with cement mortar 1:6 mix | 3.5 | cum | 6,922.1 | ₹24,227.35 |
| 6 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work in Suspended floor, roofs, balconies etc. with:1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.8 | cum | 9,395.7 | ₹7,516.56 |
| 7 | Steel reinforcement for RCC work i/c cuting, bending, binding and placeing in position all complete | 63.85 | Kgs | 92.85 | ₹5,928.47 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | 4.46 | sqm | 286.35 | ₹1,277.12 |
| 9 | Suspended floor roofs etc. | 3.4 | sqm | 628.95 | ₹2,138.43 |
| 10 | Extra for stone works above plinth level | 3.5 | cum | 1,415.3 | ₹4,953.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.56 MB
BOQ_1093610.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .