| Sl No | Description | Qty | Unit | J JAGADESH KUMAR L1 | P RAJALINGAM CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00NCTPS–I-CM Circle – CM-II - Strengthening of Eastern side bund of secondary pond at ash dyke (Ch.910.00 to Ch.1026.00m). | |||||
| 1.01 | Excavation and transporting of excess earth/silt available at the ash dyke and depositing and leveling on the upstream side slopes of secondary pond and compacting to achieve the desired density including cost of all materials, labour charges, T&P etc., complete and as directed by the departmental Engineer at site. (Earth/silt will be supplied by TANGEDCO at free of cost from Ash dyke). | 522 | cum | 232 ₹1.2 L | 236 ₹1.2 L |
| 1.02 | Providing, laying and fixing of RTS rod including cost of Material, transporting, cutting, bending, placing in position, tools and plants etc complete as directed by the Engineer at site. | 5,510 | Kg | 92.5 ₹5.1 L | 95 ₹5.2 L |
| 1.03 | Providing RCC 1:2:4 using 6mm to 12mm HBG broken stone for southern side slope of bund in the secondary pond at Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete as directed by the Engineer at site (Excluding cost of reinforcement). | 103.6 | cum | 9,878 ₹10.2 L | 10,180 ₹10.5 L |
Tender Value
₹20.2 L
EMD Value
₹20,100
Closing Date
17 Dec 2025, 2:00 pmClosed
SE/CM/NCTPS-I
NCTPS-I Chennai-120
Strengthening of Eastern side bund of secondary pond at ash dyke (Ch.910.00 to Ch.1026.00m).
2025_EB_628230_1
CE /NCTPS-I/SE/ CM/129/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-1
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹20,100
Yes
12 Jun 2026
2 Dec 2025
18 Dec 2025
2 Dec 2025
17 Dec 2025
2 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
NCTPS–I-CM Circle – CM-II - Strengthening of Eastern side bund of secondary pond at ash dyke (Ch.910.00 to Ch.1026.00m).
Contract No: CE/SE/CM/NCTPS-I/ 129/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 NCTPS–I-CM Circle – CM-II - Strengthening of Eastern side bund of secondary pond at ash dyke (Ch.910.00 to Ch.1026.00m).
1.01 Excavation and transporting of excess earth/silt available at the ash dyke and depositing and leveling on the upstream side slopes of secondary pond and compacting to achieve the desired density including cost of all materials, labour charges, T&P etc., complete and as directed by the departmental Engineer at site. (Earth/silt will be supplied by TANGEDCO at free of cost from Ash dyke). Item 1 522 cum Excess(+) Full Conversion INR
1.02 Providing, laying and fixing of RTS rod including cost of Material, transporting, cutting, bending, placing in position, tools and plants etc complete as directed by the Engineer at site. Item 2 5510 Kg Excess(+) Full Conversion INR
1.03 Providing RCC 1:2:4 using 6mm to 12mm HBG broken stone for southern side slope of bund in the secondary pond at Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete as directed by the Engineer at site (Excluding cost of reinforcement). Item 3 103.6 cum Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_751118.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid