Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.7 LAdmitted-Finance 1057 1241 ABOVE BANK OF BARODA ABID COMPLEX GOVIND PRASAD JHARPADA BHUBANESWAR KHURDA KHORDHA ODISHA 751006 | KHORDHA | ODISHA | 751006 | -26.10% | ₹34.7 L | L1 | Admitted-Finance |
| 2 | L2₹34.9 LAdmitted-Finance | -25.80% | ₹34.9 L | L2 | Admitted-Finance |
| 3 | L3₹39.8 LAdmitted-Finance | -15.30% | ₹39.8 L | L3 | Admitted-Finance |
| 4 | L4₹40.6 LAdmitted-Finance | -13.55% | ₹40.6 L | L4 | Admitted-Finance |
| 5 | L5₹41.8 LAdmitted-Finance | -11.00% | ₹41.8 L | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
9 Jul 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer U.P. Jal Nigam (E/M) (Urban), 22, Jopling Road, Lucknow.
Construction of a Tubewell including Pumping Plant, 1000 LPM discharge, Piller and Gravel feed chambers and 3 MONTHS trial and run etc.
2026_UPJNM_1164498_1
746/V-6/76 Dated 25-06-2026
Open Tender
Composite Works
Turn-key
60 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer, Construction Division E M
₹94,000
7 Aug 2026
27 Jun 2026
10 Jul 2026
27 Jun 2026
9 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of a Tubewell including Pumping Plant, 1000 LPM discharge, Piller and Gravel feed chambers and 3 MONTHS trial & run etc | |||||
| 2 | Drilling of Borehole for Tubewell construction by RC Rig Machine including transportation, erection, dismantling of Rig and assosiated T&P complete in all respect including requried all material, labour etc.
Transportation, Erection, Dismantling of Rig Machine | 1 | Job | 31,356 | ₹31,356 |
| 2.01 | Drilling of 600 mm. dia bore from G.L. to 80 m -0 to 80 M. BGL | 80 | Mtr. | 2,197 | ₹1,75,760 |
| 2.02 | Drilling of 500 mm. dia bore from 80 M to 100 m- 80 M to 100 M. BGL | 20 | Mtr. | 1,852 | ₹37,040 |
| 2.03 | Drilling of 500 mm. dia. Bore from 101 M to 200 M
101 M to 200 M. BGL. | 100 | Mtr. | 2,168 | ₹2,16,800 |
| 2.04 | Logging of bore hole by departmental/Approved electric logger | 1 | No | 17,271 | ₹17,271 |
| 3 | Tubewell assembly : M.S. tubewell assembly with all required parts like plain,
slotted pipe (as required upto 50% of plain pipes) rings
, well cap, bail plug, clamp, reducer,
central guide, support structure etc.
as required & per typed design complete in all respect. As per IS- 4270
300 MMØ Housing Pipe 7.1 mm thick | 72 | Mtr. | 5,168 | ₹3,72,096 |
| 3.01 | 200 MMØ Plain Pipe 7.1 mm thick | 78 | Mtr. | 3,575 | ₹2,78,850 |
| 3.02 | 200 MMØ Slotted Pipe 7.1 mm thick | 30 | Mtr. | 5,363 | ₹1,60,890 |
| 4 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. 300 mm. dia. Housing Pipe from G.L to 72 M BGL | 72 | Mtr. | 355 | ₹25,560 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
documents.pdf
Tender Documents • 4.96 MB
BOQ_2183620.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].