Directorate of Municipal Administration
construction of Retaining wall for Solid waste Management unit SLF Land in Harisandra Survey no 166 in Bidadi TMC Limits
302383
DMA/2026-27/OW/WORK_INDENT58761
Open
Other Works
DMA Town Municipal Council Bidadi
4 documents required · 0 mandatory · 4 optional
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
Satisfactory completion as a prime contractor for at least any construction work to an similar work extent of 50% of the cost of the work.
Work done certificate
List of existing commitments and ongoing works
Pwd certificate
Executed in any one year,80% (for a continues period of 12 months)the following (g)minimum quantities of work 1.Earth work excavation 240.00 cum 2.Providing & Laying 40 mm down size aggregate PCC 1:3:6 8.00cum 3.RCC M20/M25 grade concrete 141.00 cum 4.Reinforcement steel 6.50 Tonns
Liquid assets and/or availability of credit facilities of not less than Rs.6 lakhs (Credit lines/letter of credit/certificates from Nationalized/Scheduled banks for meeting the fund requirement for the work in the format given below
Gst certificate
To qualify for award of this contract, each tenderer in its name should have in the last five years (2021-22 to 2025-26)(a)Achieved in at least two financial year an average annual financial turnover of Rs.30.00Lakhs
₹640
₹60,000
1 Jun 2026
1 Jun 2026
18 Jun 2026
11 Jun 2026
construction of Retaining wall for Solid waste Management unit SLF Land in Harisandra Survey no 166 in Bidadi TMC Limits
Clearing and Grubbing Road Land : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ear...
Earth work excavation for foundation of structure upto 3 mtrs. By mechanicle means as per drawing and technical specification, including setting out, providing shoring, strutting and bracing, removal ...
Earth work excavation for foundation of structure upto 3 mtrs. By mechanicle means as per drawing and technical specification, including setting out, providing shoring, strutting and bracing, removal ...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates an...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...