| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹1.8 Cr+₹10.3 L (6.08%)Accepted-Finance AT BHOKANJI PO BADAMUNDILO PS DIST JAGATSINGHPUR | L2 | Accepted-Finance Due to L2 | |
| 3 | l3₹1.8 Cr+₹11.4 L (6.74%)Rejected-Finance | l3 | Rejected-Finance Due to L3 | |
| 4 | L4₹1.8 Cr+₹11.6 L (6.85%)Rejected-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹1.9 Cr+₹18.0 L (10.7%)Rejected-Finance PANCHI TIRTOL JAGATSINGPUR ODISHA 754103 | PANCHI TIRTOL | JAGATSINGHPUR | ODISHA | 754103 | L5 | Rejected-Finance Due to L5 |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
13 Feb 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CCE Cuttack RandB Circle
O/o CCE Cuttack RandB Circle
Road work
2026_EICCL_125349_6
CCE.Ctc.(RandB)14/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
150 days
Cuttack
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹2.3 L
Yes
29 Sept 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grubbing road land including uprooting rank vegetation grass bushes shurbs saplings and trees of girth upto 300mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to used etc complete as per specification and direction of Engineer in charge | 1,144.5 | Sqm | 8.45 | ₹9,671.03 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines grades and cross section and transporting to the embankment location within all lead and lifts upto 1000m. etc. complete as per specification and direction of Engineer-in-charge | 3,048.04 | cum | 74.79 | ₹2,27,962.91 |
| 3 | Disposal of excavated earth with all lift and lead upto 1000 mtr. including all cost, conveyance, T&P, labour required for the work etc. complete as per direction of the Engineer in charge | 2,705 | Cum | 276.01 | ₹7,46,607.05 |
| 4 | Scarifying the existing bituminous road surface to a depth of 50mm. and disposal of scarified materials with in all leads and lifts and lead upto 1000 mtr. etc. complete as per specification and direction of Engineer-in-charge | 3,204.6 | Sqm | 6.03 | ₹19,323.74 |
| 5 | Reworking the scarified Bituminous surface suitably after supplementing the base materials with sand and compacting the finished surface as per technical specification and as per clause 501.8.3.2 of MORT&H specification for Road & Bridge work (5th Revision) | 5,341 | sqm | 11.24 | ₹60,032.84 |
| 6 | Loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm. mixed with water of OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction and clause 305 of MORT&H specification for Road & Bridge works(5th Revision) etc complete as directed by the Engineer in charge | 1,087.28 | Cum | 36.04 | ₹39,185.57 |
| 7 | Construction of granular sub-base by providing close graded Granular sub-base Grading-VI materials as per table 400-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MORT&H Specification for Road & Bridge works ( 5th Revision). | 1,109.03 | cum | 2,965.68 | ₹32,89,028.09 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MORT&H specification for Road and Bridge works(5th Revision). | 2,276.42 | cum | 3,074.3 | ₹69,98,398.01 |
| 9 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surfce and spraying primer @ 0.6kg. per sqm.using mechanical broom as per Clause 502 of MORT&H Specification for Road & Bridge works (5th Revision.) | 11,673.9 | Sqm | 40.41 | ₹4,71,742.3 |
| 10 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @ 0.2kg. per sqm.on prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MORT&H Specification for Road & Bridge works (5th Revision.) | 11,673.9 | Sqm | 14.34 | ₹1,67,403.73 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
DTCN.pdf
Tender Documents • 0.53 MB
Clarification_OM.pdf
Additional Documents • 2.26 MB
BOQ_578710.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .