Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 CrAccepted-AOC HANDIAYA CHOWK BARNALA | BARNALA | BARNALA | PUNJAB | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹26.1 Cr+₹37.6 L (1.47%)Rejected-AOC REGD OFFICE 1ST FLOOR SCF 14 I BLOCK MARKET SARABHA NAGAR LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L2 | Rejected-AOC Not a Lowest Bidder | |
| 3 | L3₹26.6 Cr+₹86.7 L (3.38%)Rejected-AOC 1586 GALI NO 1 NEJA MANIA CHAUK SECTOR LAKHI COLONY BARNALA | BARNALA | BARNALA | PUNJAB | L3 | Rejected-AOC Not a Lowest Bidder | |
| 4 | L4₹26.8 Cr+₹1.1 Cr (4.36%)Rejected-AOC SAHNEWAL DEHLON ROAD VILL PADDI LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L4 | Rejected-AOC Not a Lowest Bidder |
Tender Value
₹26.9 Cr
EMD Value
₹53.8 L
Closing Date
22 Dec 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EXECUTIVE ENGINEER Construction Division PWD B and R Malerkotla
Upgradation of Plan Road Babanpur to Jourepul (Including Maintenance of Road for 5 Year (One Year Defects Liablity Period plus 4 Year Maintenance.
2025_CEPW_154149_1
Bid Notice No.23 date. 19.11.2025
Open Tender
Civil Works - Roads
Percentage
270 days
Malerkotla
Please refer Tender documents.
25 documents required · 25 mandatory
₹50,000
₹53.8 L
10 Feb 2026
21 Nov 2025
22 Dec 2025
21 Nov 2025
22 Dec 2025
21 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing brick on end edging complete in all respect as per PWD specifications. | - | Per Cum | - | - |
| 2 | Loosening, levelling and compacting original ground below embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm,missed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per technical clause 305 of MORT&H specification. | - | Per Cum | - | - |
| 3 | Construction of granular sub-base by providing material as per grading-III ( Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications | - | Per Cum | - | - |
| 4 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | - | Per Mtr | - | - |
| 5 | Water Bound Macadam Grading I (with screening)
Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications | - | Per Cum | - | - |
| 6 | Water Bound Macadam Grading II (with screening)
Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H
specifications | - | Per Cum | 2,531.99 | - |
| 7 | Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications | - | Per Sqm | - | - |
| 8 | Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications | 99,940.33 | Per Sqm | 23.07 | ₹23,05,623.41 |
| 9 | Providing and laying bituminous concrete 40mm thick with batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4%, laying with a Paver inisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications:-
NOTES:-
(i) Job mix formula for the bituminous concrete shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research laboratory Patiala before adoption at site for execution.
(ii) The specifications of this item for analytic purpose is kept with bitumen content @ 5.4% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variations shall be worked out with the approved formula.
TECHNICAL NOTE:-
i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. | 3,994.11 | Per Cum | 11,363.31 | ₹4,53,86,310.1 |
| 10 | Construction of embankment / Shoulder with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications | - | Per Cum | 436.59 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
SBD1.pdf
Tender Documents • 16.77 MB
Technicalconditions.pdf
Additional Documents • 2.46 MB
Copaconditions.pdf
Additional Documents • 2.76 MB
BOQ.pdf
Tender Documents • 3.19 MB
BOQ_312265.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .