| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | ₹12.9 L Quoted ₹13.5 L | L1 | Accepted-AOC low |
| 2 | L2₹14.1 L+₹52,777.56 (3.90%)Rejected-AOC VILLAGE KHARI KALAN PO CHOLANG DISTT JALANDHAR | JALANDHAR | ₹14.1 L+₹52,777.56 (3.90%) | L2 | Rejected-AOC High Rate |
| Sl No | Description | Qty | Unit | AVTAR SINGH CONTRACTOR L1 | GURJIT SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding
2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 19.16 | cum | 221 ₹4,234.36 Lowest | 250 ₹4,790 |
| 2.00 | Cement concrete 1:8:16 with stone ballast 20 mm gauge in foundation and plinth | 3.83 | cum | 4,076 ₹15,611.08 Lowest | 4,100 ₹15,703 |
| 3.00 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 17.27 | cum | 8,500 ₹1,46,795 Lowest | 8,600 ₹1,48,522 |
| 4.00 | Damp proof course 4cm thick of cement concrete 1:2:4 with water proofing compound as per manufactures guidelines. | 7.07 | sqm | 258 ₹1,824.06 Lowest | 300 ₹2,121 |
| 5.00 | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level | 20.94 | cum | 8,500 ₹1,77,990 Lowest | 8,500 ₹1,77,990 Lowest |
| 6.00 | Reinforced cement cocrete M-20 mechanically batch mixed using batch type concrete mixer as per IS: 1791 and vibrated by needle vibrator but excluding steel reinforcement, centering and shuttering in superstructure. | 1.03 | cum | 7,162 ₹7,376.86 Lowest | 7,200 ₹7,416 |
| 7.00 | Reinforced cement concrete M-25 mechanically batchmixed using batch type concrete mixer asper IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 3.55 | cum | 6,589 ₹23,390.95 Lowest | 6,600 ₹23,430 |
| 8.00 | Reinforced cement concreteM-30 mechanically batchmixed using batch type concretemixer as per IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 0.43 | cum | 6,926 ₹2,978.18 Lowest | 7,000 ₹3,010 |
| 9.00 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 8.85 | cum | 7,486 ₹66,251.1 Lowest | 7,500 ₹66,375 |
| 10.00 | Reinforced cement concrete M-30 mechanically batchmixed using batch type concretemixer asper IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 3.14 | cum | 8,135 ₹25,543.9 Lowest | 8,200 ₹25,748 |
Tender Value
₹12.3 L
EMD Value
₹24,513
Closing Date
27 Jul 2026, 11:00 amClosed
Executive Engineer
Executive Engineer,Ropar canal and GWD
Estimate for construction of washrooms and provision of electricity at Ropar head works
2026_WR_171979_1
43/22A/2026-27
Open Tender
Miscellaneous Works
Item Rate
90 days
Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹24,513
office of Executive Engineer,Ropar canal and GWD
17 Sept 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding
2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 19.16 | cum | - | - |
| - | Cement concrete 1:8:16 with stone ballast 20 mm gauge in foundation and plinth | 3.83 | cum | - | - |
| - | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 17.27 | cum | - | - |
| - | Damp proof course 4cm thick of cement concrete 1:2:4 with water proofing compound as per manufactures guidelines. | 7.07 | sqm | - | - |
| - | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level | 20.94 | cum | - | - |
| - | Reinforced cement cocrete M-20 mechanically batch mixed using batch type concrete mixer as per IS: 1791 and vibrated by needle vibrator but excluding steel reinforcement, centering and shuttering in superstructure. | 1.03 | cum | - | - |
| - | Reinforced cement concrete M-25 mechanically batchmixed using batch type concrete mixer asper IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 3.55 | cum | - | - |
| - | Reinforced cement concreteM-30 mechanically batchmixed using batch type concretemixer as per IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 0.43 | cum | - | - |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 8.85 | cum | - | - |
| - | Reinforced cement concrete M-30 mechanically batchmixed using batch type concretemixer asper IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 3.14 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_349830.xls
BOQ • 0.28 MB
ccess.pdf
Tender Documents • 0.14 MB
GSTregardingLetter2.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .